Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTfA Project Group Pty Ltd Stormwater Management Plan
Development Application
SITE BASED STORMWATER
MANAGEMENT PLAN
PROPOSED SERVICE STATION & RETAIL
123 Eumundi Road (Cnr Walter Hay Drive)
Noosaville QLD 4566
Client: Synergy Property Partners
Job Reference: 15193
TFA Project Group Brisbane
Head Office New South Wales Victoria
17 Dover Street, Albion Qld 4010 Suite 315, 33 Lexington Drive Suite 13, 150 Albert Road
PO Box 301, Albion Qld 4010 Bella Vista NSW 2153 South Melbourne Vic 3205
Reception :+61 7 3854 2900 Australia Wide: 1300 794 300 Website: www.tfa.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 60 (of 74)
Section 2
Section 3
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
SITE BASED STORMWATER
MANAGEMENT PLAN
PROPOSED SERVICE STATION & RETAIL
123 Eumundi Road (Cnr Walter Hay Drive)
Noosaville QLD 4566
Document Control
Version Author Date Comments
1 − Rev A Leonardo Salinas (Civil Engineer) 30.09.15 Issued for DA approval
© TfA Project Group
The information contained in this document is confidential
and intended solely for the use of the client for the purpose
for which it has been prepared and no representation or is to
be implied as being made to any third party. Use or copying
of this document in whole or part without the written
permission of TfA Project Group constitutes infringement of
copyright. The intellectual property contained in this
document remains the property of TfA Project Group
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 SBSMP
Section 4
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 SBSMP
Section 5
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
TABLE OF CONTENT
1 INTRODUCTION ............................................................................................................1
2 SITE DESCRIPTION ......................................................................................................1
3 SITE TOPOGRAPHY AND EXISTING DRAINAGE ..........................................................2
4 FLOODING ....................................................................................................................3
5 PROPOSED DRAINAGE LAYOUT .................................................................................3
6 WATER QUANTITY ASSESSMENT ...............................................................................4
6.1 CATCHMENT ANALYSIS ............................................................................................................................................................... 4
6.2 STORMWATER DETENTION SIZING ........................................................................................................................................... 4
6.2.1 Rational Method .................................................................................................................................... 4
6.2.2 Catchments ........................................................................................................................................... 5
6.2.3 Time of concentration ............................................................................................................................ 5
6.2.4 Coefficient of Discharge ........................................................................................................................ 5
6.2.5 Rainfall Intensities ................................................................................................................................. 6
6.2.6 Stormwater Design Flows ..................................................................................................................... 6
6.2.7 Required Detention Volume .................................................................................................................. 7
7 WATER QUALITY ASSESSMENT ..................................................................................8
7.1 CONSTRUCTION PHASE ............................................................................................................................................................... 8
7.1.1 Pollutants .............................................................................................................................................. 8
7.1.2 Performance objectives ......................................................................................................................... 9
7.1.3 Monitoring and Maintenance ................................................................................................................. 9
7.1.4 Responsibility and Reporting................................................................................................................. 9
7.2 OPERATIONAL PHASE ................................................................................................................................................................10
7.2.1 Pollutants ............................................................................................................................................ 10
7.2.2 Water Quality Objectives ..................................................................................................................... 10
7.2.3 Stormwater Treatment Philosophy ...................................................................................................... 10
7.2.4 Source Controls................................................................................................................................... 10
7.2.5 Gross Pollutant Traps.......................................................................................................................... 11
7.3 FUEL RELATED STORMWATER TREATMENT .........................................................................................................................11
7.3.1 Fuel Dispensing Areas ........................................................................................................................ 11
7.3.2 Underground Fuel Storage Tanks ....................................................................................................... 12
7.3.3 Areas outside Canopy ......................................................................................................................... 12
7.4 WATER QUALITY ASSESSMENT ...............................................................................................................................................12
8 SITE MAINTENANCE AND MANAGEMENT PROCEDURES ........................................ 12
8.1 MAINTENANCE PLANS FOR STORMWATER TREATMENT DEVICES .....................................................................................13
9 LIFECYCLE COSTS ..................................................................................................... 13
10 CONCLUSION ............................................................................................................. 13
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Table of Contents
Section 6
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDICES
Appendix A: Proposed Site Layout Plan
Appendix B: Site Survey Plan
Appendix C: Noosa Council Flood Information
Appendix D: Pre and Post-development Catchment Plan
Appendix E: Conceptual Stormwater Management Plan
Appendix F: Stormwater Treatment Systems
Appendix G: Stormwater Treatment Systems Maintenance Plans
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Table of Contents
Section 7
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
1 INTRODUCTION
This Site Based Stormwater Management Plan (SBSMP) has been prepared by TFA Project Group on behalf of
Synergy Property Partners for the development of a new service station; consisting of paypoint building, a canopy
over fuel dispensing area and associated driveways, vehicle parking and landscape areas. The purpose of this
document is to verify that stormwater quality has been considered as part of this development in accordance with
Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks. Noosa Council.
The SBSMP is part of the Development Approval process and addresses both the construction and operational
phases of the development. Table 1 below shows additional details of the proposed development. The proposed
site layout plan is shown in Appendix A.
Table 1: Details of proposed development
Developer Synergy Property Partners
Address 123 Eumundi Road (Cnr Walter Hay Drive) Noosaville QLD 4566
Property Description Lot 30 on SP170751
Area of Development 2448 m²
Stormwater Risk Classification High Risk (due to the storage and transfer on site of petroleum products
that have the potential to cause harm to the environment, if released).
Existing Land Use Vacant Land
2 SITE DESCRIPTION
The development site is bound by Eumundi Noosa Road to the North and West, a School (Lot 1 on SP 228052) to
the East, and by Eumundi Road and Walter Hay Drive to the West and South.
The site currently has a gravel hardstand cleared area at the centre of the lot. There are a few trees around the
North, West and South boundary areas which are maintained in the proposed development site layout plan. A
landscape plan will be prepared for the final form of the development site that will incorporate stormwater measures.
The proposed development takes up the majority of the Western side of Lot 30 on SP170751, as shown in the site
layout plan, leaving the remaining areas undeveloped. An easement at the North of the site will be created to
maintain the existing property access from Eumundi Noosa Road to the developed portion of the lot. This area is
not part of the proposed development site.
The Lot 30 on SP170751 is part of a reconfiguration application for two lots. With a total area of 5019 m2 it is
understood that the lot will be divided in lots of 2448 m2 (Lot 1) and 2571 m2 (Lot 2) with an easement access in
lot 2 in favour of lot 1. The proposed development will be located in Lot 1 with the residual lot (Lot 2) being a vacant
lot.
A geotechnical investigation will be completed to determine soil type and any specific treatment or management
requirements to mitigate erosion or pollution of the environment. This will be developed at the Operational Works
stage of the development. A location of the site is shown on Figure 1.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 1
Section 8
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Figure 1: Location of the proposed development site
Site
3 SITE TOPOGRAPHY AND EXISTING DRAINAGE
Refer to Appendix B for the survey plans provided by John Dawson Surveys Pty Ltd dated 10th September 2015,
which shows the existing condition of the site. The development site has existing surface levels approximately
between RL 9.33 and 12.20 m AHD. The development site has only one catchment of varying slope. The site
generally falls from the North-East to the South-West. The legal point of discharge are gully pits located on
Eumundi Noosa Road and Walter Hay Drive.
Currently the majority of the site does not discharge to a lawful point of discharge, most of the stormwater runoff
flows unmitigated to Eumundi Noosa Road and Walter Hay Drive. Refer to Appendix D for the pre-development
catchment plan scenario. The existing catchment boundary has been maintained in the post development
scenario but the stormwater runoff conveyed, mitigated and discharged to the legal point of discharge. Refer to
Appendix E for a Conceptual Stormwater Management Plan for the proposed development.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 2
Section 9
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
4 FLOODING
A Storm tide Information Map (Map 10-D34) obtained from the Noosa Council website states that the site is outside
the known floodplain extent. Refer to Appendix C for the Noosa Council’s Stormtide Information Map 10-D34 –
September 2012. A close up of the Map showing the development site highlighted is shown in Figure 2 below.
Figure 2: Close up of the Stormtide Information Map 10-D34 showing the development site (in red)
5 PROPOSED DRAINAGE LAYOUT
The post development stormwater drainage design generally maintains the overall catchment boundary, the design
separates the high risk (hydrocarbon generating e.g. under the canopy) area from the low risk areas (the rest of
the site). Any spillage or minor spills from under the canopy will be captured by grated gully pits and directed to a
Spel® Puraceptor for hydrocarbon removal, which then discharges to the stormwater network. The fuel delivery fill
point (unloading area) will be located under the canopy and any spills that might occur during unloading will be
directed to the Spel® Puraceptor. A licensed contractor will remove the contents of the Puraceptor when required.
Stormwater runoff generated from low risk areas (the rest of the site) will be captured and conveyed by gully pits
and underground pipes, which then discharge to the legal point of discharge on Eumundi Noosa Road. All the
stormwater runoff generated from low risk areas on the site will be treated using Spel® Stormsacks. Refer to
Appendix E for a concept plan of the stormwater drainage and site grading.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 3
Section 10
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Overland run-off from the undeveloped upstream catchment area will be conveyed via spoon drains and gully pits
installed along the top of a proposed retaining wall located on the Eastern boundary of the proposed development
discharging to the legal point of discharge on Eumundi Noosa Road. Details of the spoon drain and pit locations,
as well as hydraulic calculations, will take place in the detail design stage of the development.
6 WATER QUANTITY ASSESSMENT
The purpose of this part of the assessment is to investigate whether there is a need to attenuate stormwater flows
to negate any adverse impacts on upstream or downstream environments. Stormwater runoff from both pre and
post-development scenarios will be calculated and the results analysed and possible solutions proposed.
6.1 Catchment Analysis
The total proposed development area is 2,448m² (0.248 Ha). Details of the pre-development catchment are
shown in Table 2 below, which shows the surface types, areas, percentage imperviousness and fraction
impervious.
Table 2: Pre-development catchment characteristics
Surface Type Area (m²) Percentage Imperviousness Fraction impervious
Roof and Paved 0 100
Area 0.00
Landscaped Area 2,448 0
Details of the post-development catchment are shown in Table 3 below, which shows the surface types, areas,
percentage imperviousness and fraction impervious.
Table 3:Post-development catchment characteristics
Surface Type Area (m²) Percentage Imperviousness Fraction impervious
Roof and Paved 1,673 100
Area 0.68
Landscaped Area 775 0
Tables 2 and 3 above show that the fraction impervious for the post-development case is higher than the fraction
impervious of the pre-development case, this will result in increased peak flows in the post-development case
therefore onsite stormwater detention is required.
