Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

16216_Final Planning Report_150217

Attached to the e-mail Planning report, Traffic impacts, Landscape plans MCU17/0014.

of 25

Page text read automatically using OCR, there may be inaccuracies

PROJECT URBAN – 16216                                                                   February 2017


6.0 STATE PLANNING INTERESTS

6.1 SUSTAINABLE PLANNING ACT 2009


The Sustainable Planning Act 2009 (SPA) provides the overall statutory planning framework for
Queensland. The subject site is located within the local government boundaries of Noosa Council
and is subject to the provisions contained in the Noosa Plan 2000, as amended 28 October 2016
(the Planning Scheme). Based on the relevant provisions of the Planning Scheme the proposed
development requires impact assessment and those matters which the Assessment Manager
must have regard to when assessing the application are set out in section 314 of SPA.

6.2 STATE PLANNING REGULATORY PROVISIONS


There are currently ten (10) State Planning Regulatory Provisions (SPRPs) in force but only the
SPRP (adopted charges) has any relevance to this proposal. The SPRP (adopted charges)
establishes a maximum adopted charge for trunk infrastructure. Noosa Council has adopted a
regulated infrastructure charges schedule which is consistent with the SPRP. As infrastructure
contributions for this development will be payable in accordance with the Council’s adopted
schedule, no further assessment against the SPRP has been undertaken.



6.3 STATE PLANNING POLICY


As the Planning Scheme predates the current State Planning Policy (SPP), the proposal has been
reviewed against the interim development assessment requirements set out in Part E of the SPP.
This review has identified that the requirements with regard to water quality are applicable to the
development. As a result, the proposal has been assessed against the SPP code: Water Quality
and has been found to be compliant with the relevant sections of the code as the application is
supported by a site based stormwater management plan which includes measures to ensure that
the quantity and quality of stormwater leaving the site satisfies both the Council’s standards and
current best practice.



6.4 REFERRAL


The State Assessment and Referral Agency (SARA) became active on 1 July 2013. A review of the
SARA mapping confirms that the site is located in the Urban Footprint in the SEQ Regional Plan
and forms part of a water resources planning area and the coastal zone. With regard to these
overlays, as the proposal is consistent with the objectives for the Urban Footprint in the SEQ
Regional Plan, does not seek to take, or interfere with, water and the site does not form part of
the Coastal Management District, an assessment against Modules 2, 7 and 10 of the State
Development Assessment Provisions (SDAP) is not required.

Development Assessment Report - Material Change of Use                                   Page 13 of 25
(Multiple Housing Type 4, Commercial Type 1 Office/Type 2 Medical)
30-32 Doonella Street, Tewantin QLD 4565
Lot 32 on RP893427 & Lot 903 on T1631

Log in to download the original (16216_Final Planning Report_150217.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.