Skip to the record
For the highest quality transcripts.

Council archive · source document

Reference Documents Plans - MCU24 0112 · MCU24/0112

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                        •    ≥ 60 % reduction in total phosphorus load (TP)

                        •    ≥ 45 % reduction in total nitrogen load (TN)

                        •    ≥ 90 % reduction in gross pollutant load
                 Pollutants typically generated during the operational phase of the development include:

                        •    Litter/gross pollutants;

                        •    Sediment;
                        •    Nutrients (N & P);

                        •    Hydrocarbons (oils and grease); and

                        •    Heavy metals.

                 Stormwater treatment measures are shown on the attached stormwater management drawings and
                 include:
                        •    ATLAN FIL.30-EMC-M Filter system to be installed within the proposed combined treatment
                             tank within development site for final treatment of stormwater prior to discharging to the
                             stormwater network.
                 Stormwater modelling has been carried out using MUSIC modelling software to determine the required
                 infrastructure needed to meet the Water Quality Objectives (WQO’s) above.

                 4. 2       MU S IC M od el

                 MUSIC modelling for this development has been carried out using MUSIC Version 6.4 and rainfall data
                 obtained from the pluviograph tool on the eWATER website for Cooroy Composite. The developed site
                 catchment and treatment measure details included in the MUSIC model are outlined in Table 1.

                 Table 1 – MUSIC model parameters

                                         Description                                    Specification

                  Assumed road catchment to filter system                       0.0368 Ha (100% impervious)

                  Assumed roof catchment to filter system                       0.1084 Ha (100% impervious)

                  Assumed ground catchment to filter system                      0.1140 Ha (30% impervious)

                  Assumed ground catchment bypassing filter                      0.0066 Ha (19% impervious)
                  system

                  Assumed road catchment bypassing filter                       0.0008 Ha (100% impervious)
                  system

                  Assumed access path bypassing filter system                   0.0058 Ha (100% impervious)
                  and discharging from site via swale drain

                  Number of modelled ATLAN Filters                                            8

                 The MUSIC model layout is shown in Figure 2.




                                                                                                                     3
Document Set ID: 23352733
Version: 1, Version Date: 15/11/2024

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Documents Plans - MCU24 0112.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.