Minor Change Existing Approval 132006 272 01 (3) · 132006.272.01

of 11

Text shows just the words. Original shows the document exactly as it was published.

               18.    The driveway shall be designed and constructed to Council’s design standards and to grades
                      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
                      movements along the footpath without any level difference. Should any driveways be
                      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
                      the driveway be removed and reconstructed to levels that do comply.
               19.    All vehicles shall enter and leave the site in a forward direction.
               Carparking
               20.    Carparking shall be provided within the site generally as shown on drawing number
                      0601.SK01A dated Jan 06 by Kidd & Co, except as modified herein.
               21.    The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
                      for user class 1A with allowance for vehicles to enter and leave the site in forward gear and
                      with a minimum head clearance (headroom) at any point of 2.2m.
               22.    All carparking shall be kept and maintained in a condition fit for use.
               Park Contributions
               23.    A Park contribution of $2,85 towards the acquisition of additional parkland or the
                      improvement of existing parkland and facilities in the locality shall be paid to the Council prior
                      to obtaining a Development Permit for Operational Works in accordance with Council’s
                      Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
                      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
                      March 2006 until the date of payment.
               Frontage Works
               24.    Footpath improvements such as topsoiling, grassing, and tree planting are required to the
                      Angler Street frontage of the site in accordance with Planning Scheme Policy PSP1
                      Landscaping Guidelines. Grass shall be couch, free of weeds.
               25.    A contribution of $1,670 towards the construction of footpaths in the Angler Street local area
                      shall be paid to Council prior to obtaining a Development Permit for Operational Works. This
                      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
                      March 2006 until the date of payment.
               26.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                      channel, footpath paving and landscaping such as trees and grasses in accordance with
                      Council’s Standard specifications prior to commencement of the use permitted by this permit.
               Pathway Contributions
               27.    A pathway contribution of $641 towards external major pathways, in accordance with
                      Planning Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the
                      Council prior to obtaining a Development Permit for Operational Works. This amount will be
                      subject to variations in the Consumer Price Index, All Groups Brisbane from March 2006 until
                      the date or payment.
               Stormwater Drainage
               28.    All stormwater drainage shall be collected on site and discharged so there is not net increase
                      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
                      be discharged to Council’s kerb & channel street drainage system in Angler Street. Plans
                      of the drainage design shall be prepared by a Registered Professional Engineer and
                      submitted to Council prior to obtaining a Development Permit for Operational Works.
                      The maximum discharge of stormwater drainage allowable to Council’s kerb and channel
                      street drainage system at any one location if 25 litres/second.




                                                                                                         Page 4 of 11
Document Set ID: 23339788
Version: 3, Version Date: 08/11/2024

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132006 272 01 (3).pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.