MATERIAL CHANGE OF USE AND OPERATIONAL WORKS TO ESTABLISH MULTIPLE HOUSING (2X TYPE 2 DUPLEXES)
AND RECONFIGURATION OF A LOT (ACCESS EASEMENT) 20
30 & 32 THE COCKLESHELL NOOSAVILLE
76. Additional technical detail regarding, stormwater discharge, driveway grades, internal circulation areas,
and footpath composition is provided in the Civil Engineering Plans prepared by 360 Civil Consulting
(Appendix 2).
5.9 Erosion and Sediment Control Code
77. Please refer to the Sediment and Erosion Plan prepared by 360 Civil Consulting (Appendix 2) for details
on the proposed sediment and erosion control measures.
5.10 Earthworks Code
78. Please refer to the Civil Engineering Plans prepared by 360 Civil Consulting (Appendix 2), in relation to
the proposed earthworks.
5.11 Existing Services Code
79. As detailed in the Contour and Detail Survey prepared by Skyline Surveyors (Appendix 3), the subject site
does not contain any reticulated water, or sewer infrastructure, which traverses the lots. It is noted that
there is existing stormwater infrastructure traversing through Lot 0 on BUP6971.
80. The only element of the development (other than driveway) proposed within the zone of influence is the
fence and gate structure, which provides entrance to the private open space area for Unit B of 32 The
Cockleshell. The infrastructure will not prohibit the ability for Council to gain access to, or service the
infrastructure. Accordingly, the development complies with the Existing Services Code.
5.12 Waste Management Code
81. The proposed development complies with Probable Solution S1.2 of the code, with the development
containing sufficient area for the storage of waste and recycling bins within each unit.
82. It is proposed that the bins will be transferred to the kerb for servicing on waste collection days, it is
noted that there is sufficient road frontage for the temporary placement and servicing of the bins from
the kerb. Given the low scale of the development, it is determined that bulk bins are not required.
6 Infrastructure Charges
83. Table 8 below details the applicable Infrastructure Charges (Noosa Shire Council Charges Resolution 2014
– Amendment 1) and identifies the applicable credits associated with the subject sites. In addition to
Table 8 Total Infrastructure Charges Calculation
Address Land Use Unit Charge Total Charge/Credit
30 & 32 The Cockleshell Duplex 4 $28,000.00 $112.000.00 Charge
(3 bedroom)
30 The Cockleshell Dwelling House 1 $28,000.00 $28,000.00 Credit
(3 bedroom)
32 The Cockleshell Duplex 1 $20,000.00 $20,000.00 Credit
(2 bedroom)
32 The Cockleshell Duplex 1 $28,000.00 $28,000.00 Credit
(3 bedroom)
Total $ 36,000.00 Charge
MOHAMMED HUSSAIN, LUCY RANDALL, SUZANNE MAREE JOHNSON COLE AND DR DAVID
ANDREW JOHNSON
DECEMBER 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.