PROJECT URBAN – 19417                                                                      24 Aug 2020

For these reasons, the subdivision layout is considered to be appropriate.

6.4 WORKS CODES


The subdivision complies with the Works Codes. Please refer to the civil and landscape plans for
details of the works proposed.

6.5 BUSHFIRE HAZARD CODE


Part of the site is mapped as being within a potential impact buffer to a high potential bushfire
intensity area. The site is connected to reticulated water supply and is provided with access to a
sealed road (Taylor Court) which leads away from the mapped hazard.

The subdivision complies with the Bushfire Hazard Code.

6.6 LANDSLIDE HAZARD CODE


Part of the site’s southern and eastern boundaries are mapped as moderate and high hazard
areas for landslide. The civil works plans illustrate that these mapped sections of the site will not
be developed for buildings or access. They will be battered and planted out as shown on the civil
and landscape plans. The subdivision is considered to be consistent with the Landslide Hazard
Code.

6.7 REGIONAL INFRASTRUCTURE OVERLAY CODE


The site is mapped as being within a Water resource catchment, a Water supply buffer area and
adjoining major electricity infrastructure.

With regards to the water catchment provisions, the proposal complies with PO1 of the code.
The subdivision will not result in adverse effects on the quality or quantity of water entering Lake
Macdonald. SEQ Water has confirmed that they have no objections to the subdivision. The lot is
adequately separated by a mapped waterway located further south.

With regards to the Council’s major electricity infrastructure mapping, this does not appear to
align with the State Planning Policy Interactive Mapping which does not identify major electrical
infrastructure in proximity to the site. Please refer to the SPP mapping extract in the figure 3.




 Figure 3: SPP Mapping showing major electricity infrastructure


Development Assessment Report                                                             Page 12 of 14
Reconfiguring a lot and Operational work
1 TAYLOR COURT, COOROY QLD 4563
Log in to download the original file

19417_Planning Report_240820.pdf · 396 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.