Original source · versioned page text
Appendix C - Stormwater Management Plan
Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNF TfA Project Group Pty Ltd Stormwater Management Plan Development Application This Site Based Stormwater Management Plan has demonstrated that adequate stormwater quality management principles and techniques will be employed during the construction and operational phases of this development to comply with the Queensland State Planning Policy July 2014 and Noosa Council's requirements. The methods proposed are considered current best management practice for a development of this type, on this site. Yours faithfully Leo Salinas BEng, MIEAust Civil Engineer For and on behalf of TfA Project Group Reviewed By Juan Avella (RPEQ 11899) BEng, MlEAust, CPEng, RPEQ, NPER Senior Civil/Structural Engineer For and on behalf of TfA Project Group 123 Eumundi Road (Cnr Walter Hay Drive), Noosaville QLD 4566 Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.