Council archive · source document
Decision Notice - Minor Change - 51994 1165 01 [As Published] · 51994.1165.01
4. ASSESSMENT MANAGER CONDITIONS
1. Submission to and approval by Council of building plans in accordance with the Building Act,
Council’s By-Laws and Policies, the conditions of this approval and substantially in
accordance with plans 9331.01 and 9331.02 drawn January 1994 and the Shire of Noosa
Planning Scheme apart from where amendment are required or dispensations have been
granted in conjunction with this approval.
2. Provisions of at least 3 off-street car parking spaces, comprising 2 cover spaces and 1
uncovered space, and access thereto which are to be provided with a sealed pavement and
designed, drained, constructed and maintained in accordance with the Planning Scheme,
Council’s Policies and to the reasonable satisfaction of the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be grated until the
Shire Engineer has approved of the carparking and access scheme.
3. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive, lighting nuisance or other emissions.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscape plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.
The landscaping plan is to indicate mounding and dense planting at the front of the site to
screen the driveway.
5. Any fencing provided in conjunction with the development is to be setback an average of two
(2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the Planning
Scheme.
6. Construction work and other associated activities are permitted only during the hours of
7.00a.m to 6.00p.m. Monday to Saturday. No work is permitted on public holidays, except
where extended hours are approved by the Building Surveyor.
7. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks. An estimate only of the charges as at December, 1993 under the current policy
is as follow: -
Water Supply $3181
Sewerage $1947
TOTAL: $5128
Headworks contributions shall be calculated and paid in accordance with one of the following
alternatives:-
a. Prior to the issue of a Building Approval, in the amount calculated under the Policy at
the date: or
b. Deferred to the soonest of the following dates:-
i. Prior to Council sealing plans of the development for titling purposes;
ii. Prior to the issue of a Certificate of Classification for any building approval under
this application; or
iii. Prior to commencement of the approved use at the relevant premises.
Where the option of a deferred payment is used in accordance with b. above, the following
conditions shall also apply:-
A. Prior to the issue of a Building Approval, a trading bank guarantee is to be submitted
to the value of headworks which are due, plus 20%.
Page 2 of 6
Document Set ID: 22475691
Version: 4, Version Date: 29/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 51994 1165 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 155 KB (small file)
- File type
No other editions are linked here.