19553-C1000_[B]-DG-CLC_[B] Civil Engineering Drawings

Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                                                                                                            GENERAL NOTES                                                                                                                     TOPSOIL:                                                                                                                                     EXISTING PAVEMENT:
                                                                                                                            1.    DO NOT SCALE DRAWINGS.                                                                                                       9.    PRIOR TO ANY EARTHWORKS ACTIVITIES, TREE STUMPS, BUILDING DEBRIS, ORGANIC RICH TOPSOIL AND SEVERELY                                   1.    WHERE PAVEMENT WIDENING IS PROPOSED, THE EXISTING PAVEMENT IS TO BE SAW CUT TO FORM THE JOINT, AS PER
                                                                                                                            2.    ALL DISCREPANCIES SHALL BE REFERRED TO THE SUPERINTENDENT FOR CLARIFICATION BEFORE PROCEEDING.                                     ROOT AFFECTED AREAS MUST BE REMOVED.                                                                                                        STANDARD DRAWING IPWEAQ RS-170. THE DEPTH OF THE EXISTING PAVEMENT IS TO BE CONFIRMED AS PART OF THIS
                                                                                                                                                                                                                                                               10.   ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                                          PROCEDURE.
                                                                                                                            3.    THE CONTRACTOR SHALL NOTIFY THE SUPERINTENDENT IN WRITING OF ALL VARIATIONS ARISING FROM THE
                                                                                                                                  CLARIFICATION OF THE DISCREPANCY.                                                                                                  DISPOSED OF. TOPSOIL STOCKPILES SHALL NOT EXCEED 2m IN HEIGHT.                                                                        2.    ALL EXISTING PAVEMENT SURFACES ARE TO BE SWEPT CLEAN OF ALL LOOSE DEBRIS/FOREIGN MATTER PRIOR TO
                                                                                                                                                                                                                                                                                                                                                                                                                 APPLICATION OF SEAL.
                                                                                                                            4.    THE CONTRACTOR SHALL SUBMIT DETAILS OF ANY ADDITIONAL COST ARISING FROM A VARIATION TO THE
                                                                                                                                  SUPERINTENDENT FOR APPROVAL, BEFORE PROCEEDING WITH THE WORKS.                                                              SUBSOILS:                                                                                                                                    3.    AREAS OF EXISTING PAVEMENT CONTAINING POTHOLES, TO BE SAW CUT AND REPLACED WITH DEEP LIFT ASPHALT
                                                                                                                                                                                                                                                                                                                                                                                                                 WITH A MINIMUM THICKNESS OF 100mm.
                                                                                                                            5.    ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT                            11.   ENSURE SUITABLE GROUND COVER IS PROVIDED TO ALL EXPOSED SUBSOILS AS SOON AS PRACTICAL, TO MINIMISE
                                                                                                                                  AUSTRALIAN STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY                                  THE RISK OF SOIL EROSION, ESPECIALLY IF THE SOILS ARE DISPERSIVE.                                                                     4.    IF UNDERLYING GRAVEL IS EXPOSED DURING MILLING OPERATIONS A PRIMER SEAL SHALL BE PLACED OVER THE
                                                                                                                                  AND THE SUPERINTENDENT.                                                                                                                                                                                                                                                         AFFECTED AREA.

                                                                                                                            6.    NO WORK IS TO COMMENCE ON SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED IN WRITING AND AN                        SUBGRADES:
                                                                                                                                  OFFICIAL PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL AND THE ENGINEER HAVE BEEN HELD. THE                                                                                                                                                                         SIGNS AND LINEMARKING
                                                                                                                                  CONTRACTOR IS TO OBTAIN A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH THE                             12.   SUBGRADES IN PAVEMENT AREAS SHALL BE PROOF ROLLED USING A MINIMUM 10T FLAT DRUM ROLLER AND ANY SOFT
                                                                                                                                                                                                                                                                     SPOTS OR UNSUITABLE MATERIALS SHALL BE EXCAVATED AND REPLACED WITH SELECT FILL.                                                       1.    ALL ROAD SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL
                                                                                                                                  REQUIREMENTS THEREOF.                                                                                                                                                                                                                                                          DEVICES (MUTCD), PUBLISHED BY THE DEPARTMENT OF MAIN ROADS.
