Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTfA Project Group Pty Ltd Stormwater Management Plan
Development Application
Table 15: Required detention volume for the catchment
Design Storm Post Development Allowable stormwater discharge Required Detention volume
from the Detention Basin(s)*
ARI Flow rate Flow rate Volume
Years L/S L/S L
1 55,25 28.97 10,410
2 74,71 39.02 14,150
5 102.47 54.13 19,118
10 119.85 63.15 22,435
20 142.62 75.12 26,713
50 108.49 95.35 33,669
100 206.83 109.68 38,391
*The figures are based on the stormwater runoff from the pre-development catchment less the stormwater runoff
from the non-developed area at the back of the proposed building on the Southern corner of the post-development
catchment.
Therefore, a 38,400L detention storage volume is required to mitigate peak flows from the catchment. The outlet
arrangement of the detention basin shall be designed at the Operational Works phase of the project and it will
ensure that the design flow rates do not exceed pre-development flow rates for the nominated design storm events.
Appropriate design software shall be used at the operational works stage to determine the actual design volume
of the onsite detention basin required and a suitable outlet arrangement (e.g. orifice plate, culvert, etc.).
7 WATER QUALITY ASSESSMENT
7.1 Construction Phase
Impacts on receiving waters and surrounding areas will be minimised during the construction phase with
measures as outlined in this SBSMP and an Erosion and Sediment Control Plan to be developed at the
Operational Works stage.
7.1.1 Pollutants
Typical pollutants generated during the construction phase of the development are shown below in Table 16.
Table 16: Pollutant typically generated during the construction phase
Pollutant Sources
Litter Paper, construction packaging, food packaging, cement bags, off-cuts
Sediment Unprotected exposed soils and stockpiles during earthworks and building
Hydrocarbons Fuel and oil spills, leaks from construction equipment
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash-waters
pH altering substances Acid sulphate soils, cement slurry and wash-waters
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.