6.2 Stormwater Detention Sizing
6.2.1 Rational Method
The rational method was used to calculate the stormwater runoff flows from the site for the pre and post-
development scenarios. The formula is as follows:
Qy = (2.78 * 10-3)) Cy*A* tIy (QUDM 2007 Equation 4.02)
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 4
Section 11
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Where:
Qy = peak flow rate (m3/s) for average recurrence interval (ARI) of ‘y’ years
Cy = coefficient of discharge (dimensionless) for ARI of ‘y’ years
A = area of catchment (ha)
tIy = average rainfall intensity (mm/h) for a design duration of ‘t’ hours and an ARI of ‘y’ years.
t = the nominal design storm duration as defined by the time of concentration (tc).
The value of 2.78 x 10-3 (or 1/360) is a conversion factor to suit the units used.
6.2.2 Catchments
The existing catchment boundary has been maintained in the post development scenario. Pre and post-
development catchment information is tabulated in Table 4 below.
Table 4: Catchment details
Pre-development Pre-development Post-development Post-development
Area (Ha) fraction impervious Area (Ha) fraction impervious
0.24 0.0 0.24 0.68
6.2.3 Time of concentration
The time of concentration of the pre-development scenario was calculated using the Friend’s equation for
overland sheet flow and figure 4.09 and 4.10 of the Queensland Urban Drainage Manual (QUDM 2007). The
equation is shown below:
tc = (107.n .L0.333) / S0.2 (QUDM 2007: Equation 4.06)
Where:
tc = overland sheet flow travel time (min)
L = overland sheet flow path length (m)
S = slope of surface (%)
The value ‘107’ is a conversion factor to suit the units used.
The time of concentration for post-development scenarios was determined using the above equation 4.06 with a
minimum of 6 minutes as instructed in the Planning Scheme Policy 5 - Noosa Council. Table 5 below shows the
times of concentration used in the water quantity assessment.
Table 5: Times of concentration for the catchment
Catchment Time of concentration
Pre-development 10.00
Post-development 6.00
6.2.4 Coefficient of Discharge
From Table 4.05.3(a) and 4.05(b)of QUDM, a one hour rainfall intensity for a 1 in 10 year ARI (1I10) of 72.3 mm/hr
and fraction impervious fi of 0.0 has a C10 value for the pre-development catchment of 0.70. The post-
development C10 value is 0.84. Table 6 below shows the Fy factor used to calculate the Cy value for each ARI.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 5
Section 12
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Table 6: Fy factors for the nominated ARI’s
1 year ARI 2 year ARI 5 year ARI 10 year ARI 20 year ARI 50 year ARI 100 year ARI
(mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
Fy 0.80 0.85 0.95 1.00 1.05 1.15 1.20
The coefficient of discharge for both pre and post-development catchments is calculated based on equation 4.05
of QUDM and the results shown in Table 7.
Table 7: Coefficients of discharge for pre and post-development scenarios
Coefficient of Discharge 1 year 2 year 5 year 10 year 20 year 50 year 100 year
ARI ARI ARI ARI ARI ARI ARI
Pre-development Catchment 0.56 0.60 0.67 0.70 0.74 0.81 0.84
Post-development Catchment 0.67 0.71 0.80 0.84 0.88 0.97 1.01
6.2.5 Rainfall Intensities
The rainfall intensities for the site were read from an IFD table obtained from the BOM website for the project site
on 25 September 2015. The rainfall intensities for a given time of concentration for the pre and post-development
cases for the nominated ARI’s are shown in Tables 8 and 9.
Table 8: Rainfall intensities for the nominated ARI’s for the pre-development scenario
tc 1 year ARI 2 year ARI 5 year ARI 10 year ARI 20 year ARI 50 year ARI 100 year ARI
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
10 99.3 126 156 173 196 227 250
Table 9: Rainfall intensities for the nominated ARI’s for the post-development scenario
tc 1 year ARI 2 year ARI 5 year ARI 10 year ARI 20 year ARI 50 year ARI 100 year ARI
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
6.0 121 154 189 210 238 275 302
6.2.6 Stormwater Design Flows
Table 10 shows the stormwater runoff flows for the pre-development case calculated using the rational method.
Table 10: Stormwater flows generated by the pre-development catchment
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (QoutPC) 37.78 50.94 70.48 82.28 97.88 124.16 142.68
Table 11 shows the stormwater runoff flows for the post-development case calculated using the rational method.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 6
Section 13
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Table 11: Stormwater flows generated by the post-development catchment
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (Qin) 55.25 74.71 102.47 119.85 142.62 180.49 260.83
As can be seen from Table 12 below, the development will increase stormwater runoff for the catchment for the
nominated ARI’s, therefore onsite stormwater detention will be required to mitigate the peak discharge and achieve
the “no worsening” of the stormwater drainage conditions external to the site.
Table 12: Stormwater flow differences between post and pre-development for standard ARI’s
Change in Flow Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A 17.46 23.77 31.99 37.57 44.74 56.34 64.15
Stormwater runoff from the back of the proposed building at the Southern area (390 m2) of the site will flow
unmitigated by passing detention. A gully pit will convey the runoff and will discharge the flow to the legal point of
discharge on Walter Hay Drive. Table 13 shows the stormwater flow generated by the bypassing area.
Table 13: Stormwater runoff bypassing the detention basin for the post-development catchment
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (QoutL) 8.82 11.92 16.35 19.13 22.76 28.80 33.00
The adjusted allowable discharge from the detention basin is shown in Table 14 below.
Qout = QoutPC – QoutL
Table 14: Allowable stormwater discharge from the detention basin
Catchment Q1 (l/s) Q2 (l/s) Q5 (l/s) Q10 (l/s) Q20 (l/s) Q50 (l/s) Q100 (l/s)
A (QoutPC) 37.78 50.94 70.48 82.28 97.88 124.16 142.68
A (QoutL) 8.82 11.92 16.35 19.13 22.76 28.80 33.00
A (Qout) 28.97 39.02 54.13 63.15 75.12 95.35 109.68
6.2.7 Required Detention Volume
The onsite detention volume will restrict the post-development flows to pre–development levels. The required
detention volumes were estimated using the equation 5.04 (After Basha 1994), outlined in Section 5.05.1 of
QUDM (2007). Table 15 shows post-development flow rates, allowable discharges from the detention basin(s),
and the detention storage volume required to achieve the “no-worsening” of the drainage conditions external to
the development site for the nominated ARI’s.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 7
Section 14
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Table 15: Required detention volume for the catchment
Design Storm Post Development Allowable stormwater discharge Required Detention volume
from the Detention Basin(s)*
ARI Flow rate Flow rate Volume
Years L/S L/S L
1 55,25 28.97 10,410
2 74,71 39.02 14,150
5 102.47 54.13 19,118
10 119.85 63.15 22,435
20 142.62 75.12 26,713
50 108.49 95.35 33,669
100 206.83 109.68 38,391
*The figures are based on the stormwater runoff from the pre-development catchment less the stormwater runoff
from the non-developed area at the back of the proposed building on the Southern corner of the post-development
catchment.
Therefore, a 38,400L detention storage volume is required to mitigate peak flows from the catchment. The outlet
arrangement of the detention basin shall be designed at the Operational Works phase of the project and it will
ensure that the design flow rates do not exceed pre-development flow rates for the nominated design storm events.
Appropriate design software shall be used at the operational works stage to determine the actual design volume
of the onsite detention basin required and a suitable outlet arrangement (e.g. orifice plate, culvert, etc.).
7 WATER QUALITY ASSESSMENT
7.1 Construction Phase
Impacts on receiving waters and surrounding areas will be minimised during the construction phase with
measures as outlined in this SBSMP and an Erosion and Sediment Control Plan to be developed at the
Operational Works stage.
7.1.1 Pollutants
Typical pollutants generated during the construction phase of the development are shown below in Table 16.
Table 16: Pollutant typically generated during the construction phase
Pollutant Sources
Litter Paper, construction packaging, food packaging, cement bags, off-cuts
Sediment Unprotected exposed soils and stockpiles during earthworks and building
Hydrocarbons Fuel and oil spills, leaks from construction equipment
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash-waters
pH altering substances Acid sulphate soils, cement slurry and wash-waters
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 8
Section 15
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.1.2 Performance objectives
The objectives are:
• Minimise the amount of sediment entering Noosavilley’s waterways and stormwater drains;
• Minimise or prevent environmental harm to the City’s waterways and associated ecosystems;
• Minimise localised flooding caused by sediment runoff;
• Minimise exposure of soils.
Table 17: Construction phase performance criteria
Indicator Water Quality Objectives
pH 6.5 – 8.5
Suspended Solids Annual Mean < 10mg/L
Oils and Grease No visible films or odour
Litter/ Gross pollutants No anthropogenic (man-made) materials greater than
5mm in any dimension
Dissolved oxygen 80-100% saturation
7.1.3 Monitoring and Maintenance
The general requirement of monitoring during the construction phase will be:
• Work activities are restricted to designated construction areas;
• Earthworks and site clearing are undertaken in accordance with an Erosion and Sediment Control Plan;
• Erosion and sediment control devices are to be constructed/installed in accordance with an Erosion and
Sediment Control Plan;
• Inspection of sediment fences, erosion and sediment control structures/devices on a weekly basis as well
as after any rain event exceeding 25mm in 24hrs (major storm event);
• Stormwater discharges from the site are not having any adverse effect on the downstream environment;
• Monitoring and recording of the performance of the drainage control devices including water quality
testing where required;
• Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
from the site;
• Any failure to the stormwater system causing damage to surroundings should implement immediate
remedial work to the damaged area.
7.1.4 Responsibility and Reporting
• The contractor shall be responsible for monitoring the performance of all drainage control and erosion and
sediment control devices;
• Records of any failures to devices should be kept and reported to the Construction Manager;
• Regular inspections of the devices shall be reported to the Construction Manager;
• Inspections of the devices after heavy rainfall shall be reported to the Construction Manager;
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 9
Section 16
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.2 Operational Phase
7.2.1 Pollutants
The key pollutants typically generated during this phase for the entire catchment are shown in Table 18.
Table 18: Pollutant typically generated during the operational phase
Pollutant Potential Source
Litter / Gross Pollutants Waste materials, food, food packaging etc.
Hydrocarbons Fuel and oil spills, dispensing areas, car park
Nutrients (N & P) Nitrogen, Phosphorus
Sediments Aggregates bins, wind deposits and car trails
Surfactants Detergents, cleaning agents
The development site has two catchments area based on the architectural, landscape, topography and the
proposed stormwater measures adopted. Appendix D shows the catchment area boundary and Table 19 below
shows a breakdown of the key pollutants generated by the catchment.
Table 19: Catchment characteristics
Catchment Pollutants Generated
A:
Paypoint building roof TSS, Gross Pollutants
Light vehicle fuel dispensing area and roof Nutrients
Driveways & Landscape Hydrocarbons (Light)
Vehicle car parking Hydrocarbons (Heavy)
B:
Landscape area None
7.2.2 Water Quality Objectives
The total area of the site being developed is less than 2,500m² therefore the development is not required to
achieve the TN, TP and TSS pollutant reductions outlined in the Queensland State Planning Policy (SPP) July
2014.
