Ape rove — Piaf fuen any ‘4 [a Oo Wettewn ; Locked Bag 72 T 07 5475 7272 acoeg¢ Su nsh | ne Coast Sunshine Coast Mail Centre F 07 5475 7277 Regional Council Qld 4560 E [email protected] ABN 37 BIG: a7 913 W wwwsunshinecoast.qid.gov.au Officer: Mark Lewis , Direct Telephone: (07) 5449 5176 Response Address: Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Email: [email protected] Our Reference: 2009/538 Your Reference: 070143T ‘ 95 27 April 2010 Noosaville Medical and Professional Centre Pty Ltd CARE KHA Development-Managers PO Box 6380 MAROOCHYDORE BC QLD 4558 2.6 APR 2919 BY: HO Dear Sir / Madam Decision Notice Integrated Planning Act 1997 | refer to your application and advise that on 27 April 2010 Council decided to approve the application in full subject to conditions. Details of the decision are as follows: Application No: 2009/538 Street address: 90 Goodchap Street NOOSAVILLE Real property description: LOT: 4 SP: 196846, LOT: 4 SP: 196846 Planning Scheme: The Noosa Plan k i The following type of approval has been issued: e Development F Peaibalt for Operational Works - Roadworks This Seuslopiiant Permit lapses if the development has not happened by 27 April 2013 unless application to extend the relevant period is approved bys Sunshine Coast Repianel slat Ae The development shall be carted out in rasoniencar with the eomroverd dans listed bellows or as modified herein. Kerb adapters shall be used in the new kerb for the adjacent house stormwater connections. A Traffic Management Plan (TMP) for the development shall be prepared by suitably qualified persons and submitted to Council for approval prior to the pre- start meeting. The TMP shall address, but not be limited to, all items listed below. a. Asingle nominated access location to and from the site. Page 1 of 7 ‘ \ ) Caloundra Office Maroochydore Office Nambour Office * Tewantin Office 41 Omrah Avenue 11-13 Ocean Street Cnr Currie and Bury Streets 9 Pelican Street Caloundra Qld 4551 Maroochydore Qld 4558 » Nambour Qid 4560 Tewantin Qld 4565 ¥ 07 5420 8200 T 07 5475 8501 T 07 5475 8501 T 07 5449 5200 F 07 5420 8900 F 07 5441 8338 F 07 5441 8338 F 07 5447 1062
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
2009/538 10. 11. 412. The plan should detail the routing of trucks to and from the site. Provision of onsite parking for personnel working on this development, as there is limited parking available in adjacent streets. d. Provision of safe cycle and pedestrian movements in the vicinity of the development. e. No queuing of trucks is permitted on residential. streets, especially prior to 7.00am. Further parked trucks must have engines turned off. f. Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act. The total required pavement thickness shall be based on the Department of Main Roads’ Pavement Design Manual using soaked CBR tests of the subgrade. The new driveway crossovers shall be constructed in accordance with Council's Standard Drawing SEQ R-050 Rev A (Residential Driveway). Suitable root barriers shall be installed (where applicable) where trees are adjacent to paths, . pavement, etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines. Suitable sediment control devices shall be temporarily installed into the first existing external downstream stormwater structure. These devices are to be checked and cleaned on a regular basis and specifically after each rain event. These devices are to remain in place during the civil works and construction phases of the project. The location and type of device to be installed shall be established at the "pre start” meeting : with Council’s Construction Technical Officer and shall be installed prior to the commencement of any works. A site contro! and/or compliance bond of $5000 is to be submitted to Council prior to the pre- start meeting. The pre-start meeting will only be held once Council's Construction Technical Officer has confirmation that Council has received the bond monies. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting prior to the commencement of those works. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council's signed approved drawings and conditions by the applicant. The Consulting Engineers for the project shall be currently Registered Professional Engineers of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all inspections with Council's Construction Technical Officer or nominated staff. Council's Construction Technical Officer shall provide an inspection form for signing-off by the Engineer at appropriate stages of construction during on-site meetings. The Construction Technical Officer will also sign the form at each stage when requested conditions have been satisfied. The works will be accepted “On Maintenance” after this form has been signed by the Construction Technical Officer for each stage, and a letter from the Engineer has been received by Council requesting that the works go “On Maintenance”. Page 2 of 7
