Performance outcomes Acceptable Outcomes Response
MP3.5 also apply to the construction of buildings in
flood hazard areas.
PO17 No acceptable outcome provided Complies
Underground car parking areas are designed to Please refer to the Engineering Report included at
drain and function safely during a flood event and Attachment 3 in relation to flooding and carparking.
power failure.
Editor's note—Basements should have flood
immunity above the 1%AEP defined flood event
with alternative means to mechanical pumping
used to achieve such immunity.
Major Electricity Infrastructure & Substations AO18.1 Not Applicable
PO18 Development including any sensitive land uses is at Site not located within proximity of major electrical
Development is sufficiently separated from major least: infrastructure or substations.
electricity infrastructure and substations to
minimise the likelihood of nuisance or complaint.
1. 50 metres from a transmission substation;
2. 10 metres from any other substation; and
3. 30 metres from a transmission line
easement.
AO18.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 1 - Code Assessment .pdfRelated documentApplication case desk ↗
About this file
- File size
- 434 KB (small file)
- File type
No other editions are linked here.