Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.1.2 Performance objectives
The objectives are:
• Minimise the amount of sediment entering Noosavilley’s waterways and stormwater drains;
• Minimise or prevent environmental harm to the City’s waterways and associated ecosystems;
• Minimise localised flooding caused by sediment runoff;
• Minimise exposure of soils.
Table 17: Construction phase performance criteria
Indicator Water Quality Objectives
pH 6.5 – 8.5
Suspended Solids Annual Mean < 10mg/L
Oils and Grease No visible films or odour
Litter/ Gross pollutants No anthropogenic (man-made) materials greater than
5mm in any dimension
Dissolved oxygen 80-100% saturation
7.1.3 Monitoring and Maintenance
The general requirement of monitoring during the construction phase will be:
• Work activities are restricted to designated construction areas;
• Earthworks and site clearing are undertaken in accordance with an Erosion and Sediment Control Plan;
• Erosion and sediment control devices are to be constructed/installed in accordance with an Erosion and
Sediment Control Plan;
• Inspection of sediment fences, erosion and sediment control structures/devices on a weekly basis as well
as after any rain event exceeding 25mm in 24hrs (major storm event);
• Stormwater discharges from the site are not having any adverse effect on the downstream environment;
• Monitoring and recording of the performance of the drainage control devices including water quality
testing where required;
• Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
from the site;
• Any failure to the stormwater system causing damage to surroundings should implement immediate
remedial work to the damaged area.
7.1.4 Responsibility and Reporting
• The contractor shall be responsible for monitoring the performance of all drainage control and erosion and
sediment control devices;
• Records of any failures to devices should be kept and reported to the Construction Manager;
• Regular inspections of the devices shall be reported to the Construction Manager;
• Inspections of the devices after heavy rainfall shall be reported to the Construction Manager;
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.