Page 3
20091538 13. 414. 15. 16. 17. 18. 19, 20. 21. 22. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project). Council standards shall apply to these works unless otherwise modified herein. , The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street. furniture, etc.) are protected against any damage or interference whatsoever. If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify Council's CEO and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of Council's CEO. All rectification works are to be completed prior to the commencement of the use or, alternatively, the Applicant may request Council to carry out the rectification work at the Applicant's cost, such cost being paid by the Applicant to Council prior to the commencement of the use. In the case of any emergency, Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use. The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development. All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act. Safe pedestrian access along Goodchap Street in the vicinity of the development shall be maintained at all times. If footpath / road closures are necessary to carry out construction works, Council’s Construction Technical Officer (phone 0410 512 505) must be notified prior to the proposed closure. a Prior to acceptance of civil works to become Council assets "On Maintenance”, the lodgement of satisfactory “As Constructed” records shall be submitted to Council. As Constructed drawings. and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. This information shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including, but not limited to, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As ‘Constructed (ADAC) digital format. Guidelines on the use of ADAC are available at www.adac.com.au and Council's “Noosa Planning Scheme Policy 5 —.Engineering Design Standards — Roads, Drainage and Earthworks”. Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed on construction works during the maintenance period, which is a minimum period of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for the works. These works are also to be in compliance with the relevant conditions of Development Permit No.2008/1117 and 2008/2051, both decided 17 February 2009. Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply. Page 3 of 7
Page 4
2009/538
Not applicable.
BS
i
Ls
The approved plans for this development approval, by Tod Consulting Engineers, are listed in the
following table :
=|
| Plan No. “Rev. | Plan Name < ee = as "| Date |
06679-P10 ; Es ; | Plan & Details, Alternative Access Improvement 7104/2010 |
| 06679-P11 | 7104/2010 |
\ |
A Indented Bus Stop Plan & Details
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
23. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2 Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
24. Council has undertaken an audit check of the above Operational Works drawings in relation to
the proposed works. A detailed check of calculations and drawings has not been undertaken
as they have been certified by a RPEQ. The RPEQ bears full responsibility for’all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. \t is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
oo carr esse 7
se J
Not applicable.
ree
als
The developer must comply with the following codes for self-assessab!
development approved under this Decision Notice:
le development related to the
” Page 4 of 7
Page 5
2009/538
Not applicable.
13” REASONS / GROUNDS'Fo
Not applicable.
ae RIGHTS
Integrated Planning Act 1997 is attached. :
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
[5° OTHER DETAILS:
Should you wish to obtain more information about Council's decision electronic copies are available
on line at www.sunshinecoast.qid.gov.au, or at Council Offices.
