Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix C - Stormwater Management Plan

Attached to the e-mail MCU15/0095 & REC15/0022 Development Application Stormwater Mgmt Plan (2 of 3).

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 58, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
OilSET-1000 Oil Separator Alarm Device                                                                          D15383Be
Installation and Operating Instructions


4   TROUBLE-SHOOTING

                        Problem:   MAINS LED indicator is off
              Possible reason:     Supply voltage is too low or the fuse is blown. Transformer or MAINS LED
                                   indicator is faulty.

                          To do:   1. Check if the two pole mains switch is off.
                                   2. Check the fuse.
                                   3. Measure the voltage between poles N and L1. It should be 230 VAC + 10 %.


                        Problem:   No alarm when probe in oil or air, or the alarm will not go off
              Possible reason:     The SENSITIVITY setting is wrong in the control unit (see figure 7), or probe is
                                   dirty.

                          To do:   1. Clean-up the probe and lift it up in the air or immerse it into oil.
                                   2. Turn the SENSITIVITY potentiometer slowly anticlockwise until the probe gives
                                   an alarm.
                                   3. Immerse the probe into water and wait until the alarm goes off. If the alarm does
                                   not go off, turn the potentiometer slowly clockwise until the alarm goes off.
                                   4. Lift the probe up in the air or oil. The probe should give an alarm again.


                        Problem:   FAULT LED indicator is on
              Possible reason:     Current in probe circuit too low (cable break) or too high (cable in short circuit).
                                   The probe might also be broken.

                          To do:   1. Make sure, that the probe cable has been connected correctly to the OilSET-
                                   1000 control unit. See probe specific instructions.
                                   2. Measure the voltage separately between the poles 10 and 11. The voltages
                                   should be between 10,3….11,8 V.
                                   3. If the voltage is correct, measure the probe current. Do as follows:
                                     3.1 Disconnect probe’s [+] wire from probe connector (pole 10).
                                     3.2 Measure short circuit current between [+] and [-] poles.
                                     3.3 Connect mA-meter as in figure 8.
                                           Make a comparison to the values in Table 1.
                                     3.4 Connect the wire back to the connector.


                                   If the problem can not be solved with the above instructions, please contact
                                   Labkotec Oy’s local distributor or Labkotec Oy’s service.
                                   Attention! If the probe is located in an explosive atmosphere, the multimeter must
                                   be Exi-approved!


                                                                                                  SET/DM3D, channel 1
                                                                                                  Poles 10 [+] ja 11 [-]
                                                                   Shortcircuit                   20 mA – 24 mA
                                                                   Probe in the air               9 – 10 mA
                                                                   Probe in oil (εr . 2)          9 – 10 mA
                                                                   Probe in the water             2 – 3 mA
                                                                   Factory setting for            approx. 6.5 mA
                                                                   alarm point
                   Figure 8. Probe current measurement                  Table 1. Probe currents


Copyright © 2010                                          8/10             We reserve the right for changes without notice
Log in to download the original file

Appendix C - Stormwater Management Plan.pdf · 6.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.