9.1. Clearly marking vegetation to be retained with flagging tape;
9.2. Installing protective fencing around the drip line of the vegetation;
9.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with vegetation; and
9.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
10. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
10.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
10.2. Disposal for firewood.
10.3. Disposal for landscaping purposes.
10.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
10.5. The Applicant is advised that other methods may be considered provided full details
of the method are submitted.
10.6. The applicant is advised that burning off is an unacceptable method of disposal.
11. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
12. Gates must not be installed along the rear property boundary.
Demolition or Relocation of Existing Dwelling
13. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority;
14. All infrastructure must be disconnected, capped or sealed including:-
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed
to the standard required by the regulatory authority;
15. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, must be removed from the building and disposed of in accordance with industry best
practice.
16. Waste generated during construction must be stockpiled in a centralised location and
covered as required to prevent material being blown onto adjoining properties including the
road reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.
17. All building materials containing asbestos products must be disposed on in accordance with
industry best practice.
18. A temporary crossing must be provided to protect road reserve infrastructure including kerb
and channel;
19. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
the relocation site or between the sites must be repaired or reinstated to at least pre-existing
conditions.
Page 3 of 7
Document Set ID: 23210787
Version: 2, Version Date: 27/08/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132008 413 01 - (AS PUBLISHED)Related documentApplication case desk ↗
About this file
- File size
- 182 KB (small file)
- File type
No other editions are linked here.