Yours faithfully
SENIOR ENGINEERING OFFICER — CIVIL ENGINEERING
~: OPERATIONAL WORKS ASSESSMENT
S Page 5 of 7
Page 6
2009/538 Regional Council ISu nshing Coast | “Appeal Rights | INTEGRATED PLANNING ACT 1997 & 1998 REGULATION | [The follo | Planning Act chapter. 4). Division 8 - .Appeals to court “relating to development applications Appeals by applicants 4.1.27.(1) An applicant for a development application may appeal to the court against any of the following- (a) the refusal, or the refusal in part, of a development application; (b) a matter stated in a development approval, including any condition applying to the development, and the identification of a code under section 3.1.6;' (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a relevant period; (e) a deemed refusal. (2) An appeal under subsection (1)(a) to (d) must be started within 20 business days (the “applicant's appeal period”) after the day the decjsion notice or negotiated decision notice is given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. Appeals by submitters 4.4.28.(1) A submitter for a development application may appeal to the court about- (a) the giving ofa development approval, including any conditions (or lack of conditions) or other provisions of the approval; or (b) the length of a relevant period for the approval. (2) The appeal must be started within 20 business days (the “submitters appeal period”) after the day the decision notice or negotiated decision notice is given to the submitter. (3) If a person withdraws a submission before the application is decided, the person may not appeal the decision. (4) If an application involves both impact assessment and code assessment, appeal rights for submitters are available only for the part of the ‘application involving impact assessment. (8) If an application is processed under section 6.1.28(2), appeal rights for submitters for the application are available only for the aspects of the development that would have required public notification under the repealed Act. * Section 3.1.6 (Preliminary approval may override local planning instrument) ».(8).1f an application involves geseesnent against a concurrence agency code, appeal rights for submitters forthe application are not available against the part of the approval that represents the concurrence agency's response for the code. Appeals by advice agency submitters 4.1.29.(1) An advice agency may, within the limits of its jurisdiction, appeal to the court about the giving of a development approval for a development application if- (a) the development application involves impact assessment, and (b) the advice agency told the applicant and the assessment manager to treat its response to the application as a submission for an appeal. (2) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. Appeals for matters arising after approval given (co-respondents) 4.1.30.(1) For a development approval given for a development application, a person to-whom any of the following notices have been given may appeal to the court against the decision in the notice- (a) a notice giving a decision on a -request for extension of the relevant period for an approval; (b) a notice giving a decision on a request to make a minor change to an approval. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Subsection (1)(a) does not apply if the approval resulted from a development application (superseded planning scheme) that was assessed as if it were an application under a superseded planning scheme. (4) Also, a person who has made a request mentioned in subsection (1) may appeal to the court against a deemed refusal of the request. (5) An appeal under subsection (4) may be started at any time after the last day the decision on the matter should have been made. Division 9 - Appeals to court about other matters Appeals for matters arising after approval given (no co-respondents) 4.1.31.(1) A person to whom any -of the following notices have been given may appeal to the court against the decision in the notice- (a) a notice giving a decision on a request to change or cancel a condition of a development approval. | Page 6 of 7
Page 7
