Minor Change Existing Approval 132006 272 01 (3) · 132006.272.01
18. The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any level difference. Should any driveways be
constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
the driveway be removed and reconstructed to levels that do comply.
19. All vehicles shall enter and leave the site in a forward direction.
Carparking
20. Carparking shall be provided within the site generally as shown on drawing number
0601.SK01A dated Jan 06 by Kidd & Co, except as modified herein.
21. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 1A with allowance for vehicles to enter and leave the site in forward gear and
with a minimum head clearance (headroom) at any point of 2.2m.
22. All carparking shall be kept and maintained in a condition fit for use.
Park Contributions
23. A Park contribution of $2,85 towards the acquisition of additional parkland or the
improvement of existing parkland and facilities in the locality shall be paid to the Council prior
to obtaining a Development Permit for Operational Works in accordance with Council’s
Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
March 2006 until the date of payment.
Frontage Works
24. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Angler Street frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
25. A contribution of $1,670 towards the construction of footpaths in the Angler Street local area
shall be paid to Council prior to obtaining a Development Permit for Operational Works. This
amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
March 2006 until the date of payment.
26. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
27. A pathway contribution of $641 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Consumer Price Index, All Groups Brisbane from March 2006 until
the date or payment.
Stormwater Drainage
28. All stormwater drainage shall be collected on site and discharged so there is not net increase
in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
be discharged to Council’s kerb & channel street drainage system in Angler Street. Plans
of the drainage design shall be prepared by a Registered Professional Engineer and
submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb and channel
street drainage system at any one location if 25 litres/second.
Page 4 of 11
Document Set ID: 23339788
Version: 3, Version Date: 08/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132006 272 01 (3).pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.