Original source · versioned page text
2022-02-14 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 14 FEBRUARY 2022
Water quality
39. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must include in particular:
a. Water quality treatment features that achieve the following pollutant reduction
targets as measured by a MUSIC model developed in accordance with the Water
by Design MUSIC modelling guidelines;
b. the use of gravity stormwater drainage and not surcharge pits;
c. A stormwater quality treatment system must be provided for the development
that achieved 80% reduction in Total Suspended Solids, 60% reduction in Total
Phosphorous, 45% reduction in Total Nitrogen compared to an unmitigated
scenario. The works must be undertaken in accordance with an Operational
Works approval and the Water by Design Guidelines.
40. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
copy of this document must be retained on the site together with the approved
Operational Works drawings for the stormwater quality treatment system and a detailed
life cycle costing of the system attached as an addendum. Records of all maintenance
activities undertaken must be kept and made available to Council upon request.
41. Any proposed Community Management Statement required for the development must
include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
(Version 1) document and must include the full cost of maintaining the system in
accordance with that document.
42. Operating rainwater collection and stormwater harvesting tanks must be provided as
shown identified in section 6.2 of the Engineering Report & Stormwater Management
Plan report For Proposed Residential and Commercial Tenancies at 30-32 Doonella St
(A6035/21/ENG/RevB). The tanks must be provided in accordance with an Operational
Works approval.
43. Certification must be submitted to Council from a qualified person* which certifies that
the rainwater collection tank/s and associated reticulation has/have been installed in
accordance with the requirements of this Decision Notice.
*(Refer to Advisory Note)
Acid Sulfate Soils
44. All waters, including stormwater runoff, groundwater seepage and leachate must
achieve the following quality prior to release from the site at all times:
a. a pH range of 6.5-8.5 pH units;
b. 50mg/L maximum total suspended solids concentration;
c. 0.3mg/L maximum total iron concentration;
d. 0.2mg/L maximum total aluminium concentration; and
e. no visible plume at either the point of release from the site or within a waterway.
ENVIRONMENTAL HEALTH
Waste Storage
45. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including an external imperviously
paved area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties.
Page 15 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.