2009/538 (b) a notice under section 6.1.44” giving a decision to change or cancel a condition of a development approval. (2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person. (3) Also, a person who has made a request mentioned in subsection (1)(a) may appeal to the _ court against a deemed refusal of the request. (4) -An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. Appeals against decisions to change approval conditions under the repealed Act 4.1.33A.(1) A person who is dissatisfied with a decision made on an application to change the conditions attached to an approval given under section 2.19(3)or section 4.4 of the repealed Act may appeal to the court against- (a) the decision; or (bp) a deemed refusal of the application. (2) An appeal under subsection (1)(a) must be started within 20 business days after the day notice of the decision is to be given to the person. (3) An appeal under subsection (1)(b) may be started at any time after the last day a decision on the matter should have been made. Appeals against local laws 4.1.33B.(1) An applicant who is dissatisfied with a decision of a local government or the conditions applied under a local law about the use of premises or the erection of a building or other structure permitted by the planning scheme may appeal to the court against the decision or the conditions applied. , ‘ (2) The appeal must be started within 20 business days after the day notice of the decision is given to the applicant. For Building Works Only Rights of appeal conferred by Section 4.2.9 of the Integrated Planning Act 1997 as follows: Division 3 - Appeals to tribunals relating to development applications : Appeals by applicants 4.2.9(1) An applicant for a development application may appeal to the Building and Development Tribunal against any of the following- (a) the refusal, or the refusal in part, of a development application: (b) a matter stated in a development approval, including any condition applying to the development, and the identification of a code under section 3.1:6;° (c) the decision to give a preliminary approval when a development permit was applied for; a. 2 Section 6.1.44 (Conditions may be changed or cancelled by assessment manager or concurrence agency in certain circumstances) * Section 3.1.6 (Preliminary approval may override local planning instrument) (d). the length of a period mentioned in section 3.5.21 relevant period; (e) a deemed refusal. (2) An appeal under subsection (1)(a) to (d) must be started within 20 business days (the “applicant’s appeal period”) after the day the decision notice or negotiated decision notice is given to the applicant. (3) An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made. The Registrar for the Building and Development Tribunal may be contacted at the website http:/iwww.localgovernment.qid.gov.aul For Infrastructure Charges Onl 4.1.36 Appeals about particular infrastructure charges % (1) This section applies to a person who has been given, and is dissatisfied with, an infrastructure charges notice or a regulated State infrastructure charges notice. (2) The person may appeal to the court against the notice. (3) The appeal must be started within 20 business days after- (a) if the notice is given because of a development approval or master plan approval-the day the applicant is given notice of the decision about the approval; or (b) otherwise-the day the notice is given to the person. (4) An appeal under this section may only be about: (a) whether a charge in the notice is so unreasonable that no reasonable relevant local government, State infrastructure provider or coordinating agency could have imposed it; or (b) an error in the calculation of the charge. (6) Toremove any doubt, it is declared that an appeal under this section can not be about the methodology used to establish the charge in the relevant infrastructure charges schedule or regulated State infrastructure charges schedule. Page 7 of 7
Page 8
Aypleaa +
LEB.
Sunshine Coast Regiona! Council
Under no circumstances may the Pian & Specifications be departed
aa
£ 3
S s
= 3
a 3
3 3 a9 sagan,
& Ss wl EARTHWORES APPROVED BY THE EXGREER AND
S s > Eo (ORPACTED TO 8K 95% POD FOR FLL PLACED
3 5 0 Bega” EXISTING U/G TELSTRA SERVICE TO MATE 30m OF LEVEL ABD 97% RED FOR
€ 2 & PIT TO REMAIN, LIDS NOT TH Han LO TH I SU
= 3 EXISTING TELSTRA PIT TOBE
é 2 ‘STRENGTHENED AND PROVIDED es
£ = & WITH ACONCRETE INFILL LID, {TOPSOL 1S TO BE REMOVED, STOOOLED, AND
z Eo 3g ‘SUITABLE FOR LOAD GLASSC TO ELSE) TO COVER ALL ISTURDED EARTIAORS
= = Zz 8 | ae 0 COMPACIED QRPTH CF Sem. AND
3 —e § gé@ 5 LAYOUT PLAN 41800 HORIZ CONTRACTOR - SERVICESTREAM _
g = sf 8 ee (CONTACT Mr BOB TANNER tate
a fac 2a (ad atdetadateniadnsnd ¢ ALL PAYENENT WORK TO BE CARRED OT
LEFT AND RIGHT HAND TURNS Ph owe e63 669) ALCTROANCE VT QUERSLARD TRANSPORT
INAND LEFT TURN ONLY OUT (UHREDUCED AT At) ‘TQAICAL SPECRRATION WOS, 1424, 1.45 AND
ME ‘OF CAR PARK ACCESS: fe.
