Original source · versioned page text
Meeting papers
Very large file (27.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
TRACK CHANGED DRAFT AMENDMENT COMMENTARY RE PROPOSED
No. CURRENT NP2020 PROVISION DRAFT AMENDMENTS
CHANGE
9.4.2 Earthworks Code
128 Edited
For clarity, noting that those listed are
examples only and that earthworks other
than those listed are also required to be
setback from the property boundary.
9.4.8 Water Quality and Drainage Code
129 Edited
Updated date of Act
Page 62 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.