Original source · versioned page text
Traffic Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
TRAFFIC GUIDANCE SCHEME/S (TGS) COVER SHEETS – 31 BOTTLEBRUSH AVE – NOOSA HEADS GENERAL INFORMATION, NOTES AND TRAFFIC MANAGEMENT CONSIDERATIONS CLIENT: COLE PROJECTS PROJECT DESCRIPTION: RESIDENTIAL CONSTRUCTION CLIENT CONTACT: CAMERON COLE WORKS LOCATION: 31 BOTTLEBRUSH AVE – NOOSA HEADS POSITION: PROJECT MANAGER NEAREST SIDE STREETS: BERRIMA ROW TRAFFIC MANAGEMENT DESIGNER: CLIENT CONTACT PHONE: 0407 593 956 ROAD CONFIGURATION: TWO WAY GUY HALLIDAY – TMD CERT. # OP-259 SITE CONTACT: STEVE COLE ORIGINAL POSTED SPEED: 50Km/H TRAFFIC MANAGEMENT & PLANNING SITE CONTACT PHONE: 0412 552 971 WORKSITE SPEED: 50KM/H DESIGN DATE: 31/05/2021 NOMINATED TRAFFIC CONTROL CO: TBA PROPOSED START DATE: TBA REVISION: ORIGINAL DOCUMENT NOMINATED TRAFFIC OFFICER: TBA DURATION OF WORKS 8 MONTHS MUTCD: PART 3 – NINTH ISSUE, 2019 N.T.O CONTACT PHONE: TBA TGS DIAGRAMS COVERED: CP-BOTT-TGS1, 1A, 2 CLAUSE 1.5 – MUTCD – RESPONSIBILITY FOR SAFETY AT WORK SITES: Organisations and individuals responsible for works in accordance with this Part of the Manual need to be aware of their responsibilities for any injury to road users or damage to property as a result of such operations. There is an equally important obligation to provide a safe workplace environment that minimises, as far as practicable, the likelihood of injury to workers by traffic within or adjacent to the work area. Principals and contractors need to be aware of the requirements of OHS legislation and implement them as they apply to this obligation. Supervisory personnel carrying out construction, maintenance or other works that require the use of a Traffic Guidance Scheme shall give attention to the following: a) Be mindful of their responsibility to provide, as far as practicable, a safe workplace for personnel and plant under their control, and safe and convenient travelling conditions for road users. b) Ensure that personnel under their control are, at all times, courteous to road users. Personnel should not allow themselves to become distracted by provocation from members of the public. c) Ensure that personnel are competent to perform the roadwork signing task (See Clause 1.4.3). d) Ensure that all personnel at a work site are aware of their responsibilities. e) Ensure that Traffic Controllers are appropriately trained and informed of their duties and that they are regularly relieved from their duty (see Clause 4.10.5). f) Be familiar with, and act, as far as is practicable, in accordance with the provisions of this Part of the Manual. SITE LOCATION OVERVIEW MAP • Setting out and recovery of devices Existing signs and traffic control devices which are inappropriate to, or conflict with, the temporary worksite situation shall be fully covered or removed. Before work commences, signs and devices at the approaches to and within the work area should be set out in accordance with the traffic guidance scheme in the following sequence: (a) Advance warning and regulatory signs (including temporary speed zone signs). (b) All intermediate advance warning and regulatory signs and devices required in advance of the taper or start of the work area. (c) All delineating devices required to form the taper including the illuminated flashing arrow sign at the end of the taper where required. (d) Delineation of the work area or side-track. (e) All other required warning and regulatory signs including termination and end of temporary speed zone signs. • Defining and protecting the work area The travelled path on the approaches and past the work area shall be delineated so as to properly define which part of the roadway is available to road users, or the path that traffic is required to follow, under all reasonably expected weather and atmospheric conditions, day or night as applicable. TGS OVERVIEW The objective of this document is to provide the client, subcontractors and Traffic Delineating devices (e.g. traffic cones, bollards, post mounted delineators) should Management personnel carrying out works at this location with a specified generally be placed 1 m clear of the travelled path where practicable. However, arrangement for the signing and delineation of construction and maintenance works traffic cones and bollards may also be used to define the edge of the travelled path which will promote the safety of both workers and the public at the work site. or to separate opposing traffic. This Traffic Guidance Scheme has been developed based on the brief of information In addition to providing adequate traffic control and guidance at a static work site provided by the client, as well as a risk assessment of the location and its observed the safety of road users will be enhanced by ensuring that the work site is and/or