               29.    Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
                      (minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank
                      can be used for swimming pools outdoor cleaning, etc) and for use in flushing of toilets
                      internal to the dwelling. All rainwater tanks are to be designed band installed in accordance
                      with Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
                      of the plumbing application in conjuct6ion with the building approval. The location and
                      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
                      approval and any overflow shall be directed to the road drainage.
               30.    All site stormwater drainage shall be by means of gravity system.
               Sewer Mains
               31.    The site shall be connected to Council’s existing sewerage reticulation systems and be
                      constructed in accordance with Council’s standards and requirements at no cost to Council.
               32.    The existing sewer mains that traverse the site adjacent to the southern and western property
                      boundaries and the ‘zone of influence’ (taken as the area within a 45 degree angle measured
                      from the invert of the sewer main to be finished surface level) of each sewer main shall be
                      accurately located and determined by a licensed Surveyor and show on all plans submitted
                      for Operational Works approval.
                      To ensure Council’s sewer mains are accessible for maintenance purposes and are
                      protected from risk of damage no structures requiring a building permit (eg. buildings,
                      swimming pools, raised decks, etc) shall be constructed within this ‘zone of influence’ and as
                      such the applicant shall amend Operational Works plans including Building plans to ensure
                      compliance. To this end the proposed pools and raised decks shall be modified to ensure
                      that not structures stands with the ‘zone of influence’ of the sewer mains.
               Town Water Supply
               33.    The site shall be connected to Council’s existing town water supply and be constructed in
                      accordance with Council’s standards and requirements at not cost to Council.
               34.    Each water connection to the water reticulation system shall extend to the properly boundary
                      and be metered. Where multiple units are served by a single service, multiple water metres
                      to be each individual unit shall be installed. All fees for the supply of water meters shall be
                      paid to the Council.
               Service Easement (Sewer)
               35.    A registered easement shall be created over the zone of influence of all sewers within the
                      subject site and over those parts of the subject site that are impacted upon by sewers on any
                      adjoining sites. The easements shall generally be parallel to a centred over the sewer main
                      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
                      within the allotment (measured from the finished surface) and be no less than 3.0m. In this
                      regard a licensed surveyor shall accurately locate all sewer mains determine the necessary
                      width of the easement, which shall be shown on any plans submitted for Operational Works
                      / Building Works approval. To this extent the surveyor shall certify that the sewer and the
                      zone of influence is wholly contained within the easement to be created.
                      In addition to this Applicant’s Solicitor shall give Council’s Solicitor and appropriate
                      undertaking in writing that the Title Deed and the easement documents will be lodged at the
                      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent
                      of Council will be attended to promptly.
                      A duty executed copy of the easement shall be submitted to Council for perusal prior to the
                      use commencing.
                      Any changes required by Council’s Solicitor must be corrected immediately.
               36.    No building or other structure shall be constructed or encroach over an easement.




                                                                                                       Page 5 of 11
Document Set ID: 23339788
Version: 3, Version Date: 08/11/2024

Used in these records

About this file

File size
198 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 132006 272 01 (3).pdf · 198 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.