Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
2.11 Risk management and mitigation
The Noosa LDMG has reviewed the high, medium and low risks identified by GHD and has
aggregated them by consequence. As a result it has identified the four highest risks for the
Shire as being;
   flooding
   wildfire
   pandemic
   hazardous chemical spill
Threat specific plans have been developed for these four high risk areas.
In addition to the hazard specific risks identified by GHD, the Noosa LDMG has identified the
following generic disaster management risks for the Shire in any disaster event.
   lack of trained coordination centre staff (as a result of de amalgamation)
   loss of power and communications across the Shire (as occurred following ex TC
    Oswald)
   community resilience
   limited recovery capacity

2.11.1 Risk reduction strategies
Having identified the major risks for the Shire in a disaster event the Noosa LDMG has
worked with Noosa Council to put in place the following risk mitigation and reduction
strategies:
   amendments to the Noosa Planning scheme in 2014 to reflect recent flood studies
    undertaken after the 2012 floods in Pomona, Cooroy and Daintree Estate and also to
    take into account the long term effect of climate change
   flood mitigation works in Daintree Estate, Cooroy and Pomona - three areas most
    heavily impacted in the 2012 flood event
   amendments to the Noosa Planning scheme in 2014 to reflect the latest bushfire
    mapping undertaken by the State Government taking into account slope and vegetation
    which brings this mapping in line with State methodology and improves accuracy
   establishment of community disaster management sub-groups and development of
    community sub-plans for isolated communities at Kin Kin, Cooran and Daintree Estate
    as per the recommendations of the Queensland Floods Commission
   continued Council support for local SES and Rural Fire Brigade groups
   participation in the District Health sub-group with a view to developing a regional
    response to any major health threat
   disaster Management training for key coordination staff
   annual program of Disaster Management exercises to test the coordination and
    response capabilities of the Noosa LDMG and the Noosa Council
   review of the location and fitness for purpose of evacuation centres across the Shire


                                                                                            51
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1(PDF, 2MB).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.