Council archive · source document
Attachment 6 - Bushfire Hazard Assessment · MCU22/0118
- 26 -
Performance outcomes Acceptable outcomes Response
Impacts on Ecologically Important Areas
PO2 Bushfire mitigation measures No acceptable outcome provided R2.0
do not adversely impact on: i. based on the assessment of the Project Ecologist and Koala
1 biodiversity values, consultants (Gondwana Ecology Group and Dr. Bill Ellis) the
connectivity and ecosystem development with the hazard management program within
functioning; and and around the development footprint including the 20-metre
2 the long-term physical integrity wide APZ will have minimal impact on the sites ecological
of waterways, wetland and function. Biodiversity values and connectivity.
areas of native vegetation. ii. The proposed development is not in a wetland or waterway
and as such any bushfire mitigation measures will not impact
on the long-term integrity of either geographical feature
iii. based on the maintenance of key numbers and types of
mature and sub-mature tree species within the development
footprint, the development and the proposed bushfire
mitigation measures will not have a significant impact on the
site’s native vegetation.
Water Supply for Fire Fighting Purposes
PO3 Development provides an AO3.1 Premises are connected to the reticulated water R3.1
adequate water supply for fire supply. i. the premises will be connected to the Shires reticulated
fighting purpose which is reliable, Editor's note—For reconfiguring a lot, water supply water supply.
safely located and freely needs to provide for a minimum flow and pressure of
accessible. 10 litres a second at 200kPa at all times for fire fighting R3.2
purposes i. not relevant as complies with AO3.1
OR
AO3.2 Where there is no available reticulated water
supply, the premises has:
1 an accessible dam, swimming pool or water tank
available for fire fighting purposes with an onsite
water volume of not less than 5,000 litres; and
2 a water supply outlet pipe 50 millimetres in diameter
fitted with a standard fire brigade fitting connected to
the water supply (other than where the water supply
is in a swimming pool or dam).
RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD 17 JUNE 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Bushfire Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.