Council archive · source document
Attachment 1 - Code Assessment · MCU23/0030
Attachment 1 – Code Assessments
Performance outcomes Acceptable Outcomes Response
brigade fitting connected to the water
supply (other than where the water supply
is in a swimming pool or dam).
Editor’s Note — Water supply capacity for
firefighting purposes is in addition to water supply
capacity for household use.
Flood Hazards AO16.1 Complies
PO16 Where the development is located in the Flood Proposed finished floor levels will be adopted with
Development is designed and sited to ensure risk to Hazard Area as shown on Flood Hazard Overlay the minimum required freeboard to flood events in
people and property from flooding is avoided or Map in Schedule 2, accordance with the QUDM and Council
minimised. the finished floor level of habitable rooms is at lea Development Codes. For further details please refer
st 300 millimetres above the Defined flood event to the Engineering Report included at Attachment
(DFE). 3.
OR
AO16.2
Where the DFE has not been modelled for the
area, the finished floor level of habitable rooms is
at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory provisions
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 1 - Code Assessment .pdfRelated documentApplication case desk ↗
About this file
- File size
- 434 KB (small file)
- File type
No other editions are linked here.