Attachment 6 - Bushfire Hazard Assessment · MCU22/0118
- 27 -
Performance outcomes Acceptable outcomes Response
Editor’s Note—Water supply capacity for fire fighting
purposes is in addition to water supply capacity for
other uses and activities on the premises.
Essential Community Infrastructure
PO4 Essential community AO4.1 Development involving essential community R4.1
infrastructure is able to function infrastructure is not located within a medium or high i. The development does not involve Essential Community
effectively during and immediately bushfire hazard area. OR Infrastructure
after bushfire events.
AO4.2 Where located in a medium or high bushfire R4.2
hazard area, development involving essential i. The above report clearly demonstrates based on the QFES
community infrastructure is designed to function and SPP Natural Hazards, Risk and Resilience Bushfire
effectively during and after a bushfire event in hazard mapping that the proposed development footprint in
accordance with a Bushfire Hazard Management Plan. not within or within 100 metres of a bushfire hazard area.
Editor’s Note— PSP8 Natural Hazards provides
guidance for assessing bushfire hazard risk and
preparing a bushfire hazard management plan.
Hazardous Materials
PO5 Public safety and the AO5 Hazardous materials are not manufactured or R5
environment are not adversely stored in bulk in a bushfire hazard area. i. The proposed development will not involve the storage or
affected by the impacts of bushfire manufacture of any hazardous material.
on hazardous materials
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6 Roads provide for easy and AO6.1 The road layout provides for through-roads and R6.1
safe evacuation of residents of avoids cul-de-sacs and dead-end roads. i. The development proposal is for 9 eco-cabins all within
premises and access by OR walking distance of a car parking area which is within
emergency services. AO6.2 The development has a perimeter road reserve walking distance of the main access roadway into the RACV
with a minimum width of 20 metres and maximum Noosa Resort from Noosa Drive. Therefore the car parking
gradient of 12.5%. area is not considered to be a roadway.
OR R6.2
AO6.3 Cul-de-sacs or no-through roads are provided i. The development does not contain a perimeter roadway.
RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD 17 JUNE 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Bushfire Hazard Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.