7.2.3 Stormwater Treatment Philosophy
Waterways and other aquatic environments are valued by the community for their social, cultural, economic and
environmental benefits. Urban runoff, contaminated with nutrients, sediment and other pollutants adversely
impacts theses valued resources. Water Sensitive Urban Design (WSUD) is a holistic approach to the planning
and design of urban landscapes that minimises theses negative impacts. This approach is used on this project to
select the treatment options that considers the civil, landscape and ecological aspects of the site.
7.2.4 Source Controls
Rubbish bins can be an effective source control for litter and are appropriate for most developments. Bins will be
placed in appropriate areas (such as buildings and staff amenity) to encourage thoughtful waste disposal.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 10
Section 17
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.2.5 Gross Pollutant Traps
A GPT is a treatment device designed to capture coarse sediment, trash and vegetation matter in stormwater
runoff. GPTs are often used as the first treatment element in a treatment train. Spel® Stormsacks or a similar
approved product will be used within this development; the Stormsacks will be installed in gully pits, refer to
Appendix F for typical details.
7.3 Fuel Related Stormwater Treatment
The treatment train shown in Figure 3 uses the Best Management guidelines to treat stormwater runoff from the
site.
Figure 3: Fuel related stormwater treatment philosophy
Runoff Source Runoff from under canopy fuel
Roof, Paved &, dispensing area and Tanker
Grassed areas refuelling area
Provision of rubbish
Signage/Education
bins
Signage/Education
SPEL Puraceptor with
10,000 litres
Primary treatment containment capacity
Discharge to
stormwater
Waste Removal by
infrastructure
licensed contractor
Key features of the fuel related stormwater treatment process are detailed below.
7.3.1 Fuel Dispensing Areas
The fuel dispensing area will be concrete surfaced and covered by a canopy. The fuel dispensing area will be
bunded to prevent stormwater runoff from outside the canopy flowing into the dispensing area and to ensure that
any spills are contained within this area. The perimeter of the canopy will overhang the dispensing containment
area by 10 degrees to reduce the amount of windblown rain into the dispensing area. Any flows/spills in the
containment area will drain to gully pits which will discharge to an appropriately sized Spel® Puraceptor.
Bulk fuel transfers from a road tanker to underground tanks will take place under the canopy; any runoff from the
dispensing area will be directed to a Spel® Puraceptor. A spill containment box at fill points will capture any minor
fuel spills that may occur during unloading; the spilt fuel will then drain from the containment box into the fuel
storage tanks.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 11
Section 18
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.3.1.1 Spel® Puraceptor
The Puraceptor will have a minimum containment volume of 10,000litres, which allows for containment for spill
from an 8,000 litre tanker compartment plus allowances for wind-blown rain. The Puraceptor will remove
hydrocarbons, gross pollutants and total suspended solids. Refer to Appendix F for details of the Spel® Puraceptor.
7.3.2 Underground Fuel Storage Tanks
Underground fuel storage tanks, piping and fuel dispensers will be installed in accordance with the Australian
Institute of Petroleum (AIP) standards.
7.3.3 Areas outside Canopy
All driveways and car parking areas will be concrete surfaced and will drain via gully inlet pits, which will have
Spel® Stormsacks inserts to capture gross pollutants before discharging to the legal point of discharge. Refer to
Appendix F for typical details of the Stormsacks system.
7.4 Water Quality Assessment
No water quality assessment is required as the total site area is less than 2,500m².
8 SITE MAINTENANCE AND MANAGEMENT PROCEDURES
The service station operator will have a Petrol Handling Manual that will set out all requirements for the safe
handling of combustible and flammable materials. This manual will dictate weekly, monthly and annual checking
procedures with checklists, which will be completed, and the records stored.
The manual will also set out dry cleaning methods to be employed within the fuel dispensing area in lieu of washing
down to reduce possible contaminated runoff. Emergency procedures will be also clearly set out detailing actions
to be taken by site personnel in the case of varying possible emergencies such as spills, fire or risk of fire, vehicle
accidents, etc.
In addition a regular cleaning, maintenance program/contract is to be established for emptying of rubbish bins
located around the site, removal of general litter from the site, inspection of stormwater gully pits and removal of
any sediment or captured litter from the Spel® Stormsacks systems. The Spel® Stormsacks will be inspected and
maintained in accordance with the manufacturer’s instructions. Refer to Appendix G for maintenance plans.
The maintenance plan will address the following:
• Inspection frequency;
• Maintenance frequency;
• Data collection/storage requirements;
• Detailed cleanout procedures.
The plan will include inspection procedures covering aspects such as equipment needs, maintenance techniques,
occupational health and safety, public safety, environmental management considerations, disposal requirements
of pollutants collected and access issues.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 12
Section 19
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
8.1 Maintenance Plans for Stormwater treatment devices
All stormwater quality improvement systems require regular maintenance in order to function adequately. Table 18
details the basic maintenance requirements for each type of stormwater quality improvements systems. A detailed
maintenance schedule will be developed as part of the detailed design of the site.
Table 20: Maintenance Requirements
Control Maintenance Requirement Maintenance Period
Spel® Remove sediment and captured litter 4 months (inspect after
Stormsacks
major storms)
Spel® Puraceptor Replacement of oil separators and coalescer units, removal of 6 Months (inspect after
oil, sediment & gross pollutants (skimmers and vacuum truck) major spill)
Onsite Detention Removal of accumulated sediment, debris 6 Months (inspect after
Basin major storms)
For operational and maintenance guidelines refer to Appendix G and relevant manufacturer’s documentation.
9 LIFECYCLE COSTS
A lifecycle cost analysis is not part of the scope of this report. All the recommended water quality treatment
infrastructure lies within the development site and it shall be maintained and serviced by the owners of the
development at no cost to Council.
10 CONCLUSION
A Site Based Stormwater Management Plan has been prepared with respect to the proposed service station and
retail. The location of the site is shown on Figure 1 and the proposed development site layout is shown in
Appendix A.
• Stormwater Quantity
An assessment of the water quantity has resulted in an onsite detention basin size of 38,400L with
controlled outlet to mitigate the peak discharge and achieve “no worsening” of stormwater conditions
external to the site. The detention storage volume is based on preliminary calculations; the actual
detention storage volume required and outlet arrangement will be determined by appropriate software
as outline in section 5.05.2 of QUDM (2007).
• Stormwater Quality- Construction Phase
An Erosion and Sediment Control Plan aimed at minimising unacceptable impacts during the
construction phase will be developed at the Operational Works stage, in accordance with Noosa Council
Guidelines and Standards.
• Stormwater Quality- Operational Phase
It is proposed to treat runoff from the surface of the site by using Spel® Stormsacks or similar approved
devices. The location of proposed treatment measures is shown in Appendix E.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 13
Section 20
NF TfA Project Group Pty Ltd Stormwater Management Plan Development Application This Site Based Stormwater Management Plan has demonstrated that adequate stormwater quality management principles and techniques will be employed during the construction and operational phases of this development to comply with the Queensland State Planning Policy July 2014 and Noosa Council's requirements. The methods proposed are considered current best management practice for a development of this type, on this site. Yours faithfully Leo Salinas BEng, MIEAust Civil Engineer For and on behalf of TfA Project Group Reviewed By Juan Avella (RPEQ 11899) BEng, MlEAust, CPEng, RPEQ, NPER Senior Civil/Structural Engineer For and on behalf of TfA Project Group 123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 14
Section 21
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix A
Section 22
22/09/2015 8:03:15 AM
PARKING SCHEDULE LEASE SCHEDULE
DISABLED (5.4m x 2.4m) 1 PETROL SITE 2444m² N
-with 5.4m x 2.4m shared bay between VACANT LAND 2574m²
STANDARD (5.4m x 2.6m) 9 (ACCESS EASEMENT 467m²) 4 0 5 10 15 20m
MOTORCYCLE (3.0m x 1.5m) 2
TOTAL 5018m²
Metres
PETROL SITE COVERAGE
LANDSCAPING 739m² 30.2% D04 RPD
BUILDING 254m² 10.4%
CANOPY 319m² 13.1% LOT 30 on SP 170751
7000
PAVEMENT 1132m² 46.3% 1 LAND TOTAL SITE AREA: 5018m²
SCAP
TOTAL LEASE AREA 2444m² 100% ING
WALTE
10000
ENT
BUILDING AREAS EASEM
R HAY
SERVICE STATION 194.7m²
REFUSE & SERVICES YARD 56.2m²
TOTAL 253.6m²
ING
DRIVE
LOAD
10
FUEL STORAGE D04
2
UNLEADED 91 60,000L 6
UNLEADED 95 30,000L VACANT LAND 5
7500
UNLEADED 98 30,000L
DIESEL 60,000L 3750
TOTAL FUEL STORAGE 180,000L 3500 1
REMOTE FUEL M1 M2
FILL POINTS 9200
AIR & WATER
7200
** FUEL TYPES ARE INDICATIVE ONLY & UNDERGROUND STORMWATER 3500
1000
MAY BE SUBJECT TO CHANGE DURING DETENTION TANK WITH 4
DETAIL DESIGN STAGE. TOTAL FUEL FILTRATION SYSTEM TO COMPLY D04
STORAGE WILL NOT EXCEED 500,000L WITH DIVISION 20 WATER
SENSITIVE DESIGN CODE
(INDICATIVE ONLY)
THE SITE WILL BE PROVISIONED WITH
S
ALL NECESSARY UNDERGROUND PIPE
TANK
30
WORK FOR VR2 00
AGE
10
13
STOR
5
GENERAL NOTES
UEL
ACCESS
U/G F
EASEMENT FUEL VENTS
CARPARKING AND ROAD AISLES TO BE IN
ACCORDANCE WITH AS2890.1 & AS2890.6.
CARPARKING AREAS TO BE MIN. 5.4m(L) x 2.6m(W)
A 16.09.15 BHL D.A. APPROVAL
FOR STANDARD PARKS & MIN. 5.4m(L) x 2.4m(W) revision date by description checked
8400
FOR DISABLED PARKS.
DIRECTIONAL SIGN LANDSCAPING Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
ENTRY EXIT PLANNERS |
ENGINEERS |
PED. REFUGE DIRECTIONAL PRIME SIGN Head office - 17 Dover Street
PP Albion QLD 4010 Australia
SIGN Email: [email protected]
PP Ph. 61 7 3854 2900
COLOURS & SELECTED BUILDING Fax. 61 7 3854 2999
MATERIALS SHOWN ARE INDICATIVE & MAY 3 Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
BE SUBJECT TO VARIATIONS DURING C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
FINAL DETAIL DOCUMENTATION This document may not be copied, reproduced, retained or disclosed to any unauthorised
EUMUNDI NOOSA ROAD D04
project
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
PROPOSED SERVICE STATION for SYNERGY
ALL SIGNAGE SHOWN FOR INDICATIVE
PURPOSES ONLY AND SUBJECT TO THE PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
APPROVAL OF A SEPARATE OPERATIONAL WALTER HAY DRIVE) NOOSAVILLE, QLD
WORKS PERMIT (WHERE REQUIRED)
title
PROPOSED SITE LAYOUT
drawn approved date created scale
BHL ROB SEP 2015 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D02 A
Section 23
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix B
Section 24
@) DO0ONCO
Oocd@odmaxa
Contour Interval ...
