Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1

of 88

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
   provision of generators to provide emergency power at the Tewantin Administration
    Centre, the Noosaville Depot and the Tewantin SES shed
   review and upgrade of Council’s two way radio capability
   refurbishment of the Tewantin Council chambers for improved operation as the Local
    Disaster Coordination Centre
   establishment of a Local Recovery sub-committee of the LDMG and appointing a Local
    Recovery Coordinator
   establishment of a community welfare sub-committee of the Noosa LDMG to assist with
    responding to and recovering from an event
   agreement with key service providers for a protocol for the LDMG to access their
    register of vulnerable clients in the event that they cannot service their needs
   establishment of relationships and lines of communication with neighbouring LDMGs in
    particular Sunshine Coast and Gympie
   participation in the State Government’s ‘Get Ready’ campaign

2.11.2 Residual Risk

As a result of putting in place these risk mitigation strategies the Noosa LDMG believes that
it has enhanced the Shire’s capacity to respond to and recover from a disaster event,
however there remain a number of residual risks which still need to be managed.
Going forward the Noosa LDMG has identified that the major residual risks for the Shire will
occur in a greater than 1:100 flood event, a sudden onset event such as a hazardous
chemical spill, a terrorist attack, an earthquake or a tsunami and/or from a major pandemic.
In any of the above circumstances it is unlikely that the Local Group will be able to manage
the event without external assistance from the District and the State Government.




                                                                                           52
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1(PDF, 2MB).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.