                 Fauna Management Plan
                 3-7 Serenity Close, Noosa Heads



                 TABLE 7: POST-CONSTRUCTION ACTIVITIES.


                  Action               Task                                               Responsibility   Timing

                  Remove               1)   Temporary fauna exclusion fences should be    Site Manager     After
                  temporary                 removed and appropriately disposed once                        construction
                  fauna                     construction is complete.                                      activities
                  exclusion            2) Any excavation associated with temporary
                  fences                  fauna exclusion should be backfilled to
                                          prevent ay fauna becoming trapped or
                                          injured.
                  Remove               1)   All construction signage is to be removed     Site Manager     After
                  construction              from the site at the end of construction                       construction
                  signage                   activities.                                                    activities
                  Ensure that no       1)   All material susceptible to cause physical    Site Manager     After
                  material that             harm to wildlife must be removed                               construction
                  could cause               immediately after use.                                         activities
                  potential harm       2) No toxic waste is to be stored on site at the
                  to wildlife has         end of the construction period.
                  been left on         3) All waste is to be managed responsibly and
                  site                    sustainably to the maximum practicable
                                          extent throughout the construction period.




                                                                                                                31 | 35

Document Set ID: 23516334
Version: 1, Version Date: 30/01/2025

Used in these records

About this file

File size
18.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document Fauna Management Plan Rev 1 0 OPW25-0012.pdf · 18.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.