13. Any building, structure and/or installation (e.g. sliding gate and associated mechanism)
must not encroach onto, or negate the conditions of, the registered easement/s along
the front boundary of the site.
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval in compliance with the relevant sections of Queensland Urban
Drainage Manual, the relevant Codes and Policies of The Noosa Plan and supported
by a detailed stormwater drainage report and design based on field survey and
prepared and certified by a suitably qualified and experienced Registered Professional
Civil Engineer, and must include in particular:
a. Where is considered effective and practical all roof runoffs should be directed to
water tanks with overflows and surcharge be discharged into a lawful point of
discharge.
b. Stormwater detention to cater for all flows from the outdoor areas and any
possible stormwater surcharge from the roof drainage system during heavy
rainfall events to maintain predevelopment stormwater runoff, and to address
any potential of adverse impact by the development on the existing drainage
conditions on other properties.
c. Plans submitted for operational works approval must include bioretention which
demonstrates that stormwater runoff shall be treated to achieve 80% Reduction
in Total Suspended Solids, 60% Reduction in Total Phosphorous and 45%
Reduction in Total Nitrogen prior to discharge from the site compared to if there
was no water pollutant mitigation incorporated into the design.
d. Where biobasins are proposed on site to achieve compliance with the above
Reduction parameters, calculations to determine filter media area and detail
design must be consistent with current best practice methods as detailed in the
Bioretention Technical Design Guidelines Version 1, October 2012.
e. Bioretention basins must include 1:4 batters between the dedicated filter media
area and the surrounding ground surface. Batters are not included within filter
media footprint area calculation.
f. Bioretention basin layout and setting must be consistent with landscape design
for the site.
15. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Advisory Notes
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination
Unit on 07 3238 3838 to discuss any obligations under the ACH Act.
Page 36 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.