Skip to the record
Beware of cheap imitations.

Council archive · source document

Attachment 1 - Code Assessment · MCU23/0030

of 39

Text shows just the words. Original shows the document exactly as it was published.

Attachment 1 – Code Assessments


Performance outcomes                                Acceptable Outcomes                                     Response

                                                            brigade fitting connected to the water
                                                            supply (other than where the water supply
                                                            is in a swimming pool or dam).


                                                    Editor’s Note — Water supply capacity for
                                                    firefighting purposes is in addition to water supply
                                                    capacity for household use.

Flood Hazards                                       AO16.1                                                 Complies
PO16                                                Where the development is located in the Flood Proposed finished floor levels will be adopted with
Development is designed and sited to ensure risk to Hazard Area as shown on Flood Hazard Overlay the minimum required freeboard to flood events in
people and property from flooding is avoided or Map in                       Schedule                   2, accordance with the QUDM and Council
minimised.                                          the finished floor level of habitable rooms is at lea Development Codes. For further details please refer
                                                    st 300 millimetres above the Defined flood event to the Engineering Report included at Attachment
                                                    (DFE).                                                 3.

                                                    OR

                                                    AO16.2
                                                    Where the DFE has not been modelled for the
                                                    area, the finished floor level of habitable rooms is
                                                    at               least               500 millimetres
                                                    above the highest recorded                     flood.

                                                    Editor's Note—The QDC mandatory provisions

Used in these records

About this file

File size
434 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 1 - Code Assessment .pdf · 434 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.