Attachment 2 - Goodchap Street Operational Works · 132007.12.8
Attached to the e-mail 132007.12.8 - Response to Information Request.
20091538 13. 414. 15. 16. 17. 18. 19, 20. 21. 22. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project). Council standards shall apply to these works unless otherwise modified herein. , The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street. furniture, etc.) are protected against any damage or interference whatsoever. If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify Council's CEO and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of Council's CEO. All rectification works are to be completed prior to the commencement of the use or, alternatively, the Applicant may request Council to carry out the rectification work at the Applicant's cost, such cost being paid by the Applicant to Council prior to the commencement of the use. In the case of any emergency, Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use. The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development. All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act. Safe pedestrian access along Goodchap Street in the vicinity of the development shall be maintained at all times. If footpath / road closures are necessary to carry out construction works, Council’s Construction Technical Officer (phone 0410 512 505) must be notified prior to the proposed closure. a Prior to acceptance of civil works to become Council assets "On Maintenance”, the lodgement of satisfactory “As Constructed” records shall be submitted to Council. As Constructed drawings. and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. This information shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including, but not limited to, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As ‘Constructed (ADAC) digital format. Guidelines on the use of ADAC are available at www.adac.com.au and Council's “Noosa Planning Scheme Policy 5 —.Engineering Design Standards — Roads, Drainage and Earthworks”. Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed on construction works during the maintenance period, which is a minimum period of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for the works. These works are also to be in compliance with the relevant conditions of Development Permit No.2008/1117 and 2008/2051, both decided 17 February 2009. Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply. Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Goodchap Street Operational Works.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.