Original source · versioned page text
2019-02-12 Attachment 1 to Item 3 - Stormwater Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4. Lifecycle Management Plan
Assets
Council’s Stormwater Infrastructure plays a vital role in managing stormwater drainage within the
Noosa Shire. There are many different asset types within the Stormwater Infrastructure asset
management plan, with various units of measurement.
These assets included in this AMP are summarised below:
o 9,331 Pipes (223km)
o 9,640 Pits
o 3,312 Structures
o 14 Bio retention Basins
o 15 Gross Pollutant Traps (GPT)
o 9 Open drains
Asset Valuation
The value of the Stormwater Infrastructure Assets, at the end of the financial year 2017/2018 for the
purposes of this AMP is summarised below.
Current Asset Accumulated
2018 Written Down Value
Cost Depreciation
Totals $ 177,738,098 $ 57,692,742 $ 120,045,357
Table 1: Stormwater Infrastructure Asset Valuation
Asset Condition
Levels of service and asset management decision making is directly linked to asset condition; this
determines what condition the asset should be in before an asset management intervention. The
intent of current and future Condition Assessments (CA) is to:
• Provide a robust and repeatable process for carrying out condition assessments on Council’s
Stormwater Infrastructure assets;
• Use condition assessments to develop programs for intervention with regards to further
inspection, monitoring, maintenance and renewals;
• Provide a basis for information for the modelling of condition data for likelihood of asset failure
for those assets not inspected.
A consistent condition ranking scale has been chosen by Council as the framework for measuring
Stormwater Infrastructure assets, based on the 1 to 5 ranking according to the International
Infrastructure Management Manual (IIMM). Any asset scoring 4 (fair) to 5 (poor) will be considered
and prioritised under an asset specific renewal program.
On the completion of the data reconciliation process, the collected condition assessment attributes
will be loaded into the Technology One asset system, the data will be analysed and modelled to
create a renewal program for those assets. It is anticipated that it will take 3 -5 years to complete a
full stormwater network condition assessment.
Asset Management Plan: Stormwater Infrastructure Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.