Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Selected lines sidescan sonar data were processed in the Chesapeake Technology SonarWiz
package using the following workflow:
     •   Load XTF files as exported from QINSy;
     •   Check real-time bottom tracking (for slant range correction of imagery) and if necessary
         re-track using automated or manual techniques;
     •   Build Empirical Gain Normalisation (EGN) curves for main lines of each block. Apply
         EGN to files for image enhancement;
     •   If necessary, adjust DC gain associated with selected lines to better match image
         intensity across all lines used to create the mosaic;
     •   Save final / acceptable mosaic as a gray-scale GeoTiff (palette assigned acoustic
         shadows as dark pixels and high backscatter returns as light pixels).


Data deliverables included:
     •   Ungridded, geospatially-corrected, cleaned bathymetry points;
     •   Gridded, geospatially-corrected, cleaned bathymetry points;
     •   Contours at 0.5m in DXF format;
     •   8-bit backscatter mosaics of selected survey areas;


Although not delivered as part of the initial data set, we intend to assemble and submit a
Fledermaus Scene that captures all available data acquired during the survey operations and
supplied by Noosa Council as background information. We view this Scene as being
potentially useful for illustrating riverbed / seabed features that exist across the Noosa River.




16                             Noosa Council - Noosa River Survey                      20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.