Original source · versioned page text
16216_Final Planning Report_150217
Attached to the e-mail Planning report, Traffic impacts, Landscape plans MCU17/0014.
PROJECT URBAN – 16216 February 2017 The landscape plan illustrates that the landscape buffers will be planted with a variety of native species that are consistent with the Council’s list of preferred plants. Within the site, it should be noted that the landscaping has also been prepared to provide clear separation between the residential and commercial uses. ACCESS AND PARKING The proposed vehicle entrance and exist have minimum widths of 6m. The entrance and exit points have been located to minimise any potential impacts on the existing street trees in front of the site. As the site plan and landscape concept plan in the supporting documents illustrate, the intent is to retain these existing trees but should it prove to be impractical to do so at the detailed design stage, it is suggested that replacement planting could occur elsewhere within the street verge in front of the site. The proposed development includes a total of 53 car parking spaces in the basement level. 18 of the parking spaces, including visitor spaces located next to the lifts and stairs, are provided for the residential units. The remaining 35 spaces are provided for the commercial tenancies. In addition to the car parking, a total of 8 motorbike parking spaces and 18 bike parking spaces are provided. The number of car, motorbike and bike parking spaces complies with the requirements of the Driveways & Parking Code in the Noosa Plan. The Parking & Traffic Impact Assessment Report prepared by Grey Australia Pty Ltd, which is included in the supporting documents, confirms that the proposed access and egress from the site will be restricted to left in left out only and provides further details with regard to the detailed design of the car park layout. SERVICING Bin enclosures are provided on the northern boundary of the site. As agreed with Council during pre-lodgement discussions, the refuse bins will be collected and emptied from the Council land to the rear of the site. INFRASTRUCTURE The Site based stormwater management plan has been prepared by Bornhorst + Ward, which is included in the supporting documents. The Plan provides details of the proposed strategy for collecting, treating and discharging stormwater from the site. The report has been prepared in accordance with Council policy and current best practice. The recommends a detention tank which will be located below the central plant system, a Stormwater 360 Enviropod 200 (or similar) gross pollutant trap and six (6) 690mm Stormwater360 PSorb (or equivalent) cartridges located within the detention tanks. Development Assessment Report - Material Change of Use Page 10 of 25 (Multiple Housing Type 4, Commercial Type 1 Office/Type 2 Medical) 30-32 Doonella Street, Tewantin QLD 4565 Lot 32 on RP893427 & Lot 903 on T1631
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Final Planning Report_150217.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.