The plan should detail the routing of trucks to and from the site.

Provision of onsite parking for personnel working on this development, as there is limited
parking available in adjacent streets.

d. Provision of safe cycle and pedestrian movements in the vicinity of the development.

e. No queuing of trucks is permitted on residential. streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.

f. Provision of signage and traffic controllers in accordance with Manual of Uniform Traffic
Control Devices and the Transport Infrastructure (Roads) Act.

The total required pavement thickness shall be based on the Department of Main Roads’
Pavement Design Manual using soaked CBR tests of the subgrade.

The new driveway crossovers shall be constructed in accordance with Council's Standard
Drawing SEQ R-050 Rev A (Residential Driveway).

Suitable root barriers shall be installed (where applicable) where trees are adjacent to paths, .
pavement, etc; in accordance with Council’s Planning Scheme Policy PSP03 Landscaping
Plants and Guidelines.

Suitable sediment control devices shall be temporarily installed into the first existing external
downstream stormwater structure.

These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.

These devices are to remain in place during the civil works and construction phases of the
project.

The location and type of device to be installed shall be established at the "pre start” meeting :
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.

A site contro! and/or compliance bond of $5000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Technical Officer has confirmation that Council has received the bond monies.

The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.

Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7)
days’ notice of intention to commence works to arrange a “pre start” meeting prior to
the commencement of those works.

The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability documentation.

Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council's signed approved drawings and conditions by the applicant.

The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council's Construction Technical Officer or nominated staff. Council's
Construction Technical Officer shall provide an inspection form for signing-off by the Engineer
at appropriate stages of construction during on-site meetings. The Construction Technical
Officer will also sign the form at each stage when requested conditions have been satisfied.
The works will be accepted “On Maintenance” after this form has been signed by the
Construction Technical Officer for each stage, and a letter from the Engineer has been
received by Council requesting that the works go “On Maintenance”.

Page 2 of 7

Used in these records

About this file

File size
5.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 2 - Goodchap Street Operational Works.pdf · 5.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.