Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Compiled Reference Documents - MCU20/0084.01 (As Published)

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                   Page 3 of 6



                 SITE FLOOD RISK
                 The primary source of flood risk to the site and in particular site users relate to flash flooding within
                 the site and wider catchment from heavy rainfall events. Specifically, there are number of ponds on
                 the site which pick up runoff from rainfall within the site and overflow down the site and into the
                 main creek that forms the southwestern border of the site. Although these ponds and other features
                 are significantly lower than any of the existing or proposed buildings on the site and would not pose
                 direct risk to those buildings, access routes to and from the site could be subject to inundation and
                 flooding in more severe events. The purpose of this Flood Management Plan presented in Appendix
                 1 is to provide a quick reference guide for the site owners and users of the site in an emergency.

                 We trust this information is satisfactory for your current needs. Should you have any questions,
                 please feel free to contact the undersigned.




                  Written By:                                                                              Reviewed By:




                  Craig Smerdon                                                                                Nick Ward
                  Senior Civil Engineer                                                                Chief Operating Officer




                 328 Upper Pinbarren Creek Road                                                        16 September 2023

Document Set ID: 23436134
                  22593170
Version: 2,
         1, Version Date: 28/04/2025
                          22/09/2023
Log in to download the original file

Compiled Reference Documents - MCU20_0084.01 (As Published).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.