Datum for Levels .
1
RP196624
SPORTS
CENTRE
1
\ ty ‘$P228052
<4 ys
“AN, J “ /
(%
oy J
o
J PUMP.
J HOUSE
4A
1
‘SP228052
ORIGINAL ISSUE 17-9-15
ISSUE TeScRIPTiON TATE SIGNED
DESCRIPTION: DATE 99-15 | REF! 3949
LOT 30 on SP170751 SCALE:
123 EUMUNDI NOOSA RD, oo OM
NOOSAVILLE .
PARISH: . COUNTY: LOC.AUTH
Tewantin March NOOSA SC
15 KARALISE DRIVE, ROCHEDALE. 4123
JOHN DAWSON Telephone: (07) 3841 2674
Mobile: 0411 656 274
Surveys Pty Ltd EMAIL: [email protected]
Section 25
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix C
Section 26
A{ge!ERE JOU S| UONEWOJUI Pooy Seose oWOs 40} pu AYedold oy!oedS e Jo a[B9S at 0} ayeINDDe JOU s} seen
dew ayy 7SIG0}o1pAy jeuoissajoud e Jo JuawWa6pnl seq oy) Bulsn poyewNse 40 “eIep poy DUOIsIy Woy peAliop ———— el
‘pased |apow soipie si dew sity uo paquesaid uoneUO}UI oy “Sse901
u posinba
aug aoe
‘syowoid 0} Ail
jwuad 40 jeaoidde juswidojanap kue Gg sz
Sp1o9ei younog Jo Auinbue oyioads ays 40} pou
U. ‘Seale auald pooy fenuaiod jo ssauaiEMe
1 0} @suodsal u! peonpoud useq sey dew siuL
FeUTePSsIG
Sz
L
gn) 11va.Loo4d
NVITVaLSNV VSOON
>
=
So
[>|
ro
1)
2
=
)
au
Qa
®
yn
+
o
a
(=)
Ss
ou
<
=
Zz
o
=
a
a
oc
fe)
LL
=
He
=
=
=
oc
e)
ae
n
v
4
WaVd
STVAO
NYSHLAT
eyeq
e]jau00q
—
"S|9A9| Opty Bury 0} Je|IWIS ase S|aA9]
API [Ed|WOUCMSY ISPUBIH -LWH +
speoy soley
“IWH @Aoge seljJOlU €-Z JO
@pHuUUo}s & sjolpeid (W\WIOg)
ABojosoayay Jo Nesing
ey} UaYM BUuOZ BBueJO OU}
JOYE POoy [IM Bose SIUL
“IWH eA0ge seu} Z-| JO
SpyWoys e sjoiped (WO)
ABojosoayay Jo Neaing
9U} UBYM 9UOZ Pdi OU}
Jaye Pooy |IM Bose SIU]
» LVH eAoge 2ad}aW | Jo
@pWoys e sjoipeid (WO)
ABojosoajay Jo Nesing 9y}
UBYM POO} |[IM ease SIU, a
“@dIApe uoenoeAe pue seyepdn
JO} SOLS JeyIM) pue yooqeoeR}
‘@\ISGM SJIOUNOD ‘olpes |ed0] 0}
paun} Aejs ‘WueAe ue Buling (yp)
‘pasojo ale speol aseo
ul pooyusnoquBieu unoA ul punos6
ybly pue sajno1 uojenoerd
jeusjod = Ayquep! pue ‘Ajtwe}
JNoA pue nok Jo} uejd Aouabiowa
ue dojansp pue ssnosiq (¢)
‘Bulpooy
SPIWUO}S WO YSU ye oq ABW
nok ‘sauoz painojoo ay} Jo auo
ul ale sadejd asauj jo Aue 4] (Z)
‘Jooyos 0} 06 uaupyyo JNOA aay
pue ‘yom ‘awoy se yons noA
0} ueyodu! suo}jed0) Ayuep| (|)
TIONNOO L.@. |
WSOON [®§
Section 27
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix D
Section 28
LOT 30 ON SP17075
| 519m?”
4 0 5 10 15 20m
FP Lee OL
Metres Nv
LEGEND
> FLOW ARROW
EEC —_ PRE-DEVELOPMENT CATCHMENT BOUNDARY
CATCHMENT A
AREA - 5019m?
praech
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, OLD
Tile
PRE-DEVELOPMENT CATCHMENT PLAN
Gate created | scale
~ GM ere © [ovtorts 1: 400
raving no.
"DA. ISSUE 15193 08 A
Section 29
6/10/2015 2:33:30 PM
4 0 5 10 15 20m
Metres N
WALTE
LEGEND
FLOW ARROW
R HAY
POST DEVELOPMENT CATCHMENT BOUNDARY
DRIVE
CATCHMENT A
AREA - 2058m 2
CATCHMENT B
CATCHMENT B
AREA - 390m 2
BYPASSING RETENTION
CATCHMENT A
ACCESS EASEMENT
A 01.10.15 GM D.A. APPROVAL JA
revision date by description checked
Figured dimensions to be taken in preference to scale readings
PROJECT MANAGERS
|
DESIGNERS |
PLANNERS |
EUMUNDI NOOSA ROAD ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
POST-DEVELOPMENT CATCHMENT PLAN
drawn approved date created scale
GM JA 01/10/15 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D09 A
Section 30
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix E
Section 31
4 0 5 10 15 20m
6/10/2015 2:37:35 PM
Metres
N
LEGEND
DP DOWNPIPE
GP1 GULLY PIT FITTED WITH SPEL STORMSACKS
GP2 FIELD INLET GULLY PIT
GP3 OILY WATER GULLY PIT
LEGAL POINT
214°14 0 TD TRENCH DRAIN
OF DISCHARGE
0
'30" 9.3
°2 8'
67.39 247
DP
45
04 00 2 3.4
10
.8
0 8
9.3 PROPERTY BOUNDARY
9.6 74
0 9.2 8
9.0
DEVELOPMENT AREA
WALTE
GP
GP2
0
9.3
5 ROOFWATER DRAIN
03'
12.03
R HAY D
306°
DP 0 0
20 1
65 9.2 9.39 STORMWATER DRAIN
20 .8 9.4 9.0
FFL.9.700
10
9.6
80
0 8.7
00
OILY WATER DRAIN
RIVE
6
0 8.7
8
0
0
9.4
5 GP2 9.1 0
8.8
8
RETAINING WALL
8
9.6
9.600
9.400
57
9.2
07 DP
0
9.5
0 GENERAL DIRECTION OF FINISHED SURFACE FALLS
"
312°09'25
.9
10
6.945
0 8
9.6
8.430 PROPOSED SPOT HEIGHT
0 5
0 3 9.5
9.5
0 0 0 7
5 9.0 9.1
8
9.4
0 9.4
5
00
8.980 EXISTING SPOT HEIGHT
25 .9 9.2
11 0 5
VALL
9.2
FFL 8.650 FINISHED FLOOR LEVEL
321°59'25"
EY LI
0 0
6.945
9.4
NE
0 5 0
9.8 9.1
7
9.400
0 9
8.9
VACANT LAND
9.600
0 5 9.000
GP3 8.9 0 5
0 9 9.600 9.2
9.4
9.600
10.000
331°50'
9.200
9.800
6.945
9.200
98
DP GP1
.0 1 0 3
11 GP 0 1 GP 9.3
9.3 0 7
.15
0 9.2
10 50 0
GP 3
GP3 DP 9.3
.1 0 1
10 9.2
10
GP3 DP
GP 9.2
8
TD
8
TD GP3
GP 9.3
05
7'
00 0 3
5°2
7.7
9 .4 9.3
140°21'05"
34
50.292
70
0 9.2 2
0 9.2 0 4
28 2 9.4
.0 9.2
SPEL PURACEPTOR
12 94 20 01
.5
GP1 9.6
11 .2 1
11 GP 0
20 3
.9 74 9.3
0
7.
11 70
.060
00 9.7
70 '
.5
2°
9.96
11 .8
5
50
10
00
40 0 0
9. 8
.8 5 5
11
(ACCESS EASEMENT)
9.4 9.7
DETENTION TANK
00
0
.0
. 00
11
CAPACITY 38,400L
10
0
.80
0
.2 0
10
00
0
11
.60
.2
8.
10
10
15 63
°1
0 8'
10 .40 0 0
.3 10 9.9
11
11
.6
5
GP1
1
.26
00
10 GP 22
8.6
3
°51
'
A 01.10.15 GM D.A. APPROVAL JA
revision date by description checked
11
LEGAL POINT
.40
30
0
4
.2 Figured dimensions to be taken in preference to scale readings
OF DISCHARGE
11 97 8.69.
3
30°2
PROJECT Section 32
MANAGERS
4'2
7 5"
.08
|
8 10 8.662
.91 84 10 DESIGNERS |
40 11
11
.3 ENTRY EXIT 00
11
.2 15 .9 10
.4 10
.4 37°5
7'25
"
PLANNERS |
50.648 10
50°21'05"
ENGINEERS |
Head office - 17 Dover Street
Albion QLD 4010 Australia
Email: [email protected]
Ph. 61 7 3854 2900
Fax. 61 7 3854 2999
12
11
.2
Copyright Tam Faragher & Associates Pty Ltd. This drawing including design & information
C is covered by Copyright and all rights are reserved by Tam Faragher & Associates.
3
10.8
5
0
10.3
10.5
1
11.2
This document may not be copied, reproduced, retained or disclosed to any unauthorised
person, either wholly or in part, without prior consent in writing from Tam Faragher &
Associates.
ACN 054 486 743
project
EUMUNDI NOOSA ROAD
PROPOSED SERVICE STATION for SYNERGY
PROPERTY PARTNERS. 123 EUMUNDI ROAD (Cnr
WALTER HAY DRIVE) NOOSAVILLE, QLD
title
SITE GRADING & STORMWATER DRAINAGE
drawn approved date created scale
GM JA 01/10/15 1 : 400
status drawing no. rev.
D.A. ISSUE 15193 D10 A
Section 33
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix F
Section 34
6 5 4 3 2 1
REVISION HISTORY
APPROVED................. ISSUE FOR APPROVAL REV DESCRIPTION DESIGNER DATE APPROVED
NOT FOR CONSTRUCTION 1 N.G 29/09/2014
NAME................................
