App 5 - Wastewater Design
7.0 Design Drawings THIS PLAN IS SITE SPECIFIC FOR 328 Upper Pinbarren Creek Rd, Pinbarren 6.6m 6m level Inlet 1350mm pack sand under 300mm Note: Vent Ground level Correct installation of connectors in AES Manual page 9. Area A Area B Entire bed base is to be ripped 300mm parallel to AES Pipes 3.64m Gypsum applied at 1kg / m2. Infiltration Extension Area 6.6m x 2.29m x 150mm system sand. IMPORTANT NOTES PLEASE READ. Inspection Port to be installed at furthest point from Influent to AES Pipes - see Appendix Page 9 The installer MUST refer to the Advanced Enviro-Septic Design & Installation for installation instructions Manual provided. If you do not have a copy of this manual please contact Chankar Environmental and a copy will be emailed FREE. Sections C, D, & E of the Design and Installation Manual are of particular relevance Inspection Port to be installed when installing an Advanced Enviro-Septic System. between AES Pipes - see Appendix Page 9 THIS IS NOT A SEPTIC TRENCH AND MUST BE INSTALLED AS PER THE for installation instructions AES DESIGN AND INSTALLATION MANUAL GUIDELINES. Ensure you have the correct sand and all fittings to complete the installation if you are unsure of anything please contact Chankar Environmental (07) 54 744 055 or Biowater Designs 0407 887 321. Imported sand (course washed) Backfill with site soil min 150mm cover over sand and mound soil over bed to prevent water access. 300mm Inspection Port Inspection Port 3% slope 150mm Natural Ground Level 150mm Inlet AES pipe 750mm 150mm 300mm 300mm 300mm 300mm Rip & Gypsum 300mm parallel to pipes 8/9 9/9300mm 150mm Sand 2290mm 1350mm AES Sand Coverage Minimums C Lance Picton 2019 all rights reserved 6/10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.