Council archive · source document
20517 App L.pdf [As Published] · 132007.1259
Essence of Peregian Beach TABLE: 3.1 41 4.2 5.1 5.2 5.3 S$: Schedule of Accommodation Uses Car Parking Requirement Commercial Car Parking Requirements Considering Temporal Demands Traffic Generation David Low Way/Heron Street/hotel access: SIDRA Analysis Results David Low Way/Unnamed Access Road: Analysis Results FIGURES: Site Location and Surrounding Environs David Low Way to the North David Low Way to the South Existing Peak Hour Turning Movements 2018 Background Volumes Development Traffic Generation 2008 Development Traffic Flow 2018 Post Development Traffic Flow 2.1 2.2 2.3 2.4 5.1 5.2 5.3 5.4 APPENDICES: A B Cc D Development Plans Swept Path Assessments Recommended Modifications SIDRA Results Docu ment Control Essence of Peregian Beach Version Date Author Reviewer Name Initials Name Initials Draft RevA 01 June 2007 Original David Zohar . not signed Beth Whelan Original signed Draft RevB 25 June 2007 Original David Zohar not signed Beth Whelan Original signed Draft RevC 26 June 2007 Original David Zohar not signed Beth Whelan Original signed Final 29 June 2007 David Zohar Not signed Beth Whelan Gd. Yeu "© 2007 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of Cardno.” CE005616 290607 dz/bwits
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App L.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.