SIGNED.............................
D DATE........../........../.......... D
600 900
600
C C
NOTE: MAX 300mm INLET NOTE: MAX 300mm OUTLET
1000 2940 1450 1150
575
640
1850 ID
2250
1675
1610
B B
6540
NOTE: TOTAL MASS = 1240KG
TOLERANCE: ALL DIMENSIONS 10mm UNLESS OTHERWISE STATED.
CLIENT: The drawings must not be disclosed to any third DRAWN BY: DATE:
parties without written permission from SPEL Environmental Sydney. TITLE:
Unauthorised disclosure may result in prosecution.
N.G 3/10/2014 SPEL PURACEPTOR
SPEL Environmental - This drawing is the property of SPEL
Environmental ABN: 83 151 832 629 and is subject to return on
CHECKED BY: DATE: P.040.C1.2C.A
A demand. It is submitted for the use only in connection with the STD PURACEPTOR A
proposal and contracts of SPEL Environmental with the expressed
VERIFIED BY: DATE:
conditions that it is not to be reproduced or copied in any form. GENERAL ARRANGEMENT
This data must only be used in accordance with our standard
terms and conditions.
Copyright APPROVED BY: DATE: PROJECT NUMBER: SIZE: SHEET: REV:
SPEL Environmental accepts no responsibility for any loss or
A3 1 1
damage resulting from any person acting on this information.
The details and dimensions contained in this document may change, DRAWING REQUEST NUMBER: SCALE: DWG No:
please check with SPEL Environmental for confirmation of current
specifications. D20669 N.T.S SP14-PC5820-S
6 5 4 3 2 1
Section 35
6 5 4 3 2 1
REVISION HISTORY
REV DESCRIPTION DESIGNER DATE CHECKED BY
1 INITIAL RELEASE M.M 25/03/2015
D D
700
5
4
C C
1
700
2
PLAN VIEW
ISOMETRIC VIEW
TYP
2 BOTTOM VIEW
6
B 3 B
450
PARTS LIST
ITEM QTY PART NUMBER DESCRIPTION
1 1 PLASTIC SHEETING HDPE ISOMETRIC VIEW
EXPLOSION
2 4 SHEET METAL BENDING STAINLESS STEEL 304
3 1 TEXTILE FABRIC & MESH LINER HDPE
4 16 BLIND RIVIT 7 DIA. STAINLESS STEEL 304
ELEVATION VIEW 5 4 CORNER ESTIFFENER - FLAT BAR 25 x 2 - 141 LG STAINLESS STEEL 304
6 12 CARABINER CLIP 6 ALUMINIUM
CLIENT: DISTRIBUTOR The drawings must not be disclosed to any third Drawn Date
parties without written permission from SPEL Environmental Sydney.
M.M 25/03/2015 TITLE
Unauthorised disclosure may result in prosecution.
SPEL Environmental - This drawing is the property of SPEL SPEL STOMSACK
CHECKED BY Date
A
Environmental ABN: 83 151 832 629 and is subject to return on FRAME 600 x 600 A
demand. It is submitted for the use only in connection with the
proposal and contracts of SPEL Environmental with the expressed Verified Date BASKET MOUNTING ASSEMBLY DRAWING
conditions that it is not to be reproduced or copied in any form.
This data must only be used in accordance with our standard
terms and conditions. Approved Date REQUEST No. SIZE SHEET REV
Copyright A3
SPEL Environmental accepts no responsibility for any loss or D20194 1 1
damage resulting from any person acting on this information. Customer Code : SCALE DWG No.
The details and dimensions contained in this document may change,
please check with SPEL Environmental for confirmation of current N.T.S SP15-BB4610-S
specifications.
6 5 4 3 2 1
Section 36
TfA Project Group Pty Ltd Stormwater Management Plan
Development Application
APPENDIX
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Appendix G
Section 37
SF IRINA: SOLUTIONS” Ae ie: Pollution Prevention Stormwater Treatment & Hydrocarbon Capture Petrol Stations , Australia yr
Section 38
Standards & Guidelines for Petrol Station Stormwater Pollution Control There is no Australian Standard for oil/water separators. There are only guidelines for hydrocarbon discharge limits for stormwater clischarge. All State and territory regulating environmental authorities (or EPA) have guidelines with varying terminology stating that hydrocarbons are not to be visual (10ppm) in stormwater and receiving waters. European Standard (oil and petrol separators) In the absence of an Australian Standard, the European British Standard 858.1 applies when Picture shows an under- compliance is the regulating issue. sized canopy with fuel . pumps outside the It is the world’s most stringent standard for canopy dripline hydrocarbons separation for the use of oil/petrol separators in surface water drainage systems. Prevents the emission of petro! odours. Australian Runoff Quality The Australian Runoff Quality A Guide to Water Sensitive Urban Design (Engineers Australia) ISBN 0. 85825 852 8 Chapter 9 ‘Hydrocarbon Management’ refers to The Standard and the European Agency UK Oil Separator Selection and Design’ for petrol stations. Non-Compliant Sites Petrol stations with the following defects. ¢ Canopy drip line that does not allow for the 10 degree inset ¢ Fuel hose line that reaches outside the drip line ¢ Fuel bowsers that have no canopy * Defective Oil/Water plate separator (Sewer connected) Picture shows a common site at petrol Picture shows a defective forecourt design Unseemly & highly visible hydrocarbons stations - uncovered fuel pumps. with oils and fuels discharging directly to the polluting the stormwater. The concentration street drain in the picture is in excess of 100ppm
Section 39
Solution for Non-Compliant Petrol Stations SPEL Puraceptor Class 1 stormwater treatment system is a solution for the “satment, capture and retention of focarbons off petrol stations. SPEL Puraceptor Class 1 can rationalize the existing use of service stations in conformity with the applicable environmental guidelines and put in place ongoing operational measures to prevent the likelihood of contamination in the case of an unforeseen future event. SPEL’s Puraceptor Class 1 oil/water separator is connected to the stormwater [provides the site with the hignest degree of environmental protection; - a protection that complies with the councils, and the EPA‘s guidelines.] Puraceptor Benefits © Full retention Class 1 treatment oil/water separator. It treats all liquid. There is no bypass. * Complies with federal and state government regulating environmental guidelines for water quality. ¢ University tested and certified to independent uropean Standard EN BS 858.1 for the capture and ois: of hydrocarbons with a discharge quality of no visible trace from a tested inflow concentrator of 5,000ppm. © Capture and contain oil/fuel spillages. © Can be sized to capture and contain a spill from a refuelling tanker and prevent discharge to stormwater. * Passive gravity function ensuring treatment is continuous. * Equipped with an intrinsically safe oil alert probe providing regular detection for oil build-up. Set to alarm when oil hydrocarbons attain 10% of the chambers volume, * Oil alert probe enables ‘self-monitoring’, suitable for unmanned and remote locations. © Equipped with a flame trap ensuring fire water is extinguished. © Equipped with a vapour trap preventing vapours from discharging and preventing the emission of odours. ¢ Water tight structure © Minimum 50 years life-span. © Low frequency and low cost maintenance iperations & Maintenance manual with a ledger for accurate recording of maintenance operations. ¢ Maintenance performed from ground level; no entering of tank is required, satisfying O.H.& S. requirements. = sap gigi ils Petrol forecourt and surrounds at a busy metropolitan petrol station rendered compliant. The catchment consists of a grated drain encompassing the complete perimeter of the under-sized canopy. Surface water and forecourt runoff drains to the Puraceptor located under the two trafficable covers in the foreground. Puracepter Certification Australian Independent Tests The Puraceptor has been independently tested at Australia's pre- eminent hydraulics research facility, the University of South Australia (UNISA), and at the Uk's leading hydraulics research faculty HR Wallingford. * NAIA analysis of the tests shows a water quality of no visible trace of hydrocarbons from an inflow concentration of 5,000ppm. In-Situ Testing NATA analysis of Puraceptors operating at similar applications in Australia reveal ‘no cletection’ of hydrocarbons from a captured concentration of 8,000ppm. Council Approvais The increasing awareness by councils of the superior European Standard has prompted many to review their current procedures and in only the past eighteen months over sixty councils have approved SPEL for service stations and similar applications with units’ already operational in excess of forty sites, tly tested for *rocucing we ave seen ane (Ts) ’ ya a g ; > swan gross polluraw 11008 Fer) ds (TPH) less, (cenified disenarge quality of ee European standard BSEN e584 y 45h total plrosphovous TS SS \ v >A5ih tocol mitrogen r= aa sf & \ 5 >go%p heavy metals
Section 40
‘Stormwater discharge quality Is < 1.86 mg/ hydrocarbon
content exceeding the Environmental Protection Agency
(E.PA.) requirements of 10mg/l hydrocarbon content.
Test sampling access: Field test discharged samples are
taken from sampling point and analysed by NATA 4
accredited laboratories.
Mat NTENANCE
Designed far high performance and low maintenance over a long life span
© Visible oils (TPH) are skimmed from the surface of the water level
« Easy and safe to access and clean, with access shafts positioned on
all chambers.
¢ No entering of the unit is required
¢ Not mandatory for the unit to be cleaned every 3 months.
© Only oils, sediment and gross pollutants need to be removed,
All stormwater does not require removal
© The cylindrical design ensures sediment collects easily on the floor
of the chambers effecting easy, quick removal. There are no square
corners or unreachable cavities and recesses.
© Waste is removed by a vacuum loading truck, (Suction truck)
g.-
will
The probe is freely suspended in the probe protection tube
in the separator at the correct level. When the ail-layer or
depth of hydrocarbons reaches the predetermined level, the
top of the probe will be immersed in the oil, breaking the
circuit and activating the alarm. It is intrinsically ‘fail-safe’
systern providing complete assurance that is operative. If a
fault occurs it will be signaled immediately.
ee
SPEL® PURACEPTOR tanks contain an immersed inlet
dip pipe to extinguish flames and prevent inflammable
vapours form passing through to the drainage system,
Complies with Section 6.3.4 of BS EN 858.1.2006.
‘SPEL PURACEPTOR can withstand temperatures of up
to 140°C.
The AUTOMATIC CLOSURE DEVICE (A.C.D.) is a precisely
\ engineered device comprising a water-buoyant ball
that is sensitive to any change in the water density as a
consequence of light liquids build up, thereby automatically
activating a process of depressing the A.C.D. to SHUT OFF
the separator, preventing pollutants from discharging to
drains and waterways.
Sapa zttle)p
ona
Oil Hatantion Criernoar
SPEL PURACEPTOR Class 1 separators
incorporate coalescer units. They
consist of a quality stainless steel
mesh container with an adjustable
handle and high volume reticulated
foam insert.
SPEL @ PURACEPTOR units are glass reinforced plastic
vessels made by the technical advanced chop hoop filament
winding process (patented) producing circumferential and
longitudinal strength complying with AS 2634-1983 for tank
design,
The coalescer unit is mounted in
the second chamber, providing
a coalescence process for the
separation of smatler globules of light
liquid pollutants before final discharge
to stormwater.