W.wous auc 70 wo ona Te] © SECTION X-X
ll fae San
tm a | i SATE (A, a ac Wa To
LE {EXSTING ASPHALIIC CONCETE | NEW COMPETE ROSSNG f
I {EGE 5 WoT TO SCALE Lae irae ‘ate TR. NATCH BASTING KERB LET
Beers inte) Ho SL $id fae fe
ACCORDANCE WTH THE CORRENT MANIA re Nese GOODCHAP STREET
* UNFORE TRAFFC CONTROL OEYKES - SECTON 4.0 _
i es AACE 10 4 OF LINE MARKING LEGEND = i
da peony fia fa ore —— L ad
1 Cal Sam A, claghe Es =
3158) Gory. [email protected] NOTES; : 0.200 wl \ ear 7
i) | ams ee af Bae (ait =
4 ‘DENOTES ENSTING LEVEL sv # PROVIDE 120 x $00 LONG
| samara | OM cenores FRED SURFACE LEVEL mene mw: ml ome ran PER: REG Ru area te
ve,
DETAIL PLAN EE SSne ad Seen aienor, tug IEil SECTIONY-¥ a
ia La setateiiond cee OMAN
[Segue || OPERATIONAL WORKS SUBMISSION cana TODCONSULTING _ , ,2veysie noone
[== ~ || GOODCHAP STREET NOOSAVILLE PLAN AND DETAIS cNGNecRS 40 Enea
4 [email protected]:
[=== || ALTERNATIVE ACCESS IMPROVEMENT FOR issue 2 OT
Sate mene F | 1449] BUS STOP eeseT : > a woe DHepcott |
Saoun tan” |ELECTRIGAL ENGINEER
ili a STRUCTURAL CNL Fa eral aan}
SSkzis"|| FOR NC OLIVER GROUP OF COMPANIES { do weovommaein oe o_o
fess ‘A {18-3-09] COUNGL GP-WORKS SUBRESSHON | "ABN. 96 128 006 290 "06879 P10 7
co 2 es [=a
Page 9
BG SRE LOCATIONS, SHOWN TE PLAN
| B6o. ass Acoma STD Oe RH
‘AE 0 BF RSTALID (AEE AL KE ND CUNELRS
(FH 100 QUEL AER OR TENE AT WO Ta
HA CNET HEAL, 180 APM VO
ROTPATHS ARE TOBE TRFED ATH AB HORS
LAYOUT PLAN
EARTHWORKS NOTES:
1, CABARALL VEGETATION FROM THOSE AREAS TO #4 IXCAVATED OR FLED. AL ALABIGH INCLLOINO DERRLG FROM CLEARING
18 TO Ba CHEPOED WY ACCORD ANCE V/TH Ths BTARDARDS OF THE LOCAL ALTHORITY, BURWING WLNOT9E ALLOWED.
2. AAGRGNUC MATERIA, TOPSOL. AND UNSUITABLE GUBGRADET ARE TO BMETRIPPED PROM THE AREATOBE FLED AKO
TO THE PLACEMENT OF THE NEXT LAYER. TH2 TOP Sime OF THE ROAD SUBGRACE 8 TO BE COMPACTED TO A MMU OF
To Mt Son OF UL AS 97 ED aR
‘THEGENERAL FL MATERIAL. THE MATERA 99 RENOVED MAY, IT OTHERNSE MBETBTHS SPEGICATIN, BEUSROAS
‘AND PLACED AB BPECPIED ABOVE.
{1 ALLWORK/ 70 BB CARUED OUT ACCORDANCE WITHTHE 208
PES <600em AND CLASS FOR LARGER PPUS IM A NOL CLASS EF
Ji, MME CONTPACTOR WTO PREURITT UR THE JEQFOR, —BaDOANO. ALL PPES AME TOE RURBER RNG JONTED.THETYPE OF
WEN DIMECTED 5¢ THOLENGDNREA VETH ALL PEPER,
2 BUSTING SERVICSLOCAMONSIF cHOMMONT:S -«~ROADSAND ALLOTMENTS REE OF RUDBNOMOR BRT AND
(Griaurevey 000 SOME ELEMEDCI OF THE BURVEY DATA
‘PRSLINTEREOLATED AND MAY VARY FROM THEACTUAL,
e- OBIDTES TOP OF KERB LEVEL { ORBAL }
BUS STOP DETAIL PLAN panes
Ba: || OPERATIONAL WORKS SUBMISSION
.. || GUODCHAP STREET NOD
#255. || ALTERNATIVE ACCESS IMPROVEMENT FOR
FOR NC OLIVER GROUP OF
‘Ne TE
INDENTED BUS STOP
PLAN AND DETAILS
Used in these records
Attachment 2 - Goodchap Street Operational Works.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.