ORDINARY MEETING MINUTES 16 JANUARY 2020
protection of trees identified in this permit for retention. The new path must be in
compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
Construction Details. The works must be provided as part of Stage 1 of
development and include:
24.1. A sufficient number of pram ramps to be provided near the intersection of
Kauri Street and Olivine Street where identified by Council to connect to
existing and proposed pathways network.
24.2. A pedestrian pathway connection 1.5m wide from Kauri Street’s public
pathway into the development site to be located north of proposed Unit 9.
The above condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
The following Recommendations from the General Committee were adopted without
discussion or further amendment.
Council Resolution
Moved: Cr Jackson
Seconded: Cr Wilkie
The General Committee recommendations dated 13 January 2020 be adopted except where dealt
with or held over by separate resolution.
Carried unanimously.
2 51987.44.01 OTHER CHANGE APPLICATION FOR A MATERIAL CHANGE OF USE FOR
ENTERTAINMENT AND DINING BUSINESS - TYPE 2 SHOP & SALON - 6 THOMAS
STREET, NOOSAVILLE
That Council note the report by the Development Planner to the General Committee Meeting
dated 13 January 2020 regarding Application No. 51987.44.01 for an Other Change to a
Development Approval for Entertainment and Dining Business - Type 1 Food & Beverages and
Retail Business - Type 2 Shop & Salon, situated at 6 Thomas Street, Noosaville Qld 4566 and:
A. Approve the change and add the following conditions:
When Conditions Must Be Complied With
12. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
13. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
15.0319.1.3A A New Ground Floor Plan Aug 2019
15.0319.1.4A A New First Floor Plan Aug 2019
15.0319.1.5A A Elevations Aug 2019
Page 8 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.