                                                                                                                            7.    ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT WORK PLACE HEALTH AND SAFETY LEGISLATION.                                    13.   SUBGRADE TESTS SHALL BE UNDERTAKEN AND RESULTS SUPPLIED TO THE ENGINEER, TO DETERMINE THE
                                                                                                                                                                                                                                                                     ADEQUACY OF THE PAVEMENT DEPTH DETAILED ON THE DRAWINGS.                                                                              2.    ALL SIGNS SHALL BE SIZE 'A' UNLESS NOTED OTHERWISE.
                                                                                                                            8.    A MINIMUM OF 24 HOURS NOTICE IS REQUIRED FOR ALL ENGINEERING INSPECTIONS, WHERE POSSIBLE.                                                                                                                                                                                3.    SIGNS LOCATED WITHIN MEDIANS OR TRAFFIC ISLANDS TO BE INSTALLED USING LOC SOCKET.
                                                                                                                                                                                                                                                               14.   THE SUBGRADE IS TO BE INSPECTED BY THE SUPERINTENDENT BY MEANS OF A PROOF ROLL, BY A LOADED WATER
                                                                                                                            9.    THE WORK AREA WILL BE MINIMISED TO FACILITATE CONSTRUCTION WHILST ENABLING CONTINUAL OPERATIONS OF                                 CART, PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. THE SUBGRADE SHALL EXHIBIT NO VISIBLE SIGNS OF                                       4.    ALL SIGN FOOTINGS TO BE CONCRETE IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ RS-130.
                                                                                                                                  THE NEIGHBOURING AREA, TO THE SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                    DEFORMATION UNDER PROOF-ROLLING.                                                                                                      5.    ALL ROAD SIGNS TO BE OFFSET A MINIMUM OF 600mm FROM FACE OF KERB.
                                                                                                                            10.   WORKING HOURS, COMMUNICATIONS PROTOCOLS, SITE ACCESS, AREA FOR CONTRACTORS FACILITIES/STORAGE AND                            15.   THE SUPERINTENDENT MAY REQUEST ADDITIONAL SUBGRADE TESTING OR SUBGRADE REPLACEMENT FOLLOWING
                                                                                                                                  SITE SECURITY TO BE AGREED WITH THE PRINCIPAL AND SUPERINTENDENT.                                                                                                                                                                                                        6.     THE FINAL SIGN LOCATION IS TO BE AGREED ON SITE, TO ENSURE IT IS VISIBLE AND NOT OBSTRUCTED BY EXISTING
                                                                                                                                                                                                                                                                     THIS INSPECTION.                                                                                                                            INFRASTRUCTURE OR VEGETATION ETC.
                                                                                                                            11.   THE FOLLOWING HOLD POINT INSPECTIONS WILL BE REQUIRED;
                                                                                                                                                                                                                                                                                                                                                                                                           7.    ALL SIGNS SHALL BE MANUFACTURED, AND INSTALLED IN ACCORDANCE WITH MRTS14.
                                                                                                                                  ● CONSTRUCTION PRE-START MEETING                                                                                            STOCKPILE MANAGEMENT:
                                                                                                                                  ● SET OUT                                                                                                                    16.   CONTRACTOR TO ENSURE STOCKPILES ARE NOT LOCATED IN A POSITION WHERE THEY COULD BE WASHED INTO A                                       STORMWATER DRAINAGE
                                                                                                                                  ● DEMOLITION                                                                                                                       GUTTER, DRAIN OR WATER BODY, SUCH AS:
                                                                                                                                                                                                                                                                                                                                                                                                           GENERAL
                                                                                                                                  ● SUBGRADE PROOF-ROLLS                                                                                                             ● ON A ROAD PAVEMENT;
                                                                                                                                                                                                                                                                                                                                                                                                           1.    EXCAVATION, BEDDING AND BACKFILLING OF STORMWATER DRAINAGE PIPES TO BE IN ACCORDANCE WITH STANDARD
                                                                                                                                  ● PRE-SEAL PROOF-ROLLS                                                                                                             ● WITHIN AN OVERLAND FLOW PATH;                                                                                                             DRAWING IPWEAQ DS-0030 (TYPE 2).
                                                                                                                                  ● CONCRETE PRE-POURS                                                                                                               ● ADJACENT TO STREAM BANKS.                                                                                                           2.    ALL MANHOLES TO BE 1050mm DIAMETER IN ACCORDANCE WITH STANDARD DRAWING IPWEAQ DS-010.
