Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-11-11 Planning & Organisation Committee Agenda

of 129

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             11 NOVEMBER 2014


20.   Earthworks carried out on site shall not affect the structural integrity of any of the
      adjoining properties, existing fences or structures that border the development site.
      Fences that are affected shall be replaced prior to the Building Certifier issuing the
      Certificate of Classification. In this regard any fences to be replaced shall be clearly
      shown on the plans submitted for Operational Works approval.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect which are
taken to be a water approval for a staged connection. Any future applications must be made
to Unitywater under South East Queensland (Distribution and Retail) Restructuring Act 2009.
Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
Water & Sewerage
21.   Reticulated water supply and sewerage must be provided to the development.
22.   Construction activities must not impede the access of Unitywater or Fire Brigade
      personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
23.   The fire-fighting demand on Unitywater’s water supply system from the development
      must not exceed 30 litres per second.
24.   A single Unitywater installed primary water meter must be provided immediately inside
      the property boundary. Meters must be Unitywater approved, installed in accordance
      with Unitywater requirements and remain accessible at all times for reading and
      maintenance purposes.
25.   Water meters must be located on alternative boundaries to electrical pillars.
26.   Buildings, basements and other structures must maintain a minimum clearance of 1.5
      meters from Unitywater sewer mains, and 1.0 meter from a sewer manhole chamber
      or sewer inspection opening.
27.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers
      located within property boundaries in accordance with the SEQ standards. Easements
      shall be centred over the pipe. Easement terms shall be the most current registered
      dealing held by the Department of Natural Resources & Mines and shall not be altered
      or amended.
28.   Storm water retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 meters from Unitywater water supply and sewerage infrastructure.
29.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
      Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
      plants within these clearances must be low growing when mature, and suitable
      approved varieties.
30.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs
      associated with repair, replacement or alteration of infrastructure must be met by the
      applicant.




                                                                                      Page 16 of 129
Log in to download the original file

2014-11-11 Planning & Organisation Committee Agenda(PDF, 18MB).pdf · 18.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.