PURACEPTOR™ | Head Office
83 - 87 Fennell Street, Parramatta NSW 2150
OIL CAPTURE & CONTAINMENT Vege e5 9) 000
ACT NZ NSW / NT QLD SA Vic / TAS WA
02 6128 1000 +64 9 276 9045 02 8838 1000 07 3390 8677 08 8275 8000 03 5274 1336 08 9350 1000
Section 41
Oil containment
“How it works”
2,6
4
1
5A 5B
3
SPEL PURACEPTORTM is a FULL RETENTION 2 FULL RETENTION
separator that treats all flows and is sized to All liquid is treated. There is no by-pass operation.
contain more than the anticipated maximum 3 COALESCER EQUIPPED
oil spillage enabling it to be fully operational Provides a coalescing process for the separation of
at all times. smaller globular of light liquid pollutants to reduce the light
liquid content in the outlet to
It has two chambers, a coalescer and is fitted with an 5mg/litre or less.
automatic closure device specifically designed to treat and
contain major oil spills thereby making it suitable for high risk 4 INLET DIP PIPE - FLAME TRAP
applications. For minimum turbulence and to prevent fire and
inflammable vapours passing through to the drainage
It achieves a water discharge quality of 5mg light liquids per
system.
litre complying to European Standard BS EN 858.1. 2006.
Treatable flow rates range from 2LPS to 200LPS. Pipe sizes 5 TWO CHAMBER
range from 100mm to 450mm (larger sizes on request). A non-turbulant flow through two horizontal treatment
chambers, utilising the underflow principle to retain light
Careful and proper planning by corporate Australia and
liquids in all flow conditions.
government bodies is essential when designing and
implementing systems that are effective in protecting our A. CONTAINMENT CHAMBER: Where Total Suspended
environment.The proven and independently accredited SPEL Solids (TSS ) silt, sediments, sludge and gross pollutants
PURACEPTORTM (complies to European Standard BS EN are trapped and settle on the chamber floor and where
858.1 2006) is an Australian made stormwater treatment light liquids are contained.
and oil containment device that can contain and prevent light
liquid pollutants from discharging into our waterways. B. COALESCER CHAMBER: Where light liquids
separation is enhanced reducing it to 5mg/litre or less
1 AUTOMATIC CLOSURE DEVICE prior to discharge.
The AUTOMATIC CLOSURE DEVICE (A.C.D.) is a
precisely engineered device comprising a water-bouyant 6 GRAVITY OPERATED
ball that is sensitive to any change in the water density Will function in the event of power failure and fits into
as a consequence of light liquids build up, thereby existing pipe drainage systems or new sites.
automatically activating a process of depressing the
A.C.D. to SHUT OFF the separator, preventing pollutants 7 MAINTENANCE
from discharging to drains Easy and safe with no entering of the tank required.
and waterways.
Section 42
SPEL Separator Commisioning Operation and Maintenance
Puraceptor Class 1
Operation and Maintenance Manual
1800 631 202
AUSTRALIA WIDE
Section 43
Introduction
Congratulations on your purchase of a SPEL Environmental Stormwater Quality Improvements Device.
With proper care and by following a few simple guide lines your system will give you many years
of dependable service.
Important
Only qualified personnel should maintain, operate and repair you Stormwater system. Any wiring of equipment should be
performed by a qualified electrician.
Warning
Operation may cause injury. Take all necessary precautions, wear protective equipment, refer to Engineers Department.
For your own safety, read all instruction manuals prior to working on equipment.
Safety Precautions
• Follow all “occupation, health and safety” regulations.
• Ensure maintenance personnel are aware of “Confined Spaces” guidelines, which must be followed.
• Make sure that there is sufficient oxygen and that there are no poisonous gases present.
• Check the explosion risk before wielding or using electric hand tools.
• Do not ignore health hazards. Observe strict cleanliness.
• Ensure that the lifting equipment (where required) is in good condition.
• All personnel who are to work with these systems should be vaccinated against diseases that can occur.
• Keep a first aid kit handy.
Health & Safety
Maintenace should be carried out by a competent contractor in accordance with the above procedures.
Health and Safety at Work legislation and good building practice.
A warning notice should be visible at the top of each access shaft - ‘danger, harmful fumes’ and ‘ respirators should be
worn in this tank.’ Before entering persons must be qualified in accordance with ‘confined space’ requirements
Information contained in this data sheet is approximate and for general guidance only. In accordance with the companies
policy of constant improvement and development SPEL Products reserves the right to change the specification without
prior notice.
Section 44
Puraceptor Class 1
Operation and
Maintenance Manual
Service Stations
Fuel Depots
Windfarms
Switchyards
Sub Stations
Power Stations
Industrial Locations
Contents
SPEL Puraceptor - How it works page 2
SPEL Puraceptor Maintenance page 3
SPEL Coalescer Units page 4
SPEL Auto Closure Device page 5
SPEL Oil Alert System page 6
Spare Parts List page 8
1800 631 202
AUSTRALIA WIDE
Section 45
Oil containment
“How it works”
2,6
4
1
5A 5B
3
SPEL PURACEPTORTM is a FULL RETENTION 2 FULL RETENTION
separator that treats all flows and is sized to All liquid is treated. There is no by-pass operation.
contain more than the anticipated maximum 3 COALESCER EQUIPPED
oil spillage enabling it to be fully operational Provides a coalescing process for the separation of
at all times. smaller globular of light liquid pollutants to reduce the light
liquid content in the outlet to
It has two chambers, a coalescer and is fitted with an 5mg/litre or less.
automatic closure device specifically designed to treat and
contain major oil spills thereby making it suitable for high risk 4 INLET DIP PIPE - FLAME TRAP
applications. For minimum turbulence and to prevent fire and
inflammable vapours passing through to the drainage
It achieves a water discharge quality of 5mg light liquids per
system.
litre complying to European Standard BS EN 858.1. 2006.
Treatable flow rates range from 2LPS to 200LPS. Pipe sizes 5 TWO CHAMBER
range from 100mm to 450mm (larger sizes on request). A non-turbulant flow through two horizontal treatment
chambers, utilising the underflow principle to retain light
Careful and proper planning by corporate Australia and
liquids in all flow conditions.
government bodies is essential when designing and
implementing systems that are effective in protecting our A. CONTAINMENT CHAMBER: Where Total Suspended
environment.The proven and independently accredited SPEL Solids (TSS ) silt, sediments, sludge and gross pollutants
PURACEPTORTM (complies to European Standard BS EN are trapped and settle on the chamber floor and where
858.1 2006) is an Australian made stormwater treatment light liquids are contained.
and oil containment device that can contain and prevent light
liquid pollutants from discharging into our waterways. B. COALESCER CHAMBER: Where light liquids
separation is enhanced reducing it to 5mg/litre or less
1 AUTOMATIC CLOSURE DEVICE prior to discharge.
The AUTOMATIC CLOSURE DEVICE (A.C.D.) is a
precisely engineered device comprising a water-bouyant 6 GRAVITY OPERATED
ball that is sensitive to any change in the water density Will function in the event of power failure and fits into
as a consequence of light liquids build up, thereby existing pipe drainage systems or new sites.
automatically activating a process of depressing the
A.C.D. to SHUT OFF the separator, preventing pollutants 7 MAINTENANCE
from discharging to drains Easy and safe with no entering of the tank required.
and waterways.
2
Section 46
SPEL PURACEPTORTM
PuraceptorsTM should be inspected at three - six - or twelve monthly intervals depending on site conditions, to determine the depth of
retained pollutants and silt in both chambers and the correct operating of the ACD (automatic closure device). When the depth of the
oil/fuel retained has reached the predetermined design level, (approx. 50mm) or after a spill it should be cleaned out.
1 CONTAINMENT CHAMBER: Where silt, sediments, sludge, gross pollutants settle out and light liquids are retained. The auto closure
device operates in its retaining tube next to the oil alert sensor probe.
2 COALESCER CHAMBER: Where light liquids separation is enhanced prior to discharge and where the coalescer unit is incorporated,
the coalescer should be removed and cleaned in accordance with the requirements set out in the coalescer data sheet.
F B C D A E
2
1
MAINTENANCE PROCEDURE
A Coalescer unit C Sucking out oil/fuel and silt E Re-insert coalescer unit and ACD
Use the lifting handle or the Suck off the retained oil from both chambers of the PuraceptorTM and then Re-insert the foam insert into the stainless steel coalescer
chain and lift the coalescer the silt deposited on the bottom, leaving sufficient water to ensure the unit and re-insert the coalescer unit into the PuraceptorTM
unit out of the tank and place (auto closure device) ACD remains floating. as provided with the SPEL lifting/location/locking system.
it near the PuraceptorTM. In a
retained area so pollutants do
D Sucking out complete contents (if necessary) Partially fill the PuraceptorTM with clean water (if necessary)
If the quantity of pollutants exceeds recommended level, the to ensure the ACD when re-inserted remains floating.
not escape.
complete contents of the PuraceptorTM may need to be removed. Re-insert the ACD.
B Cleaning foam insert After sucking out completely, remove the ACD. Using a pole with
Finally check the ACD is floating and the retaining cap
Remove foam insert and wash a hook, lift out the ACD using the lifting eye on the float.
has been replaced to safeguard against its removal by
with normal water pressure unauthorised persons, unless depth of tank precludes doing
ensuring the dirty water runs so from ground level.
into the PuraceptorTM.
F SPEL automatic alarm/monitoring system
The SPEL automatic alarm/monitoring system probe should
Important note: be lifted out of the probe protection tube, wiped clean and
When cleaning out, ensure both chambers are sucked out equally starting with the first chamber and re-inserted. the system should now be reset according to
then the second chamber and back again. Ensuring even water pressure against baffle wall. instructions.
3
Section 47
SPEL COALESCER UNITS
The SPEL PuraceptorTM Class 1 separator and the SPEL StormceptorTM Class 1 by-pass separators incorporate
coalescer units. The coalescer units provide a coalescence process for the separation of small globules of light
liquid pollutants before final discharge to the surface water drain.
Coalescers are found in the second chamber of the SPEL PuraceptorTM and the second chamber of the SPEL
StormceptorTM Class 1
Prior to installation
1. Remove any strapping / ropes which have been used to hold the coalescer units from shifting in transit.
2 The access shaft(s) above the coalescer units should be covered to prevent ingress of
concrete, dust, debris etc., which could clog the foam inserts.
3. On completion of installation, check that the coalescer unit is inserted securely into the base socket. Retaining
On heavily polluted sites silt and contaminants may build up in the coalescer unit foam inserts clip
and add significantly to it’s weight. Use lifting chain sets that are on hooks at ground level
for safe lifting with a tripod or hoist. Extension shaft
Installation
During installation, it is important that the foam inserts are not clogged with dust, debris or
drops of wet concrete. To safeguard against this, we recommend covering the access shaft
with a sheet of polythene, if not already covered.
