Effluent Disposal
31. Deleted.
Water Supply Headworks
32. A contribution shall be paid to Council in accordance with Planning Scheme Policy PSP 28 Water Supply
Headworks Contributions at the rates applicable at the time of payment. An estimate only of the
contribution rate as at March 2002 under the current policy is as follows:
Water Supply $ 8,646
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Sewerage Contribution
33. A contribution shall be paid to Council for the future use of Council’s sewerage reticulation system that is
currently being designed for this area and is programmed for construction in the 2003/2004 financial year.
An estimate only of the contribution rate as at March 2002 is as follows:
Sewerage $ 12,755
This contribution must be paid prior to the issue of a Development Permit for Operational Works.
Sediment and Erosion Controls
34. To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with any
Development Permit for Operational Works. Site control measures such as silt fencing, controlled gravel
access to the site and controlled disposal of waste, may be necessary. Prior to commencement of any
works on site, all physical site control measures shall be installed, and approved plan adhered to.
General
35. Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.
36. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works and a Development Permit for Operational Works shall be
obtained prior to the commencement of any works.
37. For the following classes of work associated with development, a Development Permit for Operational
Works must be obtained prior to commencement of works relating to that class of work. The application
may combine any or all of these classes of work:-
a. Access and/or carparking
b. Roadworks
c. Stormwater Drainage
d. Frontage works
e. Effluent Disposal
f. Sediment and Erosion Controls
g. Landscaping
38. The person acting on this permit shall apply and obtain all other necessary permits including crane, road
opening, hoarding, footpath occupation and/or any other approvals required under any other Act or By-
Law.
39. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
H o:\database\onestop\decision.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015A7FC.001.pdfRelated documentPublic source context ↗
20789 DA Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.