Council archive · source document
RFI - Revised Plans · MCU20/0074
Plans and drawings: the text below has words only, no drawings.
Z:\14_Nigel's Backup\STUFF\107\LOT 107 WKG
DWG'S Stage 1 Rev D 201004.pln
REVISION A
3,000 12,650
140 2,860 6,140 6,510
Outside face of timber frame
ABODE SOLUTIONS
630
140
190
Design & Drafting
0400 799 146
1,980
Outside face of blockwork
4,560
900
6,140
4,880
1500
5,860
6,950
10,850
140
1,000 630
500
1,800
Outside face of blockwork
14,470
14,470
2,190
2,190
190
190
630 1,000
1,800 500
140
Outside face of blockwork
6,950
6,140
4,880
5,860
1500
4,060
900
1,980
630
Outside face of timber frame
140
190
140 2,700 6,140 6,510
12,650
The designs and drawings shown on these plans
15,490 are copyrighted and remain the property of
Abode Solutions, Unauthorized copy/distribution
of these plans is prohibited.
CONCRETE EARTHWORKS
Slab measurements are to the outside face of external skin.
Refer soil report for footing & slab design.
PLUMBING
Fixture dimensions to be used as a guide only.
Fixture and fitting sizes may vary; therefore dimensions
N Client Name
Mr M Tarrant
Project Name
Concrete construction is to comply with AS2870. may not be exact. Proposed New Residence
Masonry construction is to comply with AS3700 and clause Fixture and fitting dimensions are to be checked on site.
F1.4 of the BCA. Lot 107, Tewantin Road,,
Walls are to be articulated in accordance with construction Cooroy, Qld, 4563
note 'TN61- Articulated Walling'.
Articulated joints are to be placed at sides of openings and
behind downpipes unless noted otherwise. TERMITE PROTECTION Drawing Title:
All wet areas are to have floor wastes with local fall to Must be inaccordance with AS 3660.1.2000, 'Termite management. Part 1.
floor wastes. New building work.
1 Foundation Layout FOUNDATION LAYOUT
All dimensions and levels on plans are to be confirmed
on site prior to commencing construction.
Areas not protected by chemicals in accordance with AS 2057
to have physical barriers in accordance with AS 1694.
1:100
Scale:
As Shown @ A3 Size Date: 05.10.2020
Status: Checked By: NPH
CD
Project No: Drawing No.:
CDP107 SD11
Plot Date: 6/10/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Revised Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.