Original source · versioned page text
2014-11-11 Planning & Organisation Committee Agenda
The original of this document is very large (18.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 11 NOVEMBER 2014
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in
addition to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:
1 the Disability Discrimination Act 1992 (Commonwealth);
2 the Anti-Discrimination Act 1991 (Queensland); and
3 the Disability (Access to Premises – Buildings) Standards.
4 The applicant is advised that the development works for this permit may require
payment of a compliance bond (to be determined in Operational Works Permit) in
accordance with Council’s policies. The payment of the bonds will be required prior
the prestart meeting for the Operation Works.
5 The Building and Construction Industry (Portable Long Service Leave) Levy must be
paid prior to the issue of a development permit where one is required for the 'Building
and Construction Industry'. This applies to Building Works, Operational Works and
Plumbing and Drainage Works applications, as defined under the Sustainable
Planning Act 2009, where the works are $80,000 or more and matching the definition
of 'Building and Construction Industry' under the Building and Construction Industry
(Portable Long Service Leave) Act 1991. Council will not be able to issue a Decision
Notice without receipt of details that the Levy has been paid. Should you require
clarification in regard to the amendments to the Building and Construction Industry
(Portable Long Service Leave) Act 1991, you should contact QLeave on 1800 803 481
(free call) or (07) 3212 6855
REPORT
1. PROPOSAL
The application seeks approval for a Material Change of Use of premises for an Industrial
Business – Type 1 Warehouse for the purposes of a self-storage facility. The proposed
development comprises a single 2 storey building sited in the middle of the lot with 8 car
parking places located along an internal access loop driveway.
The storage units are a mixture of sizes, ranging in area between 0.8m2 to 18m2. The
building is a simple colorbond industrial shed with some embellishments to the front façade.
The internal storage units are arranged over 2 levels accessed by a single goods hoist. The
building has a maximum height of 7.3m. No on-site management office component is
included, with this function to be provided at the applicant’s existing self-storage facility at
78-80 Rene Street. A copy of the proposal plans is included as Attachment 1.
The application is before Council as it seeks a relaxation of the maximum plot ratio (gross
floor area) identified for the site under The Noosa Plan.
Page 37 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.