Original source · versioned page text
2014-11-11 Planning & Organisation Committee Agenda
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 11 NOVEMBER 2014 OPW14/0276 - SIGNAGE CONDITIONS Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed and are as amended by the conditions herein. Plan No. Rev. Plan/Document Name Date OGSS-001-06 G Elevations 1 & 2 18/9/14 Sign Size & Total Sign Face Area 2. No sign shall exceed a maximum sign face area of 4m². In this regard, the “Self Storage” signs, shown as Sign 1 on each building on the approved plan, shall be reduced in size to comply. 3. The total sign face area for the development shall not exceed 20m 2. Any additional signage to that shown on the approved plan must be removed or separate written approval obtained from Council. Location 4. The approved signs must be positioned wholly within the property boundaries of the subject site, and must not be located within or across any easements. Illumination 5. Only 1 sign on the site may be illuminated. 6. Illumination resulting from direct, reflected or other incidental light emanating from a sign must not exceed a luminance of 300 candelas per square metre. 7. All sign illumination must be switched off between 11:00pm and sunset of the following day. Advisory Notes Unitywater Connection to Unitywater live water mains and the Unitywater live sewer system must be undertaken by Unitywater at the applicant’s cost. A 150mm diameter water main is located within the road boundary fronting the development site in Rene Street. Construction works, heavy traffic crossing the main, excessive vibration and excavation close to the main may cause damage to the pipe. Extreme care is required when working close to this infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage Page 17 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.