Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix C - Stormwater Management Plan

Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 55, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
OilSET-1000 Oil Separator Alarm Device                                                                D15383Be
Installation and Operating Instructions


2.2     SET/DM3D probe
                              SET/DM3D probe should be installed as described in figure 3.
                              The probe gives an alarm earliest when the upper electrode is in oil
                              and latest when the probe is totally immersed in a non-conductive
                              liquid - in other words, it is totally away from the water.
                              Please check the correct installation depth also from the instructions
                              of the oil separator.

2.3     Cable joint




                               Fig. 4 Cable joint SK-3-2500

                              Connections of the probe cable inside the cable joint are explained in
                              figure 3. Cable shields and possible excess wires need to be
                              connected to the same point in galvanic contact.
                              Please make sure, that the probe and cable between OilSET-1000
                              control unit and the probe do not exceed the maximum allowed
                              electrical parameters – see chapter 7 Technical data.
                              IP rating of the cable joint is IP67. Make sure, that the cable joint is
                              closed properly.
                              If the probe cable must be extended and there is a need for
                              equipotential grounding, it should be done with the junction box LJB2.
                              The cabling between the OilSET-1000 control unit and the junction
                              box should be done with a shielded twisted pair instrument cable.




                               Fig. 5. Cable installation example        Fig. 6. Installation accessories




Copyright © 2010                                   5/10             We reserve the right for changes without notice
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.