Skip to the record
The gold standard in government transparency.

Council archive · source document

Minor Change Existing Approval 132008 413 01 - (AS PUBLISHED) · 132008.413.01

of 7

Text shows just the words. Original shows the document exactly as it was published.

               20.    Sediment and erosion control measures must be placed on site prior to the works
                      commencing and shall be maintained until all works are complete. The erosion and sediment
                      control measures shall be in accordance with the “Best practice guidelines for control of
                      stormwater on building sites” prepared by Healthy Waterways (copy attached or available at
                      www.healthywaterways.org).
               21.    All disturbed areas must be revegetated or otherwise stabilised at the completion of the
                      works. Disturbed areas are revegetated using species identified in PSP3 – Landscaping
                      Plants and Guidelines.
               22.    The transportation of all materials to and from the site must be undertaken in a manner such
                      that no particle matter escapes onto a public road. All vehicles carrying out materials either
                      to or from the site shall be covered to prevent materials including dust being windblown from
                      the vehicle.
               23.    A Waste Management Plan shall be submitted for the demolition to the Land Use Section of
                      Noosa Council, prior to the development permit for building works being issued. The Plan
                      shall contain the following information:-

                        MATERIALS ON-SITE                     DESTINATION

                                                              Re-use and Recycling      Disposal

                        Expected         Estimated volume On-site *specify        Off-site       *Specify
                        waste            (m³)             proposed reuse          *specify       contractor          &
                        materials                         or        onsite        contractor   & landfill site
                                                          recycling               recycling
                                                          methods                 outlet

                        Excavation
                        material

                        Green waste

                        Bricks

                        Concrete

                        Timber       –
                        please specify

                        Plasterboard

                        Metals       –
                        please specify

                        Asbestos

                        Other – please
                        specify

               NOTE: Details of site area to be used for onsite separation, treatment and storage (including
               weather protection) shall be provided on the plan drawings accompanying your application
               5.     REFERRAL AGENCIES

               Not applicable




                                                                                                       Page 4 of 7
Document Set ID: 23210787
Version: 2, Version Date: 27/08/2024

Used in these records

About this file

File size
182 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132008 413 01 - (AS PUBLISHED).pdf · 182 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.