Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Compiled Reference Documents - MCU20/0084.01 (As Published)

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                      Page 2 of 6



                 SITE SETTING
                 The site is located on a hillside that in part forms a natural valley. The area is well vegetated, with
                 the site containing several existing ponds and water features which flow into the main creek at the
                 bottom of the site.

                 Figure 2 below, shows a site profile traced along the access road to the location of the proposed new
                 cabin.



                                                                    B




                                                    A


                                                                                                                            B
                     A

                 Figure 2 - Elevation Profile through site (based on 1m LIDAR data). ‘A’ marks site access from Upper Pinbarren
                 Road; ‘B’ marks proposed lodge; Star marks bridge over creek; Circle marks level crossing.

                 There are two creek crossings on the site, the primary crossing located at the site entrance is via a
                 bridge and a second level crossing north of the caretakers’ house where a spillway overtops from the
                 pond.

                 (It should be noted that both bridge and level crossing works are proposed to improve the flood
                 resilience and better notify site users of the risks at these locations.)




                 328 Upper Pinbarren Creek Road                                                             16 September 2023

Document Set ID: 23436134
                  22593170
Version: 2,
         1, Version Date: 28/04/2025
                          22/09/2023
Log in to download the original file

Compiled Reference Documents - MCU20_0084.01 (As Published).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.