Static water level
Commissioning
On completion of installation, check the foam insert is fitted inside the stainless steel coalescer
unit and the coalescer unit is inserted securely into the base socket. Lifting handle
Maintenance
1. Lift handle and coalescer unit out of the tank and place in a retained area so pollutants do not escape. Coalescer unit
2. Remove foam insert and wash with normal water pressure ensuring the dirty water runs into the
PuraceptorTM / StormceptorTM.
3. Make sure the hole in the centre of the coalescer foam is facing towards the manhole
when installed in the tank.
4. Re-insert the foam insert into the stainless steel coalescer unit and re-insert the coalescer into the Figure 1. Coalescer unit with lifting chains
PuraceptorTM / StormceptorTM. After the tank has been cleaned.
SPEL COALESCER UNITS GUIDE RAIL SYSTEM/LIFTING, Handle with locating/
LOCATING AND LOCKING SYSTEM locking bracket to guide
rail system
SPEL coalescer unit guide rail system
This facilitates easy insertion and removal of coalescer units. The system is robust, manufactured Handle extension
(optional extra with
throughout in stainless steel and is action positive, leaving no doubt the coalescer
extension shafts)
unit is located properly.
Brackets fixed to the top and bottom of the coalescer unit simply engage the stainless steel
guide rail fixed to the top of the stub access shaft. The coalescer is then lowered in the normal way,
being guided at the correct angle into the conical base unit which finally locates the coalescer unit Coalescer guide
into it’s final position. rail system
Extension guide rails can be incorporated into the SPEL extension shafts to suit
(preferably when ordered with the separator).
However, when the separator is full of water, debris or sludge accumulated over a period
could prevent the coalescer unit from re-seating correctly after servicing.
The coalescer unit lifting / locating / locking system ensures the coalescer unit is seated
correctly and can be locked into position to prevent tampering. Lifting hook
The stainless steel lifting handle can be extended to suit deep tank inverts and provide easy
access for lifting manually or with a tripod and hoist utilising the lifting hook.
Figure 2. SPEL coalescer unit guide rail
system/lifting, locating and locking system
4
Section 48
SPEL AUTO CLOSURE DEVICE (ACD)
• SPEL ACDThe Automatic Closure Device (ACD) is found in the first chamber of a PuraceptorTM. The purpose of
the ACD is to close the separator off automatically when the maximum storage capacity of light liquid is attained.
The ACD is to ensure that in the event of a major spillage, pollutants do not pass into the drainage system; it
should not be regarded as a substitute for an automatic alarm / monitoring system.
Prior to installation
Prior to installation the ACD retaining tube should be covered to prevent ingress of concrete etc., which could fall onto the ACD and
upset it’s calibration.
Operation and Maintenance
If the tank should fill with light liquid, the ACD which is calibrated for a specific gravity of 0.85, will automatically sink and
close off the SPEL PuraceptorTM.
Normally routine maintenance would include removing light liquid intercepted within the PuraceptorTM. If a SPEL automatic alarm / monitoring
system is incorporated, it will automatically indicate when the PuraceptorTM should be emptied. Only in an emergency will the PuraceptorTM fill to
it’s maximum and operate the ACD.
In such an event the PuraceptorTM should be completely sucked out and the ACD lifted out. Check that the ACD is in good working condition – ie.
Lifting hook secure and sealed; float not leaking; knuckle joint free and clean; sealing ring intact and complete. Clean with warm soapy water
before re-inserting.
To re-insert the ACD, partially fill the PuraceptorTM with clean water (if necessary) to ensure the ACD when re-inserted remains floating.
Re-insert the ACD.
Finally check the ACD is floating and the retaining cap has been replaced to
safeguard against it’s removal by unauthorised persons, unless depth of tank
precludes doing so from ground level.
Automatic closure device SPEL PuraceptorTM Class 1
separators (two chamber)
SPEL PuraceptorTM Class 1 separators – Two Chamber Models
Commissioning S/S lifting eye
Lockable retaining cap
After the tank has been installed, leave the water in.
1. Remove the ACD from the packing box, taking care not S/S lifting hook
to cause damage.
Water level
2. Remove the retaining cap from the top of the retaining
tube in the separator. Initial operating position
of the automatic closure
3. Insert the ACD into the retaining tube using the lifting eye device (no oil present)
provided, ensuring it floats correctly with the float (top section approx. 30mm)
just visible above the water level.
4. Replace the retaining cap. This is to safeguard against
the removal of the float by unauthorised persons or rising
above the tube under abnormal conditions. Automatic closure
device tube
Note: If the tank’s invert depth exceeds 1metre, it is advisable
to remove the retaining cap prior to installation and only
replace after inserting the ACD, if it is possible to do so
from ground level. Automatic closure device
(closed position)
5
Section 49
SPEL Automatic Alarm/Monitoring System
The SPEL automatic alarm/monitoring system provides a audible warning alarm when the level of the oil in the SPEL separator reaches
approximately 10% of the storage volume under static liquid level conditions. This is a early warning system that is used for spills
or lack of maintenance.
The system comprises of a probe mounted in the main separation chamber which senses when the designed volume of light liquids has
accumulated and sends a signal to the electronic control unit activating a red ‘empty now’ warning light and an audible alarm,
Safe area Operation
Hazardous area Control The probe is freely suspended in the probe protection tube in
SPEL seperator Unit the separator at the correct level. When the oil-layer or depth
of hydrocarbons reaches the predetermined level, the top of
the probe will be immersed in the oil, breaking the circuit and
activating the alarm. It is a ‘fail-safe’ system providing
complete assurance that it is operative. If a fault occurs it will be
signalled immediately.
Installation
Control unit (general positioning)
The control unit has been designed to be located indoors and
outdoors, within a nonhazardous area. It should be wall mounted
and positioned such that the LED display and push switches
on the front panel can be readily seen and accessed. The unit
can be secured to the wall by using the four mounting holes
provided. Included within the control is an intrinsically safe
circuit (approved according to ATEX Directive 94/9/EC), to
which the probe unit is connected.
Cable to control unit Probe junction box
Access shaft
Maintenance
When the separator is maintained, lift the probe out of the probe
protection tube, check it operates the alarm (see under Tests Ref. 10.2) Cable coiled for
Location cap adjustment and
and at the same time wipe oil and contaminants from the probe to testing
prevent a fake alarm after re-inserting.
Probe protection tube
Probe
Insert probe onsite
The probe protection tube is factory fitted and the probe
matched to ensure the alarm is activated when the light liquids
reach approximately 10% of the storage volume the SPEL
separator is designed for.
All that is required on site is to undertake the electrical
installation in accordance with the instructions provided and
lower the probe with the pre-fixed location cap into the probe
protection tube. When the cap locates onto the top of the probe
protection tube, the probe is suspended at the correct level.
6
Section 50
SPEL Automatic Alarm/Monitoring System
Control unit (electrical connections) Probe
1. Mains voltage connection; The probe is installed freely suspended in the SPEL separator within the probe
The control unit should be connected to a suitable protection tube. The 3-core cable is connected into the junction box mounted in
220/240V AC supply and fused at 3 amps. the access shaft above the probe protection tube. Extra cable is provided to enable
raising the junction box where extension shafts are incorporated.
Note: This appliance must be earthed.
Important note: In all cases good, standard electrical practice should be followed
2. Control unit/probe junction box connection and the installation must conform to the Australian Wiring Rules – AS 3000 – 2007.
Wiring from the control unit to the probe junction box In essence, the installation must be such that the intrinsic safety is
in the separator chamber requires a 3-core screened. no compromised by:
0.75mm core section cable.
• Exposure to risk of mechanical damage
Maximum cable length: 300 metres.
• Unauthorised modification of interference
3. Probe connection
• Exposure to moisture, dust and foreign bodies
A 5 metre 3-core probe cable is normally fitted to the
junction box and the probe. • Excessive heat
After all connections have been made, the cables must • Invasion of intrinsically safe circuit by other electrical equipment or circuitry
be secured by tightening each entry gland.
Certificate of conformity
The alarm device has been approved to be used in explosion-hazardous areas. The
control unit and probe are approved according to ATEX Directive 94/9/EC. These
approvals mean that the probes can be installed in Zone 0, which is continuously
explosion-hazardous.
The SPEL oilset control unit must be located in the safe area, but it can be
connected to the probe without any barrier.
Tests (10.2)
The function can be tested by lifting the probe within the probe protection tube. In
approximately 5 seconds, the alarm is given by a red light and audible signal. Both
relays release. Push the RESET button - the buzzer goes off and relay pulls in.
When the probe is placed in water again, relay pulls in and the red light goes off.
Cable break and short circuit test
Also the function can be tested in case of cable fault or short circuit. First cause
short circuit in probe cable terminals 1 and 2. Then the yellow light of short circuit
is lit. Both the relays pick up and the buzzer goes on. Remove the short circuit and
reset the buzzer.
Simulated Function Test
The function of probe, cable and electronics can be tested. Push the TEST button for
2 to 5 seconds. Both relays pick up, and the red light is lit. When the TEST button is
released, the red light goes off and relay returns to its normal position. The buzzer
and relay must be reset.
Installation
Important note: It is important that installation is carried out by a competent
technician familiar with this type of equipment or contact our Special Products
Division for installation, commissioning and maintenance service.
7
Section 51
SPARE PARTS LIST
DATE:
INVOICE NO:
TYPE:
MODEL:
SERIAL NO:
JOB NO:
LINE DESCRIPTION QTY PART No.
1
2
3
4
5
6
7
8
For all spare parts enquiries, please ring 1800 631 202
8
Section 52
OilSET-1000 Oil Separator Alarm Device D15383Be
1/10
OilSET-1000
Oil Separator Alarm Device
Installation and Operating Instructions
Copyright © 2010 We reserve the right for changes without notice
Section 53
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
TABLE OF CONTENTS
1 GENERAL ............................................................................................................ 3
2 INSTALLATION ................................................................................................... 4
2.1 OilSET-1000 control unit .............................................................................. 4
2.2 SET/DM3D probe ......................................................................................... 5
2.3 Cable joint .................................................................................................... 5
3 OPERATION AND SETTINGS ............................................................................ 6
3.1 Operation ..................................................................................................... 6
3.2 Factory settings ............................................................................................ 7
4 TROUBLE-SHOOTING ....................................................................................... 8
5 REPAIR AND SERVICE ...................................................................................... 9
6 SAFETY INSTRUCTIONS ................................................................................... 9
7 TECHNICAL DATA ............................................................................................ 10
SYMBOLS
Warning / Attention
Pay special attention to installations at explosive atmospheres
Device is protected by double or reinforced insulation
Copyright © 2010 2/10 We reserve the right for changes without notice
Section 54
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
1 GENERAL
OilSET-1000 is an alarm device for monitoring the thickness of the oil
layer accumulating in an oil separator. Depending on the order, the
delivery consists of OilSET-1000 control unit, SET/DM3D probe and a
cable joint.
