GENERAL COMMITTEE MEETING MINUTES                                           14 FEBRUARY 2022


    Landscaping
    87.   The development site must be landscaped. The works must be undertaken in
          accordance Noosa Plan PSP 2 – Landscaping and generally in accordance with the
          approved Landscaping Plans and in particular:
          a.   The along the south side of the easement must include native species that
               effectively screen the development and grow to a minimum mature height of 8m.
          b.   Plantings along the eastern side of the bio basin must grow to a minimum height
               of 4m and provide screening to the car parking area.
          c.   The proposed 25 litre pot size feature trees within the front setback (facing
               Doonella Street) must be replaced with 45 litre pot size plants
          d.   The existing street trees in the road reserve may be removed. If removed they
               must be replaced with 4 x ex-ground Delonix regia (Poinciana’s) 400L trees as
               shown on the approved landscape plans.
    88.   The finished level of all mulch in garden beds and landscaped medians is to be a
          minimum of 50mm below the level of the adjacent top of kerb. All landscaping is to be
          constructed in accordance with Council’s Planning Scheme Policy PSP2 Landscaping.
    89.   Suitable root barriers must be installed where proposed trees are adjacent to paths,
          pavement etc in accordance with Council’s Planning Scheme Policy PSP2
          Landscaping.
    Damage to Services and Assets
    90.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.   where the damage would cause a hazard to pedestrian or vehicle safety,
               immediately; or
          a.   where otherwise, upon completion of the works associated with the development.
    Any repair work which proposes to alter the alignment or level of existing services and assets
    must first be referred to the relevant service authority for approval.
    Erosion & Sediment Control - Works adjacent to High Ecological Significance Water
    91.   Prior to the requesting the pre-start meeting the applicant must engage a Certified
          Professional and Erosion Control to prepare and provide to Council scheduling plans
          for the development which demonstrate that construction can be undertaken in a
          manner consistent with Accepted best practice standards and all relevant conditions of
          this approval. * (Refer to Advisory Note).
    92.   The applicant must engage a CPESC, or other suitably trained professional, (i.e. who
          has completed the CPESC training, and has a minimum of 5 years site experience
          supervising Erosion and Sediment Control management) to undertake weekly site
          visits to inspect and certify whether or not required Erosion and Sediment controls are
          properly installed and maintained to achieve the requirements on this approval.
    93.   Construction must be managed such that less than 2,500m2 of soil is exposed at any
          time.
    94.   Exposed soil is only permitted between the months of May to October, and all
          catchments with these soils must drain to sediment treatment features to achieve
          50mg/L TSS prior to release of waters from the site. Outside these months the site
          must achieve a C factor of 0.05 at all times.
    95.   A construction hold point with a council delegate and supervising RPEQ must be
          established prior to commencement of cut to fill earthworks for each stage of the
          development. The hold point must be held as soon as reasonably practical and prior to

                                                                                   Page 22 of 26
Log in to download the original file

2022-02-14 General Committee Meeting Minutes(PDF, 373KB).pdf · 382 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.