                                                                                                                                  ● FINAL INSPECTION                                                                                                           17.   CONTRACTOR TO ENSURE STOCKPILES ARE COVERED WITH A TARP OR OTHER IMPERVIOUS COVER. LONG TERM                                          3.    ALL MANHOLE COVERS LOCATED WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS D IN ACCORDANCE WITH
                                                                                                                            12.   THE CONTRACTOR SHALL PROVIDE ALL MANAGEMENT PLANS, INCLUDING TRAFFIC MANAGEMENT PLAN,                                              STOCKPILES CAN BE COVERED WITH MULCH OR TEMPORARY VEGETATION (GRASS).                                                                       STANDARD DRAWING IPWEAQ DS-019.
                                                                                                                                  ENVIRONMENTAL MANAGEMENT PLAN AND WORK PLACE HEALTH AND SAFETY PLAN FOR REVIEW AND APPROVAL OF                               18.   ENSURE APPROPRIATE DUST CONTROL MEASURES EXIST FOR ALL STOCKPILES. ENSURE AN APPROPRIATE SEDIMENT                                     4.    ALL MANHOLE COVERS LOCATED NOT WITHIN ROADWAY TO BE SOLID DUCTILE CAST IRON CLASS B IN ACCORDANCE
                                                                                                                                  PRINCIPAL AND SUPERINTENDENT, PRIOR TO CONSTRUCTION.                                                                               CONTROL SYSTEM IS LOCATED DOWN-SLOPE OF ALL STOCKPILES.                                                                                     WITH STANDARD DRAWING IPWEAQ DS-020.
                                                                                                                            13.   FOLLOWING COMPLETION OF THE WORKS THE CONTRACTOR SHALL CLEAN UP THE SITE AND DEMOBILISE TO THE                                                                                                                                                                           5.    THE CONTRACTOR IS TO CONSIDER CONSTRUCTION LOADING ON EXISTING AND NEW STORMWATER PIPES AND
                                                                                                                                  SATISFACTION OF THE PRINCIPAL AND SUPERINTENDENT.                                                                           SITE REHABILITATION:                                                                                                                               STRUCTURES.

                                                                                                                                                                                                                                                               19.   ENSURE THE SOIL SURFACE IS SCARIFIED PRIOR TO THE PLACEMENT OF TOPSOIL TO BREAK UP ANY EXCESSIVE                                      6.    ALL PIPE PENETRATIONS WILL BE NEATLY MORTARED ON THE INSIDE FACE OF MANHOLES AND / OR PITS.
                                                                                                                            SURVEY                                                                                                                                   COMPACTION, AND ENABLE THE APPROPRIATE KEYING OF THE SOIL LAYERS.                                                                     7.    THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL TRENCH EXCAVATION AND CONSTRUCTION IS IN
                                                                                                                            1.    THIS DESIGN IS BASED ON SURVEY PROVIDED BY NOOSA COOLOOLA LAND SURVEYS PTY. LTD.                                             20.   SCARIFY LIGHTLY COMPACTED SOILS TO A MINIMUM DEPTH OF 100mm AND HEAVILY COMPACTED SUBSOILS TO A                                             ACCORDANCE WITH CURRENT CONSTRUCTION SAFETY ACT AND WORKPLACE HEALTH AND SAFETY LEGISLATION.
                                                                                                                            2.    ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (AHD).                                                                                   MINIMUM DEPTH OF 300mm.                                                                                                               8.    THE CONTRACTOR IS TO TAKE ALL POSSIBLE MEASURES TO ENSURE PROPER COMPACTION TO BACKFILLING OF
                                                                                                                                                                                                                                                               21.   TURF MUST NOT BE PLACED ON EXCESSIVELY COMPACTED SOILS.                                                                                     TRENCHES AND STRUCTURES.
                                                                                                                            3.    THE CONTRACTOR SHALL CONFIRM EXISTING LEVELS, FEATURES AND UTILITIES PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                               22.   ALL SITE REHABILITATION MEASURES SHOULD BE MONITORED, PARTICULARLY AFTER RAINFALL.                                                    9.    THE CONTRACTOR IS TO PROVIDE A CCTV SURVEY OF ALL NEWLY CONSTRUCTED STORMWATER DRAINAGE ASSETS
                                                                                                                            4.    ALL ELEMENTS OF PROPOSED WORK TO BE SETOUT AND CHECKED BY THE CONTRACTOR'S LICENSED SURVEYOR AND
                                                                                                                                                                                                                                                                                                                                                                                                                 FOR APPROVAL BY THE ENGINEER AND / OR LOCAL AUTHORITY.
