29. All waters, including stormwater runoff, groundwater seepage and leachate from acid sulfate
soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a waterway
30. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 “Concrete Structures for Retaining Liquids” to
ensure groundwater does not enter the basement after construction is completed.
31. All treated material must undergo verification testing at the rate of one sample per 250 m3
throughout the duration of the excavation phase of the development. The verification testing
must be undertaken by a qualified person* using the SPOCAS or Chromium Reducible
Sulphur testing suite, and the results must be submitted to Council for appraisal.
Damage to Services and Assets
32. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Landscaping Works
33. The development site must be landscaped. The works must be undertaken in accordance
with the PSP 2 - Landscape and the Noosa Plan 2020 for that specific area and must include
in particular:
a. the works shown on the Approved Plans
b. vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage
34. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Retention of Existing Trees
35. Existing trees in the road reserve must be retained in accordance with an Arborist Report (or
part thereof) prepared by a qualified person* and endorsed through an Operational Works
approval.
*(Refer to Advisory Note)
36. All planting areas on the eaves must be planted and maintained at all times, with replacement
planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
Waste Management
37. A waste storage area must be designed and maintained in accordance with Planning
Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
The waste storage area must be:
a. imperviously paved and correctly sized for all refuse and recycling containers;
Page 6 of 21
Document Set ID: 24062787
Version: 1, Version Date: 27/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Planning Report Conditions - Approval (As Publihed)Related documentApplication case desk ↗
Delegated Planning Report Conditions - Approval (As Publihed).pdfRelated documentApplication case desk ↗
About this file
- File size
- 184 KB (small file)
- File type
No other editions are linked here.