2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6.0 Results
As this project was essentially a data gathering exercise the Results section is limited to
observations about the survey operations, internal consistency of new data, comparison to
existing bathymetric data, and some brief comments about the backscatter data acquired as
part of the survey (and how it might assist future Noosa Council projects).



Survey Operations
As a whole the survey operations went well. No equipment failures occurred and all system
deployments/recovery were conducted in a safe manner. Afternoon survey operations were
interrupted on a couple of days because of thunderstorms but close monitoring of weather
fronts via local radar ensured that all personnel were off the water before any danger of
lightning strikes occurred.
Tides were not particularly favourable during the survey or the Noosa River was shallower
than anticipated / hoped (in terms of clearance of the sonar equipment from the bottom). This
resulted in a narrower swath width per survey line and hence more lines required to provide
proper infill over the specified areas. Moored vessels also required some deviations and
additional infill. However, the area covered over the allocated 5 days of surveying was
substantial and I think provides a good baseline for future monitoring efforts.
The figures below highlight some of the features mapped along the river.




Figure 15: River depths at the upstream extent of the survey near the ferry crossing. A shallow sand bar
    prevented complete mapping along the eastern bank. The hole to the south of ferry crossing is
                                     approximately 7m deep (AHD).




17                               Noosa Council - Noosa River Survey                          20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.