Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Attachment 6 - Bushfire Hazard Assessment · MCU22/0118

of 35

Text shows just the words. Original shows the document exactly as it was published.

                                                                               - 27 -


    Performance outcomes                             Acceptable outcomes                                                    Response
                                   Editor’s Note—Water supply capacity for fire fighting
                                   purposes is in addition to water supply capacity for
                                   other uses and activities on the premises.
Essential Community Infrastructure
PO4 Essential community            AO4.1 Development involving essential community               R4.1
infrastructure is able to function infrastructure is not located within a medium or high         i. The development does not involve Essential Community
effectively during and immediately bushfire hazard area. OR                                         Infrastructure
after bushfire events.
                                   AO4.2 Where located in a medium or high bushfire              R4.2
                                   hazard area, development involving essential                  i. The above report clearly demonstrates based on the QFES
                                   community infrastructure is designed to function                 and SPP Natural Hazards, Risk and Resilience Bushfire
                                   effectively during and after a bushfire event in                 hazard mapping that the proposed development footprint in
                                   accordance with a Bushfire Hazard Management Plan.               not within or within 100 metres of a bushfire hazard area.

                                       Editor’s Note— PSP8 Natural Hazards provides
                                       guidance for assessing bushfire hazard risk and
                                       preparing a bushfire hazard management plan.
Hazardous Materials
PO5 Public safety and the              AO5 Hazardous materials are not manufactured or           R5
environment are not adversely          stored in bulk in a bushfire hazard area.                 i. The proposed development will not involve the storage or
affected by the impacts of bushfire                                                                 manufacture of any hazardous material.
on hazardous materials
manufacturing or storing in bulk.
Access and Evacuation Routes
PO6 Roads provide for easy and         AO6.1 The road layout provides for through-roads and      R6.1
safe evacuation of residents of        avoids cul-de-sacs and dead-end roads.                    i. The development proposal is for 9 eco-cabins all within
premises and access by                 OR                                                           walking distance of a car parking area which is within
emergency services.                    AO6.2 The development has a perimeter road reserve           walking distance of the main access roadway into the RACV
                                       with a minimum width of 20 metres and maximum                Noosa Resort from Noosa Drive. Therefore the car parking
                                       gradient of 12.5%.                                           area is not considered to be a roadway.
                                       OR                                                        R6.2
                                       AO6.3 Cul-de-sacs or no-through roads are provided        i. The development does not contain a perimeter roadway.

                                  RFA18-048 – 22 - RACV NOOSA RESORT – ECO-CABINS - BUSHFIRE HAZARD ASSESSMENT AND MITIGATION PLAN
ROB FRIEND & ASSOCIATES PTY LTD                                                                                                                    17 JUNE 2022

Used in these records

About this file

File size
7.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Bushfire Hazard Assessment.pdf · 7.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.