interpreted risks and associated hazards. The TGS diagram/s detail the traffic managed in such a way as to cause the minimum amount of inconvenience to control signs, devices and control measures to be applied at the relevant work sites traffic movement. Works in order to warn traffic and guide it through, past or around the work area. should be arranged to minimise - (i) disruption of established traffic movements and patterns; The purpose of this Traffic Guidance Scheme is to ensure the safety of all workers (ii) interference with traffic at peak movement periods; within the work site, as well as the general public. (iii) interference with public transport services; and (iv) the amount of road closed to traffic at any one time. GENERAL TRAFFIC MANAGEMENT PRINCIPLES • A TMR certified Traffic Management Implementation (TMI) Officer must implement • Risk management (or directly supervise the implementation of) the TGS. Approval for erection or Risk management entails the identification and analysis of all safety risks likely to removal of regulatory traffic control devices shall be obtained from the Department arise during works on road including the setting up, operating, changing and of Transport and Main Roads or appropriate road authorities before implementing ultimate dismantling of a Traffic Guidance Scheme, followed by the determination this Traffic Guidance Scheme. of appropriate measures to mitigate those risks. The process is appropriate at all levels of planning and operation. In each case the process should be carried out • Risk management - Risk management entails the identification and analysis of all by first identifying all the hazards likely to arise, evaluating them in terms of safety risks likely to arise during works on road including the setting up, operating, likelihood of occurrence and adverse consequences using historical data, changing and ultimate dismantling of a Traffic Guidance Scheme, followed by the experience or other means. The proposed procedural statement or Traffic determination of appropriate measures to mitigate those risks. The process is Guidance Scheme should then be checked in detail to ensure that adequate appropriate at all levels of planning and operation. In each case the process means of controlling or reducing those risks found to be significant, are in place. should be carried out by first identifying all the hazards likely to arise, evaluating them in terms of likelihood of occurrence and adverse consequences using • Traffic Controllers historical data, experience or other means. The proposed Traffic Guidance The regulation provides that the function of a traffic controller is to direct traffic in a Scheme should then be checked in detail to ensure that adequate means of way stated in the MUTCD and the TCASAP. controlling or reducing those risks found to be significant, are in place. Traffic controllers shall be relieved from their duty after not more than 2 hours for a • Positioning of devices period of rest or “other duties” of at least 15 minutes. [NOTE: “Other duties” does Signs and devices should be positioned and erected so that– not include operation of a STOP/SLOW bat to control traffic or any duties involving a) they are properly displayed and securely mounted (see Clause 3.3 - MUTCD); standing in one position or controlling traffic with a traffic control device]. b) they are within the line of sight of the intended road user; c) they cannot be obscured from view (for example, by vegetation or parked cars); Approach speeds to locations where Traffic Controllers are operating shall be d) they do not obscure other devices from the line of sight of the intended road controlled to 60 km/h or less by means of appropriate devices and advance signs user; including a temporary speed zone. e) they do not become a possible hazard to workers, pedestrians, or vehicles; f) they do not deflect traffic into an undesirable path; Traffic controllers must ensure that they have a clear escape path to a non-traffic g) they do not restrict sight distance for drivers entering from side roads or streets, (closed) section of the roadway, shoulder, footpath or median. Traffic controllers or private driveways; and must stand facing the traffic but just outside the projected travel path. A traffic h) they are not installed using supports that could be a hazard if struck by a controller must ensure that they are not partially hidden by signs and/or devices vehicle. and they do not obstruct a driver's view of such signs and/or devices. Traffic controllers shall also be provided, if necessary, to control the movement of plant and / or pedestrians through, past or within the trafficable area. 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Traffic Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.