                                                                                                                                  ANY DISCREPANCIES ARE TO BE REPORTED TO THE SUPERINTENDENT.
                                                                                                                                                                                                                                                                                                                                                                                                           10.   IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DEMONSTRATE HE HAS CAUSED NO DAMAGE TO EXISTING
                                                                                                                                                                                                                                                               EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                 STORMWATER INFRASTRUCTURE DURING THE CONSTRUCTION OF THESE WORKS.
                                                                                                                            EXISTING SERVICES                                                                                                                 OBJECTIVES:
                                                                                                                                                                                                                                                                                                                                                                                                           11.   ALL DEFECTS IDENTIFIED BY THE CCTV SURVEY WILL BE REPAIRED TO A SATISFACTORY STANDARD BY THE
                                                                                                                            1.    THE LOCATION OF ALL IN-GROUND AND OVERHEAD SERVICES HAS BEEN DETERMINED FROM FIELD SURVEY, DIAL                              1.    THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT MEASURES ARE                                                CONTRACTOR. PAYMENT FOR THESE REPAIRS WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR, UNLESS IT
                                                                                                                                  BEFORE YOU DIG ENQUIRIES AND INFORMATION PROVIDED BY THE SERVICE PROVIDERS / AUTHORITIES.                                          REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.                                                                         CAN BE DEMONSTRATED THAT THE IDENTIFIED DAMAGE WAS PRE-EXISTING AND THE RESPONSIBILITY OF OTHER
                                                                                                                            2.    THE SERVICES ARE SHOWN ON THESE DRAWINGS FOR INFORMATION ONLY AND NO RESPONSIBILITY IS TAKEN FOR                             2.    THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION PHASE AND                                                PARTIES.
                                                                                                                                  THE ACCURACY OR COMPLETENESS OF THE INFORMATION SUPPLIED.                                                                          MAINTENANCE PERIOD.                                                                                                                   12.   UPON COMPLETION ALL STORMWATER DRAINAGE INFRASTRUCTURE WILL BE CLEAR OF DEBRIS AND OTHER
                                                                                                                            3.    NOT ALL EXISTING SERVICES HAVE NECESSARILY BEEN IDENTIFIED AND SHOWN ON THE DRAWINGS.                                        3.    EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISTURBANCE.                                                       BLOCKAGES.
                                                                                                                            4.    THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES ON THE SITE PRIOR TO COMMENCING
                                                                                                                                  WORKS.                                                                                                                       MANAGEMENT PRINCIPLES:
                                                                                                                            5.    NO WORK IS TO BE UNDERTAKEN OVER OR WITHIN 3m OF EXISTING SERVICES PRIOR TO NOTIFICATION TO THE                              4.    THE MANAGEMENT PRINCIPLES EMPLOYED IN THESE DRAWINGS ARE IN ACCORDANCE WITH THE 'BEST PRACTICE
                                                                                                                                  APPROPRIATE AUTHORITIES.                                                                                                           EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION CONTROL ASSOCIATION
                                                                                                                            6.    EXISTING VALVES, HYDRANTS, PITS, ACCESS CHAMBERS AND OTHER UTILITIES SHALL BE MODIFIED WHERE                                       (IECA). THE BASIC PRINCIPLES ARE TO:
                                                                                                                                  NECESSARY TO SUIT FINAL FINISHED SURFACE LEVELS.                                                                                   ● MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                                                                                                                                     ● CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;
                                                                                                                            CLEARING, GRUBBING AND DISPOSAL                                                                                                          ● MINIMISE EROSION;
                                                                                                                            1.    CLEARING SHOULD NOT OCCUR UNLESS PRECEDED BY THE INSTALLATION OF ALL NECESSARY EROSION AND                                         ● MINIMISE SEDIMENTATION;
                                                                                                                                  SEDIMENT CONTROL MEASURES. THE EXCEPTION WOULD BE ANY CLEARING NECESSARY TO ALLOW INSTALLATION OF
                                                                                                                                  THESE CONTROL MEASURES.                                                                                                            ● PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.

