Council archive · source document
Decision Notice - Minor Change - MCU19 0008 02 [As Published] · MCU19/0008.02
Built form
6. No structures or buildings are to be located within the 15-metre setback to the eastern
boundary, except where uncovered, unenclosed cantilevered balconies that do not extend
greater than 3 metres seaward of the coastal building line, or as otherwise detailed on
Approved Plan 108-DA6.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping
8. A minimum of 20% of the site must be retained as soft landscaping.
9. A mix of native landscaping, such as ground covers, shrubs and trees, is retained/provided
for a width of 5m along the seaward/eastern boundary of the site to provide adequate
landscape buffering to protect the character of the beachfront.
10. Existing native vegetation on the site must be retained, except where required to be removed
to accommodate the approved dwelling.
11. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Coastal Protection
12. Gates must not be installed along the eastern property boundary to gain direct access to the
beachfront.
13. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment.
Site Access and Driveways
14. A sealed access driveway must be provided from Arakoon Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must be generally in accordance with SCG Consulting’s
Driveway & Access Plan (32288-OW2.1) dated December 2022.
Construction Management Plan
15. A Construction Management Plan must be submitted to Council prior to any demolition works
and must specifically address the following:
a. Traffic Management during all aspects of the demolition/construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction
ii. Maintenance of safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased
iii. Proposed fencing to the site during the construction phase of the development
iv. Adequate parking arrangements for construction workers
Page 3 of 8
Document Set ID: 22438820
Version: 3, Version Date: 26/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - MCU19 0008 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 165 KB (small file)
- File type
No other editions are linked here.