ADAMS + SPARKES Town Planning Report (30 & 32 The Cockleshell)
Attached to the e-mail MCU17/0563, OPW17/0597 & RAL17/0513 - Material Change of Use, Op Works & Recon (access easement) - 30 & 32 The Cockleshell, Noosaville.
Original PDF page 42, section 1. The text section number identifies this passage in the reader.
MANDATORY:
Floor Plans showing total number of bedrooms per unit required for Dual Occupancy applications must be provided
with this application. Preferred water meter location/s must also be provided with this Application.
Where UW infrastructure charges may not apply:
Relative's accommodation (under the Superseded Redcliffe City Planning Scheme), Dependent person's accommodation (under
the Superseded Caboolture Shire plan), or Associated unit (under the Superseded Pine Rivers Plan), Secondary Dwellings
(under Moreton Bay Regional Council planning scheme 2016 and Sunshine Coast Planning Scheme 2014), Multiple Housing
type 1 — Relative or employee (Noosa Plan). Please refer to Unitywater's fact sheet on our website Unitywater Forms and Fact
Sheets for further details,
3. Is there a Unitywater Decision Notice for a water approval containing a condition which specifies payment to be
made for the installation of water meter/s?
O Yes A (go to the next Section)
If Yes; The applicant must note that following approval for a new water property connection, the applicant will be required to
submit a Water Supply and Sewerage Services Private Works Application to Private Works for Unitywater installation/alteration
of the water connection, available at Water Supply and Sewerage Services Private Works Application. This will also require the
payment of Unitywater infrastructure charges prior to water meter installation occurring. Unitywater will issue an infrastructure
charge notice as part of approving this application
Part C - Connection
Service Type requiring installation by Unitywater [tle asl eyslee) 61
mw Water Supply - (complete Part D and/or E)
(_ Sewerage - (complete Part F — Only select where a new sewerage property connection is required for installation)
Approval type: (tick appropriate box)
[Y Alterations to a Water Connection only (complete Part E)
For alterations to sewerage property connections please read Part F
Water Supply - Standard New Metered Service Connection - 20mm
« Street plan adequately locating subject site must be attached $1,112.00 ea oO
« Dimensioned Locality plan of proposed meter must be attached, refer T & C, section 4. a ‘
* (Dual Occupancy is Price on Application - see below)
. (For naw subdivisions - new metered connections are not to be applied for using this form)
Water Supply - Standard New Metered Service Connection - 25mm
Note:
« Street plan adequately locating subject site must be attached $2,040.00 oO
Dimensioned Locality plan of proposed meter must be attached, refer T & C, section 4. NRO OB
* (Qual Occupancy is Price on Application - see below)
© — (For new subdivisions - new metered connections are not to be applied for using this form)
Dual Occupancy
20mm water meter connection (Quantity of New Mete Jired) A POA* mw
25mm water meter connection (] (Quantity of New Meters Required)
Water Service Disconnection — Up to 25mm —
(Provide existing meter number if known: ) $408.00 ea. oO
NOTE: /f part of upgrading an existing meter then the existing meter number is not required
* Costs for water meter connection to Dual Occupancy are POA — Price On Application
Page 2 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.