                      9.1.      Clearly marking vegetation to be retained with flagging tape;
                      9.2.      Installing protective fencing around the drip line of the vegetation;
                      9.3.      Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
                                cause interference with vegetation; and
                      9.4.      Low impact construction techniques are used around vegetation to minimise
                                interference with the vegetation.
               10.    Cleared vegetation is to be suitably processed by one of the following methods and removed
                      from the site:-
                      10.1. Processing through a woodchipper or shredder. The resulting mulch is to be
                            stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
                            with a minimum of 10 metres between edges of heaps.
                      10.2. Disposal for firewood.
                      10.3. Disposal for landscaping purposes.
                      10.4. Transport to alternative site for breaking down materials provided that all necessary
                            permits have been obtained to allow the alternate site to be used for this purpose.
                      10.5. The Applicant is advised that other methods may be considered provided full details
                            of the method are submitted.
                      10.6. The applicant is advised that burning off is an unacceptable method of disposal.
               11.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
                      not constructed under overhead electricity transmission lines, or within any easements.
               12.    Gates must not be installed along the rear property boundary.
               Demolition or Relocation of Existing Dwelling
               13.    Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
                      protected from damage and made safe to the standard required by the regulatory authority;
               14.    All infrastructure must be disconnected, capped or sealed including:-
                              electricity meters removed and electrical wires disconnected; and
                              telephone lines are disconnected; and
                              high speed data cables and television provider boxes are disconnected and removed
                              to the standard required by the regulatory authority;
               15.    All building materials containing asbestos, including asbestos cement sheeting or roofing and
                      lagging, must be removed from the building and disposed of in accordance with industry best
                      practice.
               16.    Waste generated during construction must be stockpiled in a centralised location and
                      covered as required to prevent material being blown onto adjoining properties including the
                      road reserve or food waste from generating vermin. All site waste must be disposed of to an
                      approved waste disposal facility either directly or via an approved waste receptacle and
                      collection service. Storage areas are to be located near the temporary access to the site so
                      that access can be gained with out damage to infrastructure.
               17.    All building materials containing asbestos products must be disposed on in accordance with
                      industry best practice.
               18.    A temporary crossing must be provided to protect road reserve infrastructure including kerb
                      and channel;
               19.    Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
                      the relocation site or between the sites must be repaired or reinstated to at least pre-existing
                      conditions.




                                                                                                        Page 3 of 7
Document Set ID: 23210787
Version: 2, Version Date: 27/08/2024

Used in these records

About this file

File size
182 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132008 413 01 - (AS PUBLISHED).pdf · 182 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.