                                                                                                                            2.    CLEARING SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.
                                                                                                                            3.    ESTABLISH ANY NON-DISTURBANCE OR EXCLUSION AREAS IDENTIFIED.                                                                 CONSTRUCTION PRE-START MEETING:

                                                                                                                            4.    WHERE APPROPRIATE, IDENTIFY, ISOLATE AND/OR PROTECT RETAINED VEGETATION.                                                     5.    THE CONSTRUCTION PRE-START MEETING IS AN OPPORTUNITY FOR ALL PARTIES TO DISCUSS CRITICAL ISSUES, SUCH
                                                                                                                                                                                                                                                                     AS:
                                                                                                                            5.    CLEARING SHALL BE MINIMISED TO ONLY THE TREES AND VEGETATION NECESSARY TO UNDERTAKE THESE WORKS.
                                                                                                                                                                                                                                                                     ● KEY OBJECTIVES OF THE EROSION AND SEDIMENT CONTROL PLAN;
                                                                                                                            6.    A SPOTTER-CATCHER SHOULD BE PRESENT DURING ALL CLEARING OPERATIONS.
                                                                                                                                                                                                                                                                     ● REQUIRED WATER QUALITY OBJECTIVES;
                                                                                                                            7.    CLEARING AND GRUBBING INCLUDES REMOVAL OF THE MAIN TREE ROOTS TO A MINIMUM DEPTH OF 1.0m AND THE
                                                                                                                                  REMOVAL OF SURFACE ROOTS AND VEGETABLE MATTER FROM THE TOP 0.3m BELOW THE NATURAL SURFACE LEVEL.                                   ● PERFORMANCE MONITORING AND INSPECTION PROCEDURES;

                                                                                                                            8.    DISPOSAL OF ALL CLEARED VEGETATION AND RUBBISH SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE                                 ● IDENTIFICATION OF THE RESPONSIBLE SITE OFFICERS;
                                                                                                                                  LOCAL AUTHORITY.                                                                                                                   ● IDENTIFICATION OF CRITICAL ENVIRONMENTAL CONCERNS;
                                                                                                                            9.     CLEARED VEGETATION CAN BE PROCESSED THROUGH WOOD CHIPPING AND THE MULCH PRODUCED PLACED IN                                        ● REPORTING PROCEDURES FOR NON-COMPLIANCE ACTIVITIES AND EVENTS.
                                                                                                                                  INTERIM STOCKPILES FOR LATER USE IN EROSION AND SEDIMENT CONTROL OR LANDSCAPING PURPOSES.

                                                                                                                                                                                                                                                              SITE INSPECTION AND MONITORING:
                                                                                                                            EARTHWORKS / EXCAVATION                                                                                                            6.    CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND MAINTENANCE OF
                                                                                                                            GENERAL:                                                                                                                                 CONTROL MEASURES (E.G. SITE FOREMAN).
                                                                                                                                                                                                                                                               7.    ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
                                                                                                                            1.    ALL EXISTING UNDERGROUND SERVICES TO BE LOCATED AND MARKED PRIOR TO COMMENCEMENT OF
                                                                                                                                                                                                                                                                     ● AT LEAST DAILY WHEN RAIN IS OCCURRING;
                                                                                                                                  EARTHWORKS.
                                                                                                                                                                                                                                                                     ● AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURRING ON-SITE);
                                                                                                                            2.    ALL EARTHWORKS ACTIVITIES INCLUDING STRIPPING, EXCAVATION, FILLING, COMPACTION AND TESTING, IS TO BE
                                                                                                                                  UNDERTAKEN IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS, CURRENT RELEVANT AUSTRALIAN                                            ● WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
                                                                                                                                  STANDARDS, OTHER STATUTORY REQUIREMENTS AND TO THE SATISFACTION OF THE LOCAL AUTHORITY AND THE                                     ● WITHIN 18 HOURS OF A RAINFALL EVENT.
                                                                                                                                  ENGINEER.
                                                                                                                                                                                                                                                               8.    CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF EXCESSIVE FLOW
                                                                                                                            3.    ORGANIC RICH TOPSOIL MUST NOT BE USED IN FILL. IT SHALL BE STOCKPILED FOR RE-USE IN LANDSCAPING OR                                 CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT ACCUMULATION.
