                                                    Figure 2 - MUSIC layout for development

                 The developed site treatment train effectiveness is outlined in Table 2.

                 Table 2 - Treatment train effectiveness.

                        Modelled Parameters              Source nodes             Residual load          % Reduction

                  Flow (ML/yr)                                3.04                     3.04                    0

                  Total Suspended Solids (kg/yr)              413                      80.2                   80.6

                  Total Phosphorus (kg/yr)                   0.894                     0.268                   70

                  Total Nitrogen (kg/yr)                      6.31                     2.79                   55.8

                  Gross Pollutants (kg/yr)                    70.7                     1.07                   98.5

                 Based on the MUSIC modelling results in Table 2 above, the proposed treatment train achieves the
                 required pollutant load reduction objectives for all pollutants. The proposed proprietary treatment
                 measures are therefore considered adequate for the development. Further review and refinement of
                 the water quality treatment measures should be undertaken at the detailed design phase.

                 4. 3   Con st ruc t io n Ph a se

                 Management of stormwater runoff during construction and the implementation of an erosion & sediment
                 control program is necessary to avoid impacts to receiving waters from pollutants typically generated
                 during the construction phase. Typical pollutants are described in Table 3 below:

                 Table 3 – Pollutants Typically Generated During the Construction Phase

                            Pollutant                                          Sources

                  Litter (Gross Pollutants)    Paper, construction packaging, food packaging, cement bags.

                  Sediment                     Unprotected exposed soils and stockpiles during earthworks and building.

                  Hydrocarbons                 Fuel and oil spills, leaks from construction equipment.

                  Toxic materials              Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.



                                                                                                                       4
Document Set ID: 23352733
Version: 1, Version Date: 15/11/2024

Used in these records

About this file

File size
5.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Documents Plans - MCU24 0112.pdf · 5.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.