Log in to see the plans as drawnTfA Project Group Pty Ltd Stormwater Management Plan
Development Application
7.3.1.1 Spel® Puraceptor
The Puraceptor will have a minimum containment volume of 10,000litres, which allows for containment for spill
from an 8,000 litre tanker compartment plus allowances for wind-blown rain. The Puraceptor will remove
hydrocarbons, gross pollutants and total suspended solids. Refer to Appendix F for details of the Spel® Puraceptor.
7.3.2 Underground Fuel Storage Tanks
Underground fuel storage tanks, piping and fuel dispensers will be installed in accordance with the Australian
Institute of Petroleum (AIP) standards.
7.3.3 Areas outside Canopy
All driveways and car parking areas will be concrete surfaced and will drain via gully inlet pits, which will have
Spel® Stormsacks inserts to capture gross pollutants before discharging to the legal point of discharge. Refer to
Appendix F for typical details of the Stormsacks system.
7.4 Water Quality Assessment
No water quality assessment is required as the total site area is less than 2,500m².
8 SITE MAINTENANCE AND MANAGEMENT PROCEDURES
The service station operator will have a Petrol Handling Manual that will set out all requirements for the safe
handling of combustible and flammable materials. This manual will dictate weekly, monthly and annual checking
procedures with checklists, which will be completed, and the records stored.
The manual will also set out dry cleaning methods to be employed within the fuel dispensing area in lieu of washing
down to reduce possible contaminated runoff. Emergency procedures will be also clearly set out detailing actions
to be taken by site personnel in the case of varying possible emergencies such as spills, fire or risk of fire, vehicle
accidents, etc.
In addition a regular cleaning, maintenance program/contract is to be established for emptying of rubbish bins
located around the site, removal of general litter from the site, inspection of stormwater gully pits and removal of
any sediment or captured litter from the Spel® Stormsacks systems. The Spel® Stormsacks will be inspected and
maintained in accordance with the manufacturer’s instructions. Refer to Appendix G for maintenance plans.
The maintenance plan will address the following:
• Inspection frequency;
• Maintenance frequency;
• Data collection/storage requirements;
• Detailed cleanout procedures.
The plan will include inspection procedures covering aspects such as equipment needs, maintenance techniques,
occupational health and safety, public safety, environmental management considerations, disposal requirements
of pollutants collected and access issues.
123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.