                                                                                                                                  DISPOSED OF. STOCKPILES SHALL NOT EXCEED 2M IN HEIGHT.
                                                                                                                                                                                                                                                               9.    CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
                                                                                                                            4.    EARTHWORKS SHOULD AVOID THE EROSION OR SILTATION OF ADJOINING LANDS, STREAMS OR WATERCOURSES.
                                                                                                                                                                                                                                                               10.   WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF THIS FAILURE
                                                                                                                                  REFER EROSION AND SEDIMENT MANAGEMENT PLAN AND NOTES.
                                                                                                                                                                                                                                                                     MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE CONTROLS.
                                                                                                                            5.    ALL EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND FULLY OPERATIONAL PRIOR TO COMMENCEMENT OF
J:\2019\19553sd2_Lake_MacDonald_Drive_Subdivision\4.CADD\#ACAD\19553_CIVIL.dwg




                                                                                                                                  EARTHWORKS.                                                                                                                  11.   THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY CORRECTIVE
                                                                                                                                                                                                                                                                     ACTIONS TAKEN.
                                                                                                                            6.    EARTHWORKS SHOULD BE STAGED TO MINIMISE THE EXTENT AND DURATION OF SOIL EXPOSURE.
                                                                                                                            7.    EARTHWORKS QUANTITIES HAVE BEEN CALCULATED BETWEEN THE NATURAL SURFACE AND THE FINISHED
                                                                                                                                  SUBGRADE LEVELS.
                                                                                                                            8.    ALL ALLOTMENT EARTHWORKS SHALL BE COMPACTED TO A MINIMUM DRY DENSITY RATIO OF 95% IN ACCORDANCE WITH AS3798 GUIDELINES
                                                                                                                                  ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS.




                                                                                 COPYRIGHT ©                                                                                                 Associated Consultants                        Client                                                                                         Drawn                 Verified                Project                                                                         Drawing Title                                                    Scale             Sheet Size
                                                                                                                                                                                                                                                                                                                                          LD                    DR
                                                                                 This drawing is subject to
                                                                                 copyright in accordance with
                                                                                                                                                                                                             PLANNER
                                                                                                                                                                                                             Pivotal Perspective Pty Ltd
                                                                                                                                                                                                                                           TEATREE PROPERTY PTY LTD                                                                                                                     LAKE MACDONALD DRIVE                                                            GENERAL NOTES                                                                        A1
                                                                                 the agreement between TOD                                                                                                                                                                                                                                Designed              Verified
                                                                                 Consulting Pty Ltd (tc) and tc's                                                                                            Jack Lewis                                                                                                                   LD                    DR                      RURAL RESIDENTIAL SUBDIVISION                                                                                                                    Drawing Number
                                                                                 client. This drawing shall only                                                                                             0406 334 227
                                                                                 be used for this specific project.                                                                                                                                                                                                                       Approved              RPEQ No                 RP DESCRIPTION    8RP160703 : 2RP852009 : 3RP137375 : 140MCH978 : 101SP142407                                                                            19553-C1001
                                                                                 This drawing shall not be used                                                                                                                                                                  Noosa: 07 5449 9600       Sunshine Coast: 07 5329 3190   D REYNOLDS            9072                    LOCAL AUTHORITY   NOOSA SHIRE COUNCIL
                                                                                                                      B      20.07.20   INFORMATION REQUEST RESPONSE                  JF                                                                                                                                                                                                MCU APPROVAL      -                         HORIZ DATUM GDA94 / MGA Z56                          0     10     20       30      40      50   60   Sheet              Revision
                                                                                 for construction until marked as                                                                                                                                                                           PO Box 61, Noosaville, QLD 4566               Signed
                                                                                                                       A     24.03.20   OPW SUBMISSION                                LD                                                                                         [email protected]     www.todconsulting.com                                                  ROL APPROVAL      RAL 19/0018               VERT DATUM     AHD
                                                                                 'Issued For Construction' in the
                                                                                 revision description.                Rev      Date     Revision Description                         Drawn                                                                                                       ABN 39 128 805 336                                                          20.07.20   OPW APPROVAL                                RL DATUM                                                   MEASUREMENT BAR - INCREMENTS IN mm                2 of 17       B
Log in to download the original file

19553-C1000_[B]-DG-CLC_[B] Civil Engineering Drawings.pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.