Figure 1. Oil separator alarm system
SET/DM3D probe is installed into the light liquid storage chamber and
gives an alarm when the chamber is filled to a pre-determined degree.
The probe is normally immersed in water.
The function is based on the measurement of the electrical
conductivity of the surrounding liquid – water conducts electricity
much better than oil.
Oil separator is regarded as potentially explosive (Ex) area.
SET/DM3D probe can be installed in a zone 0, 1 or 2 potentially
explosive area but the control unit must be mounted in a safe area.
The LED indicators, push buttons and interfaces of the OilSET-1000
control unit are described in figure 2.
Figure 2. OilSET-1000 control unit - features
Copyright © 2010 3/10 We reserve the right for changes without notice
Section 55
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
2 INSTALLATION
2.1 OilSET-1000 control unit
OilSET-1000 control unit can be wall-mounted. The mounting holes
are located in the base plate of the enclosure, beneath the mounting
holes of the front cover.
The connectors of the external conductors are isolated by separating
plates. The plates must not be removed. The plate covering the
connectors must be installed back after executing cable connections.
The cover of the enclosure must be tightened so, that the edges touch
the base frame. Only then do the push buttons function properly and
the enclosure is tight.
Before installation, please read the safety instructions in chapter 6 !
Figure 3. OilSET-1000 alarm device installation.
Copyright © 2010 4/10 We reserve the right for changes without notice
Section 56
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
2.2 SET/DM3D probe
SET/DM3D probe should be installed as described in figure 3.
The probe gives an alarm earliest when the upper electrode is in oil
and latest when the probe is totally immersed in a non-conductive
liquid - in other words, it is totally away from the water.
Please check the correct installation depth also from the instructions
of the oil separator.
2.3 Cable joint
Fig. 4 Cable joint SK-3-2500
Connections of the probe cable inside the cable joint are explained in
figure 3. Cable shields and possible excess wires need to be
connected to the same point in galvanic contact.
Please make sure, that the probe and cable between OilSET-1000
control unit and the probe do not exceed the maximum allowed
electrical parameters – see chapter 7 Technical data.
IP rating of the cable joint is IP67. Make sure, that the cable joint is
closed properly.
If the probe cable must be extended and there is a need for
equipotential grounding, it should be done with the junction box LJB2.
The cabling between the OilSET-1000 control unit and the junction
box should be done with a shielded twisted pair instrument cable.
Fig. 5. Cable installation example Fig. 6. Installation accessories
Copyright © 2010 5/10 We reserve the right for changes without notice
Section 57
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
3 OPERATION AND SETTINGS
The OilSET-1000 alarm device is initialized at the factory.
The operation of the alarm device should be checked always after the
installation.
Functionality test 1. Immerse the probe into water. The device should be in normal mode.
2. Lift the probe up in air or oil. An Oil alarm should be generated (see
chapter 3.1 for more detailed description).
3. Immerse the probe back into water. The alarm should go off after a
delay of 5 sec. Clean up the probe if necessary before placing it back
into the oil separator.
A more detailed description of the operation is provided in chapter 3.1.
If the operation is not as described here, check the factory settings
(chapter 3.2.) or contact a representative of the manufacturer.
3.1 Operation
The operation of a factory-initialized OilSET-1000 is described in this
chapter.
Normal mode – no alarms SET/DM3D probe is totally immersed in water.
Mains LED indicator is on.
Other LED indicators are off.
Relays 1 and 2 are energized.
Oil alarm SET/DM3D probe is immersed in oil. (The probe gives an alarm earliest
when the upper electrode is in oil and latest when the probe is totally
immersed in a non-conductive liquid, in other words it is totally away from
the water.)
Mains LED indicator is on.
Oil Alarm LED indicator is on.
Buzzer on after 5 sec delay.
Relays de-energize after 5 sec delay.
(Note. The same alarm takes place when SET/DM3D probe is in the air.)
After removal of an alarm, the Oil Alarm LED indicator and buzzer will be
off, and relays will be energized after a fixed delay of 5 sec.
Fault alarm Probe cable break, short circuit or a broken probe, i.e. too low or too high
probe signal current.
Mains LED indicator is on.
Probe circuit Fault LED indicator is on after 5 sec delay.
Buzzer is on after 5 sec delay.
The relays de-energize after 5 sec delay.
Reset of an alarm When pressing the Reset push button.
Buzzer will go off.
Relay 1 energizes.
Relay 2 will stay de-energized until the actual alarm or fault is off.
TEST FUNCTION
Test function provides an artificial alarm, which can be used to test the
function of the OilSET-1000 alarm device and the function of other
equipment, which are connected to OilSET-1000 via its relays.
Attention! Before pressing the Test button, make sure that the change
of relay status does not cause hazards elsewhere!
Copyright © 2010 6/10 We reserve the right for changes without notice
Section 58
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
Normal situation When pressing the Test push button:
Oil Alarm and Fault LED indicators are immediately on.
Buzzer is immediately on.
Relays de-energize after 2 sec of continuous pressing.
When the Test push button is released:
LED indicators and buzzer go immediately off.
Relays energize immediately.
Alarm on When pressing the Test push button:
Fault LED indicator is immediately on.
Oil Alarm LED indicator remains on.
Buzzer remains on. If it has been reset earlier, it will return to be on.
If relay 1 was already reset, it will de-energize again after 2 sec. of
continuous pressing.
Test will not affect relay 2, because it is already in alarm status.
When the Test push button is released:
The device returns without delay to the preceding status.
Fault alarm on When pressing the Test push button:
The device does not react to the test at all.
3.2 Factory settings
If the operation of OilSET-1000 is not as described in the previous
chapter, check that the device settings are as in figure 7. Change the
settings according to the following instructions if needed.
The following tasks must only be executed by a person with proper
education and knowledge of Ex-i devices.
We recommend, that when altering the settings the mains voltage is
off or the device is initialized before the installation is executed.
Figure 7. Factory settings
The settings are made with switches (MODE and DELAY) and
potentiometer (SENSITIVITY) located in the upper printed circuit
board, and the jumper located in the lower board (figure 7). In figure 7,
the switches are as set in the factory.
Switch S2 is used to set the operational delay of the control unit. When the switch is in low
position, relays operate and buzzer is on after 5 seconds after the level has reached the
trigger level, and if the level still remains on the same side of the trigger level.
When the switch is in high position, the delay is 30 seconds.
Delays are operational in both directions (energizing, de-energizing). Alarm LED follows the
probe current value and trigger level without delay. Fault alarm takes place after a fixed delay
of 5 sec.
Copyright © 2010 7/10 We reserve the right for changes without notice
Section 59
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
4 TROUBLE-SHOOTING
Problem: MAINS LED indicator is off
Possible reason: Supply voltage is too low or the fuse is blown. Transformer or MAINS LED
indicator is faulty.
To do: 1. Check if the two pole mains switch is off.
2. Check the fuse.
3. Measure the voltage between poles N and L1. It should be 230 VAC + 10 %.
Problem: No alarm when probe in oil or air, or the alarm will not go off
Possible reason: The SENSITIVITY setting is wrong in the control unit (see figure 7), or probe is
dirty.
To do: 1. Clean-up the probe and lift it up in the air or immerse it into oil.
2. Turn the SENSITIVITY potentiometer slowly anticlockwise until the probe gives
an alarm.
3. Immerse the probe into water and wait until the alarm goes off. If the alarm does
not go off, turn the potentiometer slowly clockwise until the alarm goes off.
4. Lift the probe up in the air or oil. The probe should give an alarm again.
Problem: FAULT LED indicator is on
Possible reason: Current in probe circuit too low (cable break) or too high (cable in short circuit).
The probe might also be broken.
To do: 1. Make sure, that the probe cable has been connected correctly to the OilSET-
1000 control unit. See probe specific instructions.
2. Measure the voltage separately between the poles 10 and 11. The voltages
should be between 10,3….11,8 V.
3. If the voltage is correct, measure the probe current. Do as follows:
3.1 Disconnect probe’s [+] wire from probe connector (pole 10).
3.2 Measure short circuit current between [+] and [-] poles.
3.3 Connect mA-meter as in figure 8.
Make a comparison to the values in Table 1.
3.4 Connect the wire back to the connector.
If the problem can not be solved with the above instructions, please contact
Labkotec Oy’s local distributor or Labkotec Oy’s service.
Attention! If the probe is located in an explosive atmosphere, the multimeter must
be Exi-approved!
SET/DM3D, channel 1
Poles 10 [+] ja 11 [-]
Shortcircuit 20 mA – 24 mA
Probe in the air 9 – 10 mA
Probe in oil (εr . 2) 9 – 10 mA
Probe in the water 2 – 3 mA
Factory setting for approx. 6.5 mA
alarm point
Figure 8. Probe current measurement Table 1. Probe currents
Copyright © 2010 8/10 We reserve the right for changes without notice
Section 60
OilSET-1000 Oil Separator Alarm Device D15383Be
Installation and Operating Instructions
5 REPAIR AND SERVICE
The probe should be cleaned and the operation should also be tested
when emptying the oil storage chamber or at least once every six
months. The easiest way to check the operation is to lift the probe up
in the air and to put it back to the separator. The operation is
described in chapter 3.
For cleaning, a mild detergent (e.g. washing-up liquid) and a
scrubbing brush can be used.
The mains fuse (marked 125 mAT) can be changed to another glass
tube fuse 5 x 20 mm / 125 mAT complying EN 60127-2/3. Any other
repair and service works on the device may be carried out only by a
person who has received training in Ex-i devices and is authorized by
the manufacturer.
In case of queries, please contact Labkotec Oy’s service:
[email protected] SAFETY INSTRUCTIONS
OilSET-1000 control unit must not be installed in potentially explosive
atmosphere. Probes connected to it may be installed in zone 0, 1 or 2
potentially explosive atmospheres.
In case of installations in explosive atmospheres the national
requirements and relevant standards as EN 50039 and/or EN 60079-
14 must be taken into account.
If electrostatic discharges can cause hazards in the operating
environment, the device must be connected into equipotential ground
according to requirements with regards to explosive atmospheres.
Equipotential grounding is made by connecting all conductive parts
into same potential e.g. at the cable junction box. Equipotential ground
must be earthed.
The device does not include a mains switch. A two pole mains switch
(250 VAC 1 A), which isolates both lines (L1, N) must be installed in
the main power supply lines in the vicinity of the unit. This switch
facilitates maintenance and service operations and it has to be marked
to identify the unit.
When executing service, inspection and repair in explosive
atmosphere, the rules in standards EN 60079-17 and EN 60079-19
about instructions of Ex-devices must be obeyed.
Copyright © 2010 9/10 We reserve the right for changes without notice
The text continues on section 61.